Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹31.4 LAdmitted-Finance | -0.03% | ₹31.4 L | L1 | Admitted-Finance |
| 2 | L2₹31.4 L+₹942.02 (0.03%)Admitted-Finance B 16 AMBEDKAR PURAM DELHI ROAD SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | +0.00% | ₹31.4 L+₹942.02 (0.03%) | L2 | Admitted-Finance |
| 3 | L3₹32.1 L+₹66,883.27 (2.13%)Admitted-Finance JANAKPURI C 3 146 JANAKPURI 110058 | JANAKPURI | DELHI | DELHI | 110058 | +2.10% | ₹32.1 L+₹66,883.27 (2.13%) | L3 | Admitted-Finance |
Tender Value
₹31.4 L
EMD Value
₹3.1 L
Closing Date
27 Jul 2026, 5:00 pmClosed
EO, NPP Baraut
NPP Baraut
11 - Kasba Baraut Ward No. 22 Kidwai Nagar mai Manjoor ke makan se Shokin ke makan tk R.C.C nala nirman karya.
2026_DOLBU_1164029_11
207/2026-27, Dt. 15-06-2026
Open Tender
Miscellaneous Works
Percentage
180 days
Baraut
Tender Fee EMD and other documents as per tender documents/NIT
2 documents required · 2 mandatory
₹3,705
EO, NPP Baraut
₹3.1 L
25 Aug 2026
26 Jun 2026
28 Jul 2026
26 Jun 2026
27 Jul 2026
26 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation /mud cleaning for nalla contruction in comp.position | - | cum | 112.5 | - |
| - | Disposal surplus earth from site up to 90% lead 5.0km | - | cum | 167 | - |
| - | Water dirvision charge for nalla contruction work | - | hours | 300 | - |
| - | Dismentling 0f old nalla brick work in cement mortar (s.i-692) | 0.2 | cum | 400 | ₹80 |
| - | Construction of embankment /patri with material obtained from borropit cartage 5.00km . Construction of embankment / patri with material obtained from borropits cartage 5.00 km . Construction of embankment /patri with approved material obtained from borrow pits with all lift and leads transporting to site spreading grading to required slope and compacting to meet requirement of table 300.2 | - | cum | 270 | - |
| - | provinding and laying in position cement concrete of specifed grade excluding the cost of centering and shuttering 1;4;8 (1 cement 4 coarse sand zone 111)derived from natural sources 8 grade stone aggregates 40mm nominal size derived from natural source ) DSR 2023SI.NO. 4.1.8 | - | cum | 5,100 | - |
| - | Rcc work in (1:1;5;3) mortar in plinth beam with 2cm gauge stone grit cement c/sand including all material labour tools etc in comp.position DSR 2023 SI NO 5.2.2 | 1 | cum | 8,122 | ₹8,121.19 |
| - | Reinforcement and its bending but excluding its fixing and bending centring and shuttering including all material labour tools etcin comp position (s.i-504) | 0.8 | qtl | 8,500 | ₹6,800 |
| - | Deduct the old brick bats cost | - | cum | 900 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.18 MB
Tendernotice_2.pdf
PDF • 1.23 MB
Tendernotice_3.pdf
PDF • 1.33 MB
BOQ_2182857.xls
BOQ • 0.29 MB
Date_Extend.pdf
PDF • 0.18 MB
Date_Extend.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .