| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.6 LAccepted-AOC | ₹48.6 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹49.0 L+₹35,535.76 (0.73%)Rejected-Finance | ₹49.0 L+₹35,535.76 (0.73%) | L2 | Rejected-Finance High Quoted amount Above L1 |
| 3 | L3₹49.7 L+₹1.1 L (2.20%)Rejected-Finance | ₹49.7 L+₹1.1 L (2.20%) | L3 | Rejected-Finance High Quoted amount Above L1 |
| Sl No | Description | Qty | Unit | S CHANDRAN L3 | M SANKAR L2 | IVR & CO L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 194 | m3 | 110 ₹21,340 Lowest | 151 ₹29,294 | 130 ₹25,220 |
| 2.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 33 | m3 | 5,700 ₹1,88,100 | 5,560 ₹1,83,480 | 5,500 ₹1,81,500 Lowest |
| 3.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 705 | m2 | 445 ₹3,13,725 Lowest | 493 ₹3,47,565 | 450 ₹3,17,250 |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 87 | m3 | 6,940 ₹6,03,780 | 6,773 ₹5,89,251 | 6,500 ₹5,65,500 Lowest |
| 5.00 | Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed sand (M-Sand) and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 149 | m2 | 170 ₹25,330 | 162 ₹24,138 | 160 ₹23,840 Lowest |
| 6.00 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed. | 211 | m2 | 735 ₹1,55,085 | 711 ₹1,50,021 | 700 ₹1,47,700 Lowest |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers | 1,885 | kg | 91 ₹1,71,535 | 86 ₹1,62,110 | 85 ₹1,60,225 Lowest |
| 8.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 282 | m3 | 2,700 ₹7,61,400 Lowest | 2,794 ₹7,87,908 | 2,700 ₹7,61,400 Lowest |
| 9.00 | Supplying and laying Rubberised interlocking Paver block M40 grade Providing and laying of 83mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with sand cushion below the uniform shap of approved non skitting surface in the top and the rate including levelling the base preparation of pavers as sub base, sand cushion 150mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,. | 1,878 | m2 | 1,050 ₹19,71,900 | 1,000 ₹18,78,000 Lowest | 1,000 ₹18,78,000 Lowest |
| 10.00 | Provision for GST 18 % | 1 | No | 7,58,195 ₹7,58,195 | 7,47,318.06 ₹7,47,318.06 Lowest | 8,02,914.3 ₹8,02,914.3 |
Tender Value
₹54.5 L
EMD Value
₹54,500
Closing Date
16 Mar 2026, 3:00 pmClosed
The Commissioner
Municipal Office Paramakudi
Providing and Laying of Paver Block Surface at Weekly Market - MCC apporoach Road and Construction Storm Water Drain in Paramakudi MunicipalityMunicipality
2026_MAWS_673148_10
387/2023/E1
Open Tender
Civil Works - Roads
Works
180 days
Paramakudi Municipality
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹54,500
6 Aug 2026
11 Mar 2026
16 Mar 2026
11 Mar 2026
16 Mar 2026
11 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 194 | m3 | - | - |
| 2 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 33 | m3 | - | - |
| 3 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 705 | m2 | - | - |
| 4 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 87 | m3 | - | - |
| 5 | Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed sand (M-Sand) and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 149 | m2 | - | - |
| 6 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed. | 211 | m2 | - | - |
| 7 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers | 1,885 | kg | - | - |
| 8 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 282 | m3 | - | - |
| 9 | Supplying and laying Rubberised interlocking Paver block M40 grade Providing and laying of 83mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with sand cushion below the uniform shap of approved non skitting surface in the top and the rate including levelling the base preparation of pavers as sub base, sand cushion 150mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,. | 1,878 | m2 | - | - |
| 10 | Provision for GST 18 % | 1 | No | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
MCC_Road_BIDDOC.pdf
Tender Documents • 0.88 MB
BOQ_809069.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .