Tender Value
₹37.3 L
EMD Value
₹85,260
Closing Date
6 Sept 2025, 7:30 pmClosed
Karnataka Power Transmission Corporation Limited
Replacement of failed 100MVA, 220/110kV power transformer with associated accessories at 220kV R/s Shahapur in Shahapur Taluk Yadgir District on TTK basis including Dismantling of 100MVA, 220/110kV Power transformer with associated accessories at 220kV R/s Allipura in Ballari district and Transportation of the Same with loading -unloading and erection of the same at 220kV Shahapur involving all materials/ equipments, including testing and commissioning
KPTCL/2025-26/SS/WORK_INDENT2579
KPTCL/2025-26/SS/WORK_INDENT2579
Open
Sub-Station
Two Tender Document System(Two Cover)
KPTCL CEE Transmission Zone Office Kalburgi
₹940
₹85,260
26 Aug 2025
26 Aug 2025
8 Sept 2025
30 Aug 2025
Transportation of transformer, loaded in 81 to 120MT truck & trailer, from 220kV Allipura R/S to 220KV R/S Shahpur distance of kms 220X2= 440Kms (Mini,Distance=250 kms) [MWSR Revised 132kV 23-24, 440X...
Transportation of transformer accessories loaded in 10MT lorry from 220kV Allipura R/S to 220KV R/S Shahpur distance of 220kms X2= 440Kms (More than 250kms distance) [[MWSR Revised 132kV 23-24 page ...
Transportation of empty oil barrels from KPTCL Ballari store to 220kV R/s Alipur and Transil Oil in Barrels, other materials from 220kV R/s KPTCL Alipur to 220kV R/s Shahapur Site..etc Using 10MT Lor...
Transportation of Empty Barrels and other materials from 220kV R/s Shahapur to KPTCL Stores Kalaburagi ..etc, Using 10MT Truck & Trailor.Note: minimmum 250 Kms to be considered.250Kms X81.99=Rs 20498...
Refiling of Transformer with nitrogen gas after draining out of oil for transportation Purpose (7 kg cylinders -10Nos), but payment will be made as per actual after submitting the necessary document...
Insurance charges as per RtNo
(approx value, exact value can be arrived once received WDV of trf.)
Moving the power transformer from Bed point to loading point at Allipura 220KV R/S 15Mtr X 86MT = 1290MT/Mtr.[MW SR.23-24 page No.116 item 9(a)]
Loading of Power Transformer's accessories like radiators, Conservator tank, Bushings, RTCC panel and oil barrels etc complete at Allipura 220KV R/S [MWSR Revised 132kV page No.42 item.2(i) ]
Unloading of Power Transformer's accessories like radiators, Conservator tank, Bushings and oil barrels etc complete at 220KV R/S KPTCL Shahpur[MWSR Revised 132kV page No.42 item.2(ii) ]
Moving the Transformer from unloading point to the bed 25Mtr X 86MT=2150 MT/Mtr. [MW SR.23-24 page No.116 item 9(a)]
Assembling of Transformer Parts like Bushing Radiator, Filling of Oil into Transformer etc, for the total weight of the transformer [MW SR.23-24 page No.116 item 9(b) for the total weight of the tran...
Filtration of Oil using Filter Set by the Contractor to bring the Insulation Value to IE specification. [MW SR.23-24 page No.116 item 9(d)
Wiring of Transformer Marshelling Box, Buchholz relay, fixing thermo meter, OLTC up to Control Panel. MW SR.23-24 page No.116 item 9(f)(iii).
Fabrication of transformer railling,embedding in transformer plinth.
Inspection of wires and ferrules,wiring of protection devices,cooling fans,oil flow pumps, oltc,RTCC,bushing etc
Testing of power transformer Ratio test, sc test,high pot test,MB test, vector group test,HV test, stability tests,winding and insulation resistance tests,tan delta and capacitance tst,sweep frequency...
Erection of released NCT and PI mounting structure 4No's (0.158 X 4=0.632 MT) (LV NCT Structures)
Erection of NCT's including movement from the point of unloading to the point of erection with grounding connections.[MW SR.23-24 page No.118 item 14(a)]
Erection of RTCC Panel aliignment & fixing properly to foundation including movement from unloading to the point of erection [MW SR.23-24 page No.120 item23(a)]
Wiring of RTCC panel:Identification,ferulling,cropping and termination of wirer in RTCC Panel[MW SR.23-24 page No.121 item 23(c)]
Nitrogen Fire Protection System(NIFPS) of Power Transformer - Re-commissioning of NIFPS in case of replacement of power transformers (Includes all modification works required to connect all the acces...
Nitrogen Fire Protection System(NIFPS) of Power Transformer -NIFPS and other modification works like oil drain paipe, flange, repce ment of gaskets and valve if necessary with required materials along...
Deputing 100MVA T&R make Transformer Manufactured firm service Engineer for assisting in Testing and Commissioning of 100MVA Power Transformers at 220kV R/s Shahapur
Grounding of equipments with GI Flat of 50X6mm connecting to the equibments to to the earth mat/ ground pit,Each point of earthing to the all formation works like bending, twisting and drilling etc co...
Dismantling of Transformer Parts like Bushing Radiator, Releasing of Oil from Transformer etc, at 220kV R/S KPTCL Allipur [MW SR.23-24 page No.116 item 9(b)for the total weight of the transformer]
Moving the Transformer from bed to loading point 25MtrX86 MT=2150 MT/Mtr.[MW SR.23-24 page No.116 item 9(a)]
Wiring of Transformer marshalling box, bucholtz relay, fixing thermometer, OLTC upto control panel and assisting in testing and commissioning by RT/MT/Firm Engineers. [MW SR.23-24 page No.116 item 9f...
Dismantling of 220kV NCT's including movement from the point of unloading to the safer point. MW SR.23-24 page No.118 item 15(a)
Dismantling of RTCC Panel aliignment & fixing properly to foundation including movement from unloading to the point of erection Rate: 5959[MW SR.23-24 page No.116 item 8(b) ]
Dismantling of RTCC Wirring panel:Identification,ferulling,cropping and termination of wirer in RTCC PanelRate:Rs 11418[MW SR.23-24 page No.118 item 15(a)]
Releasing of existing NCT and PI mounting structure 4No's (0.158 X 4=0.632 MT) (LV NCT Structures )
Dewiring of existing NCT's
Dismantling of Transformer Parts like Bushing Radiator, Releasing of Oil from Transformer etc, at 220kV R/S KPTCL Shahpur [MW SR.23-24 page No.116 item 9(b) for the total weight of the transformer]
Moving the Transformer from bed to Safer point 25MtrX86 MT=2150 MT/Mtr [MW SR.23-24 page No.116 item 9(a)]
Releasing the Wiring of Transformer marshalling box, bucholtz relay, fixing thermometer, OLTC upto control panel and assisting in testing and commissioning by RT/MT/Firm Engineers. [MW SR.23-24 page N...
Dismantling of Earth connections (MB,DM, 2 for Transformer Body) [Page No.81 item No.11(b) MWSR 2019]
Dismantling of 220kV NCT's including movement from the point of unloading to the safer point.MW SR.23-24 page No.118 item 14(a)
Dismantling of RTCC Panel aliignment & fixing properly to foundation including movement from unloading to the point of erection Rate: 5959 [MW SR.23-24 page No.116 item 8(b)]
Dismantling of RTCC Wirring panel:Identification,ferulling,cropping and termination of wirer in RTCC Panel Rate:Rs 11418[MW SR.23-24 page No.118 item 15(a) ]
Releasing of existing NCT and PI mounting structure 4No's (0.158 X 4=0.632 MT) (LV NCT Structures )
Dewiring of existing NCT's
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .