DALCHAND
Municipal Council Nuh
constriction of RCC drain from dheemar chowk to paldi road in ward 12 in mc nuh
2026_HRY_541671_1
20261B063057 B2E5 409F 9600 0A32122FACCD337ULB
Open Tender
Civil Works
Works
150 days
MC Nuh
2 documents required · 2 mandatory
₹5,000
₹64,000
Yes
18 Aug 2026
18 Aug 2026
26 Aug 2026
18 Aug 2026
25 Aug 2026
18 Aug 2026
18 Aug 2026 - 25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 80.5 | cum | 1,863 | ₹1,49,971.5 |
| 2 | [21.54]Constructing standard drain type II drain complete consisting of cement concrete drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be 1:3:6 Paris by volume of cement sand stone Bajri and rendering to be 1:1 cement and mortar. [Through Rate] | 350 | Metre | 363 | ₹1,27,050 |
| 3 | [3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km] | 477.75 | cum | 83 | ₹39,653.25 |
| 4 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 682.5 | cum | 78 | ₹53,235 |
| 5 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 174.3 | cum | 4,374 | ₹7,62,388.2 |
| 6 | [6.18]Reinforced cement concrete work in arches, arch ribs, domes, vaults, shells, folded plate and roofs having slope more than 15° up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate] | 47.25 | cum | 6,149 | ₹2,90,540.25 |
| 7 | [6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate] | 2,481.5 | Sqm | 156 | ₹3,87,114 |
| 8 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate] | 21,000 | Kg. | 66 | ₹13,86,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_621094.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].