| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.7 L+₹1,963.98 (1.19%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.9 L+₹21,603.79 (13.1%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹1.9 L+₹29,440.07 (17.8%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹2.0 L+₹30,441.70 (18.5%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
8 Jul 2026, 4:00 pmClosed
XEN REW Kathua
xenrew
Constt. Of Lane by way of Interlocking Tiles From(i) The shop of Ram Lal Jatt to the H/o Sanjeev Kumar and Ors, W. No. 07 (ii) Main Road to the House of Pritam Singh and Ors, W. No.7 , Pyt. Dewal, Block Billawa
2026_RDPR_314245_51
e-NIT No.68/REW/K of 2026-27 Dated 02/07/2026
Open Tender
Civil Works
Percentage
90 days
Billawar
sbd
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹3,920
23 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
8 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. Allow 75% | 153.81 | sqm | 24.14 | ₹3,712.97 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth 1 meter from cutting edge in all kinds of soil. | 2.01 | cum | 479.3 | ₹963.39 |
| 3 | Providing and laying in position dry stone aggregarte. All work upto plinth level with(stone aggregate of 40mm nominal size ) including spreading, compacting, and consolidation in all respect | 7.49 | cum | 1,700 | ₹12,733 |
| 4 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. 20% boulders | 2.69 | cum | 4,774.46 | ₹12,843.3 |
| 5 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 7.06 | cum | 5,733.6 | ₹40,479.22 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 4.41 | sqm | 286.35 | ₹1,262.8 |
| 7 | Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of aproved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge | 144.98 | sqm | 816.15 | ₹1,18,325.43 |
| 8 | Carriage of Sand and bajree for an Av. Lead 3.0 km | 19.9 | cum | 163.5 | ₹3,253.65 |
| 9 | Carriage of tiles Av. Lead of 3.0Km by MT | 5,074 | no | 0.26 | ₹1,324.31 |
| 10 | Add provision for CIB | 1 | no | 1,500 | ₹1,500 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.03 MB
BOQ_1017825.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .