Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAdmitted-Finance | ₹7.8 L | L1 | Admitted-Finance |
| 2 | L2₹8.0 LAdmitted-Finance | ₹8.0 L | L2 | Admitted-Finance |
| 3 | L3₹8.2 LAdmitted-Finance | ₹8.2 L | L3 | Admitted-Finance |
| 4 | L4₹9.0 LAdmitted-Finance | ₹9.0 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BABEL BROTHERS L2 | M/S Goyal Electricals L1 | M/s Jitendra Electric Store L4 | YASH ELECTRICALS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Foundation for installation of 20 Mtr. High Mast- as per the foundation drawing furnished by original equipment manufacture (OEM) of high mast. | 2 | Job | 35,000 ₹70,000 Lowest | 45,000 ₹90,000 | 40,000 ₹80,000 | 50,000 ₹1,00,000 |
| 2.00 | Safety & Security, operation and maintenance of the street light system during DLP with O&M of 3 yrs of the whole system. If failed, the fixture must be repaired within 3 days of fault, failing which penalty i.e. two times of the maintenance charges estimated by the department for each fixture for the month shall be deducted & recovered from the agency. (Note- Min. Rs.100/- per job will be held on account of O&M).Here 1 JOB is defined as per point per month | 864 | Job | 100 ₹86,400 | 90 ₹77,760 Lowest | 100 ₹86,400 | 100 ₹86,400 |
Tender Value
₹12 L
EMD Value
₹23,995
Closing Date
9 Jul 2026, 5:00 pmClosed
Additional GM
ROAD NO 2 MIA UDAIPUR
Providing anf Fixing of High Mast light at I_E Pratapnagar Udaipur
2026_RIICO_571693_1
2026/Udaipur/40029/1699
Open Tender
Electrical Works
Percentage
90 days
PRATAPNAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
RIICO UDAIPUR
₹23,995
Yes
15 Jul 2026
29 Jun 2026
10 Jul 2026
29 Jun 2026
9 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Foundation for installation of 20 Mtr. High Mast- as per the foundation drawing furnished by original equipment manufacture (OEM) of high mast. | 2 | Job | - | - |
| 2 | Safety & Security, operation and maintenance of the street light system during DLP with O&M of 3 yrs of the whole system. If failed, the fixture must be repaired within 3 days of fault, failing which penalty i.e. two times of the maintenance charges estimated by the department for each fixture for the month shall be deducted & recovered from the agency. (Note- Min. Rs.100/- per job will be held on account of O&M).Here 1 JOB is defined as per point per month | 864 | Job | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
tdhmpratapnagar.pdf
Tender Documents • 0.19 MB
specialtermsandconditions.pdf
Additional Documents • 0.24 MB
BOQ_1017277.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].