| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.7 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹7.2 L+₹1.3 L (21.5%)Rejected-AOC 1 338 BX 1ST STREET UTHUKULI ROAD GOLDEN NAGAR CHENGAPPALLI TIRUPPUR 638 812 | TIRUPPUR | TIRUPPUR | TAMIL NADU | 638812 | 2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical 520C MAIN ROAD WARD NO 12 METTU STREET ELAMBALUR PERAMBALUR | PERAMBALUR | PERAMBALUR | TAMIL NADU | 621220 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹7,200
Closing Date
12 Feb 2025, 2:00 pmClosed
SE/CEDC/North/CBE
Office of the Superintending Engineer/CEDC/North/Coimbatore.
Construction of fire protection wall in between PT I and III and II and III in Mettupalayam 11022 KV SS
2025_EB_521474_1
SE/CEDC/N/CBE/C/No.18/2024-25
Open Tender
Civil Construction Goods
Works
270 days
Mettupalayam
As per Specification
2 documents required · 2 mandatory
₹0
₹7,200
Yes
25 Mar 2025
29 Jan 2025
13 Feb 2025
29 Jan 2025
12 Feb 2025
29 Jan 2025
Amount
A) In between Power Transformer I & III Dismantling and removing the existing plain cement concrete including cost of labour charges, lead, lift, etc., complete as per standard specification.
Earth work excavation in hard gravelly soil, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth mixed with small sized boulders etc., complete as per standard specification.
Filling with m.sand for foundation including cost of sand, filling charges, with all leads and lifts, watering, consolidation etc., complete.
Plain cement concrete in CC 1:3:6, using 20mm HBG metal, for foundation including cost of all materials, labour charges including consolidation, curing, all leads, lifts etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for raft foundation including cost all materials, labour, curing, lead, lift, cost of shuttering etc., complete but excluding cost of steel reinforcement.
Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed below ground level including cost of all materials, labour, curing, lead, lift, cost of shuttering etc., complete but excluding cost of steel reinforcement.
Providing steel reinforcement with MS/RTS rods of reputed approved make for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, minor T&Ps labour charges for cutting, straightening bending as per type design drawing, placing aligning and tying properly with all leads and lift etc., complete as per standard specification.
Refilling with excavated earth other than sand with an initial head load of 100m and depositing the earth as directed by the officer in charge, well rammed, watered and consolidation etc., complying with standard specification.
Brick work in CM 1:5 using chamber burnt class II bricks/fly ash bricks, including cost of all materials, labour, scaffolding, curing, all leads and lifts etc., complete.
Plastering in CM 1:5, 12 mm thick including cost of all materials, scaffolding charges, labour charges, lead, lift etc., complete.
Painting two coats with exterior emulsion paint over one coat of white cement of best quality including cost of all materials, scaffolding charges, labour, lead, lift etc., complete.
Disposal of excess of surplus earth away in low lying area with a head load lead 100m and lorry lead of 5 km including spreading, levelling, labour, leads, lifts etc., complete.
B) In between Power Transformer II & III Dismantling and removing the existing plain cement concrete including cost of labour charges, lead, lift, etc., complete as per standard specification.
Earth work excavation in hard gravelly soil, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth mixed with small sized boulders etc., complete as per standard specification.
Filling with m.sand for foundation including cost of sand, filling charges, with all leads and lifts, watering, consolidation etc., complete.
Plain cement concrete in CC 1:3:6, using 20mm HBG metal, for foundation including cost of all materials, labour charges including consolidation, curing, all leads, lifts etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for raft foundation including cost all materials, labour, curing, lead, lift, cost of shuttering etc., complete but excluding cost of steel reinforcement.
Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed including cost of all materials, labour, curing, lead, lift, cost of shuttering etc., complete but excluding cost of steel reinforcement.
Providing steel reinforcement with MS/RTS rods of reputed approved make for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, minor T&Ps labour charges for cutting, straightening bending as per type design drawing, placing aligning and tying properly with all leads and lift etc., complete as per standard specification.
Refilling with excavated earth other than sand with an initial head load of 100m and depositing the earth as directed by the officer in charge, well rammed, watered and consolidation etc., complying with standard specification.
Brick work in CM 1:5 using chamber burnt class II bricks/fly ash bricks, including cost of all materials, labour, scaffolding, curing, all leads and lifts etc., complete.
Plastering in CM 1:5, 12 mm thick including cost of all materials, scaffolding charges, labour charges, lead, lift etc., complete.
Painting two coats with exterior emulsion paint over one coat of white cement of best quality including cost of all materials, scaffolding charges, labour, lead, lift etc., complete.
Disposal of excess of surplus earth away in low lying area with a head load lead 100m and lorry lead of 5 km including spreading, levelling, labour, leads, lifts etc., complete.
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
M/s A.Chelladurai & Co (BID ID -1248035)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .