| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 CrAdmitted-Finance 1104 QUANTUM TOWER RAM BAUG LANE MALAD WEST MUMBAI MAHARASHTRA 400064 UDYAM MH 18 0008080 | MUMBAI SUBURBAN | MAHARASHTRA | 400064 | L1 | Admitted-Finance | |
| 2 | L2₹18.6 Cr+₹7.3 Cr (64.8%)Admitted-Finance A 1 MONARCH CASTLE CHS LTD HANUMAN ROAD VILE PARLE EAST MUMBAI 400057 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical Technically Disqualified | |
| 4 | Rejected-Technical | - | Rejected-Technical Technically Disqualified | |
| 5 | Rejected-Technical | - | Rejected-Technical Technically Disqualified |
| Sl No | Description | Qty | Unit | Mahendra Realtors & Infrastructure Limited L1 | P.B.Construction Company L2 |
|---|---|---|---|---|---|
| 1.00 | INTERNAL RENOVATION WORKS OF FLATS AND COMPLETE RENOVATION AT NARARD STAFF QUARTERS. DAMODAR PARK.GHATKOPAR(W), MUMBAI. Enabling System:-DOUBLE SCAFFOLDING SYSTEM (cup lock type)
Providing and fixing double scaffolding system (cup lock type) on the exterior side of G + 13 storeyed building/structure for all heights above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform, net for capturing falling debris, hessian fabric cloth ( having opaqueness > 90 % ) for safety etc. and maintaining it in a serviceable condition during execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval ofconsultant.
Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once (one time) only for execution of all the items of works requiring scaffolidng (3) No extra/additional payment shall be made for removal and refixing of scaffolding, if done by the contractor for any reason/s. (4) Entire scaffolding material used shall be the property of the contractor and shall be removed and taken away by the contractor after completion of work. (5) Any damages to the wall and other parts of the building caused due to the fixing and removing of scaffolding shall be repaired by the contractor on his own cost. | 24,975 | SQM | 175 ₹51,57,337.5 Lowest | 300 ₹88,41,150 |
| 2.00 | WINDOW COVERING :
a) Providing and fixing 6 mm thick old/ new commercial plywood in servicable condition with jungle wood frame work of 50 x 35 mm size at 60 cm on One ways for closing the window portion/openings for protection from falling debris, dust etc. including cutting, fixing with nails and removing after the same after completion of the work. (In event of any damage to existing windows, shall be the same shall be repaired by the contractor on his own cost) | 2,700 | SQM | 375 ₹11,94,750 | 320 ₹10,19,520 Lowest |
| 3.00 | BREAKING OF EXTERNAL / INTERNAL PLASTER: USING Chisel & Hammers
Dismantling/ Removal of the existing old plaster (both internal and external) of any thickness and at all levels by chisel & hammer / cutter plate or skirting including raking out joints and cleaning the surface for re-plaster. Rates quoted to include removing all debris, spalls, including cleaning the site, lowering down the debris to the ground without causing dust nuisance and damage to the structure and disposing & carting away the debris outside the building compound upto the municipal dump site with necessary municipal permision with all lead and lift. | 29,205 | SQM | 65 ₹22,40,023.5 Lowest | 190 ₹65,47,761 |
| 4.00 | DEMOLISHING BRICK WORK : Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material outside the building compound to the municipal dump grounds with required municipal permission for all lead and lifts as per direction ofconsultant. | 10 | CUM | 800 ₹9,440 | 650 ₹7,670 Lowest |
| 5.00 | DISMANTLING OF TERRACE WATERPROOFING: Removing the existing waterproofing layers of china mosaic flooring and bedding brick bat coba of any thickness on the existing terrace including cement vatta ( wherever required) and exposing the RCC slab surface and cleaning it. Rates shall be quoted to include removing all debris, spalls, including cleaning the site, lowering down the debris to the ground floor without causing dust nuisance and damage to the structure and disposing & carting away the debris outside the building compound upto the municipal dump with required municipal permision with all lead and lift, etc. complete as directed. | 505 | SQM | 125 ₹74,487.5 Lowest | 270 ₹1,60,893 |
| 6.00 | M.S. STEEL PROPS:-
Providing and fixing in vertical position telescopic M.S.prop under deflected beam/lintel/slab/chajjas by using wooden battens of size 1000 x 80 x 80 for packing between prop plate and the beam/lintel/slab/chajjas bottom surface to support the structure member beneath provisionally during strucutural repair and jacketting of that member etc. and maintaining them in the position till required time at the required locations as per the directions ofconsultant. Note: The work shall be executed only with the prior approval of theconsultant. | 500 | NOS | 100 ₹59,000 Lowest | 1,850 ₹10,91,500 |
| 7.00 | REMOVING THE EXISTING Mild Steel(MS) GRILL: (LIVING ROOM , BEDROOM & KITCHEN WINDOWS) ( UPTO SIZE 3 X 1.50M)
Dismantling the existing M.S.Grills made up of angles, tees, flats, channels, etc. including all gusset plates, bolts, nuts, cutting rivets, welding, etc. carefully including dismembering complete work as directed for, at all locations in the building and taking away the same and providing buy back for the items mentioned later in the BoQ | 834 | NOS | 200 ₹1,96,824 Lowest | 300 ₹2,95,236 |
| 8.00 | REMOVING THE EXISTING MS GRILL: (WC & BATH WINDOWS) (SIZE 0.90 X 0.60 M)
Dismantling the existing M.S.Grills made up of angles, tees, flats, channels, etc. including all gusset plates, bolts, nuts, cutting rivets, welding, etc. carefully including dismembering complete work as directed for, at all locations in the building and taking away the same and providing buy back for the items mentioned later in the BoQ. | 492 | NOS | 200 ₹1,16,112 Lowest | 250 ₹1,45,140 |
| 9.00 | TEMPORARY PROTECTION TO FLOORING : Providing temporary protection to flooring using PVC sheet & plaster of paris, wherever required as per the directions ofconsultant. This protection is to be retained till completion of works in the areas and handing over of the area to the bank so as to prevent damage to the flooring during execution of works inside the flats and removing the same after completion of work and carting away the debris outside the building compound up to the municipal dump with required municipal permission with all lead and lifts, etc. complete | 1,600 | SQM | 100 ₹1,88,800 Lowest | 100 ₹1,88,800 Lowest |
| 10.00 | Removing/Taking out doors, windows and clerestory window shutters (steel or wood) of area 3 Sq. Meters and below including its frames, architraves, holdfast, jambs, etc. at all locations and stacking the dismantled materials within the building compound at designated location including all leads & lifts, etc. complete as instructed and directed | 30 | NOS | 150 ₹5,310 Lowest | 350 ₹12,390 |
Tender Value
Refer Docs
EMD Value
₹64.6 L
Closing Date
29 Nov 2025, 3:00 pmClosed
CGM, DPSP
NABARD HO BKC Mumbai
TENDER for STRUCTURAL REPAIRS, EXTERNAL REPAINTING, RECTIFICATION OF SEEPAGE, INTERNAL RENOVATION OF FLATS, AT NABARD STAFF QUARTERS BUILDING NO. 5 (5A, 5B, 5C, 5D, 5E), DAMODAR PARK, GHATKOPAR (W), MUMBAI
2025_NABA_883865_1
REF. NO. NB. DPSP/ HO/ Ghatkopar Bldg no. 5 /109859/2025-26
Open Tender
Civil Works
Item Rate
NABARD Colony Damodar Park Ghatkopar West
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹64.6 L
Yes
Conference Room DPSP NABARD HO BKC
28 Jan 2026
3 Nov 2025
1 Dec 2025
3 Nov 2025
29 Nov 2025
3 Nov 2025
13 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | INTERNAL RENOVATION WORKS OF FLATS AND COMPLETE RENOVATION AT NARARD STAFF QUARTERS. DAMODAR PARK.GHATKOPAR(W), MUMBAI. Enabling System:-DOUBLE SCAFFOLDING SYSTEM (cup lock type)
Providing and fixing double scaffolding system (cup lock type) on the exterior side of G + 13 storeyed building/structure for all heights above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform, net for capturing falling debris, hessian fabric cloth ( having opaqueness > 90 % ) for safety etc. and maintaining it in a serviceable condition during execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval ofconsultant.
Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once (one time) only for execution of all the items of works requiring scaffolidng (3) No extra/additional payment shall be made for removal and refixing of scaffolding, if done by the contractor for any reason/s. (4) Entire scaffolding material used shall be the property of the contractor and shall be removed and taken away by the contractor after completion of work. (5) Any damages to the wall and other parts of the building caused due to the fixing and removing of scaffolding shall be repaired by the contractor on his own cost. | - | SQM | 1 | - |
| 2 | WINDOW COVERING :
a) Providing and fixing 6 mm thick old/ new commercial plywood in servicable condition with jungle wood frame work of 50 x 35 mm size at 60 cm on One ways for closing the window portion/openings for protection from falling debris, dust etc. including cutting, fixing with nails and removing after the same after completion of the work. (In event of any damage to existing windows, shall be the same shall be repaired by the contractor on his own cost) | - | SQM | 1 | - |
| 3 | BREAKING OF EXTERNAL / INTERNAL PLASTER: USING Chisel & Hammers
Dismantling/ Removal of the existing old plaster (both internal and external) of any thickness and at all levels by chisel & hammer / cutter plate or skirting including raking out joints and cleaning the surface for re-plaster. Rates quoted to include removing all debris, spalls, including cleaning the site, lowering down the debris to the ground without causing dust nuisance and damage to the structure and disposing & carting away the debris outside the building compound upto the municipal dump site with necessary municipal permision with all lead and lift. | - | SQM | 1 | - |
| 4 | DEMOLISHING BRICK WORK : Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material outside the building compound to the municipal dump grounds with required municipal permission for all lead and lifts as per direction ofconsultant. | - | CUM | 1 | - |
| 5 | DISMANTLING OF TERRACE WATERPROOFING: Removing the existing waterproofing layers of china mosaic flooring and bedding brick bat coba of any thickness on the existing terrace including cement vatta ( wherever required) and exposing the RCC slab surface and cleaning it. Rates shall be quoted to include removing all debris, spalls, including cleaning the site, lowering down the debris to the ground floor without causing dust nuisance and damage to the structure and disposing & carting away the debris outside the building compound upto the municipal dump with required municipal permision with all lead and lift, etc. complete as directed. | - | SQM | 1 | - |
| 6 | M.S. STEEL PROPS:-
Providing and fixing in vertical position telescopic M.S.prop under deflected beam/lintel/slab/chajjas by using wooden battens of size 1000 x 80 x 80 for packing between prop plate and the beam/lintel/slab/chajjas bottom surface to support the structure member beneath provisionally during strucutural repair and jacketting of that member etc. and maintaining them in the position till required time at the required locations as per the directions ofconsultant. Note: The work shall be executed only with the prior approval of theconsultant. | - | NOS | 1 | - |
| 7 | REMOVING THE EXISTING Mild Steel(MS) GRILL: (LIVING ROOM , BEDROOM & KITCHEN WINDOWS) ( UPTO SIZE 3 X 1.50M)
Dismantling the existing M.S.Grills made up of angles, tees, flats, channels, etc. including all gusset plates, bolts, nuts, cutting rivets, welding, etc. carefully including dismembering complete work as directed for, at all locations in the building and taking away the same and providing buy back for the items mentioned later in the BoQ | - | NOS | 1 | - |
| 8 | REMOVING THE EXISTING MS GRILL: (WC & BATH WINDOWS) (SIZE 0.90 X 0.60 M)
Dismantling the existing M.S.Grills made up of angles, tees, flats, channels, etc. including all gusset plates, bolts, nuts, cutting rivets, welding, etc. carefully including dismembering complete work as directed for, at all locations in the building and taking away the same and providing buy back for the items mentioned later in the BoQ. | - | NOS | 1 | - |
| 9 | TEMPORARY PROTECTION TO FLOORING : Providing temporary protection to flooring using PVC sheet & plaster of paris, wherever required as per the directions ofconsultant. This protection is to be retained till completion of works in the areas and handing over of the area to the bank so as to prevent damage to the flooring during execution of works inside the flats and removing the same after completion of work and carting away the debris outside the building compound up to the municipal dump with required municipal permission with all lead and lifts, etc. complete | - | SQM | 1 | - |
| 10 | Removing/Taking out doors, windows and clerestory window shutters (steel or wood) of area 3 Sq. Meters and below including its frames, architraves, holdfast, jambs, etc. at all locations and stacking the dismantled materials within the building compound at designated location including all leads & lifts, etc. complete as instructed and directed | - | NOS | 1 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tender.pdf
Tender Documents • 5.64 MB
BOQ_929002.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .