Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹5.3 L+₹34,639.61 (6.95%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹5.7 L+₹70,211.87 (14.1%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹5.7 L+₹72,788.30 (14.6%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | PRADEEPA PRABHAKARAN L3 | MARIMUTHU ALAGAR L1 | LAXMI CONSTRUCTION L2 | S V VANMEEKANATHAN L4 |
|---|---|---|---|---|---|---|---|
| 1.00Name of the work: Construction of Passenger shelter at Kiliyur vilakku (Near Govt High school ) in Karkalathur Panchayat | |||||||
| 2.00 | Earth work excavation for foundation in all soils and sub soil as per SS20B fo foundation etc complete. | 13.92 | cum | 200 ₹2,784 Lowest | 224.21 ₹3,121 | 246 ₹3,424.32 | 220 ₹3,062.4 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc | 4.12 | cum | 5,650 ₹23,278 | 4,889.13 ₹20,143.22 Lowest | 5,730 ₹23,607.6 | 5,660 ₹23,319.2 |
| 4.00 | Filling with Collected Gravel including cost & conveyance of all materials to site etc | 8.23 | cum | 525 ₹4,320.75 Lowest | 554 ₹4,559.42 | 890 ₹7,324.7 | 525 ₹4,320.75 Lowest |
| 5.00 | Supllying filling with sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc | 2.27 | cum | 2,000 ₹4,540 | 1,723 ₹3,911.21 Lowest | 2,100 ₹4,767 | 2,000 ₹4,540 |
| 6.00 | Brick Work in cement mortar 1:5 mix using country bricks of size (8 ¾ x 4 ¼ x 2 ¼) including cost & conveyance of all materials to site etc | 9.49 | cum | 6,100 ₹57,889 | 5,233.9 ₹49,669.71 Lowest | 6,000 ₹56,940 | 6,100 ₹57,889 |
| 7.00 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to work site | 9.82 | cum | 9,500 ₹93,290 | 8,073 ₹79,276.86 Lowest | 9,200 ₹90,344 | 9,500 ₹93,290 |
| 8.00 | Supplying and fabrication of steel,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc | 920.94 | Kg | 92 ₹84,726.48 | 78.2 ₹72,017.51 Lowest | 88 ₹81,042.72 | 92 ₹84,726.48 |
| 9.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete For Coloum | 17.25 | sqm | 1,050 ₹18,112.5 | 930.75 ₹16,055.44 | 516 ₹8,901 Lowest | 1,065 ₹18,371.25 |
| 10.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete For Grade beam | 10.25 | sqm | 525 ₹5,381.25 | 465.38 ₹4,770.15 Lowest | 516 ₹5,289 | 525 ₹5,381.25 |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
24 Sept 2026, 3:00 pmClosed
Block development officer BP
BDO BP devakottai
Passenger shelter Kiliyur vilakku
2026_RDTN_703085_1
Passenger shelter Kiliyur vilakku
Open Tender
Civil Works
Item Rate
Devakottai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,000
24 Sept 2026
10 Sept 2026
24 Sept 2026
10 Sept 2026
24 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of the work: Construction of Passenger shelter at Kiliyur vilakku (Near Govt High school ) in Karkalathur Panchayat | - | - | - | - |
| 2 | Earth work excavation for foundation in all soils and sub soil as per SS20B fo foundation etc complete. | 13.92 | cum | - | - |
| 3 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc | 4.12 | cum | - | - |
| 4 | Filling with Collected Gravel including cost & conveyance of all materials to site etc | 8.23 | cum | - | - |
| 5 | Supllying filling with sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc | 2.27 | cum | - | - |
| 6 | Brick Work in cement mortar 1:5 mix using country bricks of size (8 ¾ x 4 ¼ x 2 ¼) including cost & conveyance of all materials to site etc | 9.49 | cum | - | - |
| 7 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to work site | 9.82 | cum | - | - |
| 8 | Supplying and fabrication of steel,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc | 920.94 | Kg | - | - |
| 9 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete For Coloum | 17.25 | sqm | - | - |
| 10 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete For Grade beam | 10.25 | sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_845163.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .