Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.4 LAccepted-Finance | ₹9.4 L | 1 | Accepted-Finance responsive |
| 2 | 2₹9.9 LAccepted-Finance | ₹9.9 L | 2 | Accepted-Finance responsive |
Tender Value
₹10.0 L
EMD Value
₹19,990
Closing Date
20 Jul 2026, 12:00 pmClosed
Secretary UIT ABU
uit abu
plantation at talhati to amthala road side
2026_UITAB_574322_1
09/2026-2027
Open Tender
Civil Works
Percentage
UIT ABU Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Secretary, UIT Abu
₹19,990
Yes
4 Aug 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Digging pits in ordinary soil and refilling the same with the excavated earth mixed with manure in the ratio of 2:1 by volume ( 2parts of stacked volume of earth after reduction by 20% 1 part of stacked volume of manure after reduction by 8%) flooding | 4,000 | each | 24 | ₹96,000 |
| 2 | Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc. Good soil of earth | 108 | Cum | 240 | ₹25,920 |
| 3 | Supply of dry manure including loading unloading,transportation & stacking at site. Goat dungmanure. | 10.8 | Cum | 1,200 | ₹12,960 |
| 4 | Different varieties of Shady plants Height 5’-6’ (14”x14”) Many Branches | 4,000 | each | 125 | ₹5,00,000 |
| 5 | Planting of trees /shrubs/ hedge and climbers plants at desired distance in row and watering | 40 | 100 Plants | 30 | ₹1,200 |
| 6 | Spreading of manure , good earth in required thickness (cost of manure and good earth to be separately ) | 200 | Cum | 24 | ₹4,800 |
| 7 | Maintenance of plants by the contractor including of pits/bids watering preparation of Thavala Hoeing weeding etc. & application of insecticides etc. & security if the plant die during maintenance contractor has to replace same height plant at his own cost. | 19,920 | P.Plant P.Month | 18 | ₹3,58,560 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
TECH.pdf
Tender Documents • 4.98 MB
BOQ_1021622.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].