| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC 10 NIGAHI MODE POST NIGAHI DISTT SINGRAULI M P 486684 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486684 | L1 | Accepted-AOC AS PER TC DELIBERATION | |
| 2 | L2₹12.7 L+₹1.3 L (11.0%)Rejected-Finance PLOT NO 17 18 EWS COLONY DISTT SINGRAULI M P PIN 486889 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486889 | L2 | Rejected-Finance NOT L1 BIDDER | |
| 3 | L3₹14.1 L+₹2.6 L (22.8%)Rejected-Finance | L3 | Rejected-Finance NOT L1 BIDDER | |
| 4 | L4₹14.2 L+₹2.7 L (24.0%)Rejected-Finance MAIN ROAD BEALUNJI P O WAIDHAN DISTT SINGRAULI M P | SINGRAULI | MADHYA PRADESH | L4 | Rejected-Finance NOT L1 BIDDER |
Tender Value
₹22.1 L
EMD Value
₹27,700
Closing Date
25 Jul 2022, 11:00 amClosed
GM(EnM), Nigahi
Office of the GM(EnM), Nigahi Area, NCL, PIN 486884
electrical maintenance (dust removal and panel cleaning) of Phase-II(Package-A and B) CHP of Nigahi Project for the period of one year(365 days).
2022_NCL_249060_1
NGH/EM/e-Tender/22-23/12 dtd. 05.07.2022
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
NCL, Nigahi Project
as per NIT
4 documents required · 4 mandatory
₹27,700
19 Aug 2022
5 Jul 2022
26 Jul 2022
5 Jul 2022
25 Jul 2022
6 Jul 2022
5 Jul 2022 - 12 Jul 2022
Amount
Electrical maintenance (dust removal & cleaning) of HT and LT installations of Phase II (Package A & B) CHP of Nigahi Project: (A) -day to day cleaning of PA System and other electronic equipments, Electrical Panel of EOT Cranes, Electric Hoists, Rock Breakers, Apron Feeders, Crushers, Magnetic Separators, Conveyor drive houses, safety switches, trippers, Plough feeders, Dust suppression system, Silo floors, Lighting distribution panels. All HT & LT drives and all electrical Junction boxes of Phase-Il CHP (whenas and whereas required). (B)- day to day cleaning of dust in the HT and LT Panels (MCCs) of all substations and control desk and PLCs panels of all control rooms. Power & lighting transformers of all substations. All pump motors and starters panels at pump houses of Phase II CHP (whenas and whereas required). (C)-day to day cleaning of cable trays, cable celler rooms, welding power recepticles and welding M/c, lifts and glass cleaning of light fittings installed in the Phase-Il CHP (whenas and whereas required).
Total impact of GST for the purpose of CTC
M/S SARCO ENGINEERING WORKS
MAGADH ENTERPRISES
M/s Shiv Shankar Electrical Civil Engineering
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_257300.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .