Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance WARD NO 10 TEHSIL SUNDERBANI DISTT RAJOURI 185153 | SUNDERBANI | RAJOURI | JAMMU AND KASHMIR | 185153 | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹18.3 L (11.4%)Admitted-Finance | ₹1.8 Cr+₹18.3 L (11.4%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 Cr+₹27.5 L (17.1%)Admitted-Finance 94 PHASE II HOUSEING COLONY UDHAMPUR J K | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹1.9 Cr+₹27.5 L (17.1%) | L3 | Admitted-Finance |
| 4 | L4₹1.9 Cr+₹33.5 L (20.8%)Admitted-Finance | ₹1.9 Cr+₹33.5 L (20.8%) | L4 | Admitted-Finance |
| 5 | L5₹2.0 Cr+₹36.2 L (22.5%)Admitted-Finance | ₹2.0 Cr+₹36.2 L (22.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHIVAE CONSTRUCTION L3 | ALCO Engineers Private Limited L4 | Bodh Raj Sharma L1 | ARUN ANAND L5 | bamral builder L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Sch 'A' Part-I (Building Work):-This Schedule is not Pre-Priced by MES and the Pre-Priced rate indicated as "Rs. 0.00" under col.5 signifies this fact only. | ||||||||
| 1.01 | Construction of block Guard Room with bedroom, living room, rest room with bath, toilet, dressing, verandah alongwith guard post at first floor complete all as specified and shown on drawing. | 2 | Each Block | 45,00,000 ₹90,00,000 | 42,50,002 ₹85,00,004 | 21,00,000 ₹42,00,000 Lowest | 35,00,000 ₹70,00,000 | 40,00,000 ₹80,00,000 |
| 2.00 | Total Amount of Sch 'A' Part - II (Internal Electric Supply) | 1 | Lump sum | 2,41,315 ₹2,41,315 Lowest | 3,37,000 ₹3,37,000 | 3,34,000 ₹3,34,000 | 3,50,000 ₹3,50,000 | 3,21,000 ₹3,21,000 |
| 3.00 | Total Amount of Sch 'A' Part - III (Internal Water Supply) | 1 | Lump sum | 96,916 ₹96,916 | 50,000 ₹50,000 Lowest | 51,000 ₹51,000 | 85,000 ₹85,000 | 50,000 ₹50,000 Lowest |
| 4.00 | Total Amount of Sch 'A' Part - IV (Plumbing Work) | 1 | Lump sum | 1,08,387 ₹1,08,387 | 60,000 ₹60,000 Lowest | 61,000 ₹61,000 | 90,000 ₹90,000 | 60,000 ₹60,000 Lowest |
| 5.00 | Total Amount of Sch 'A' Part - V (Hot Water Supply) | 1 | Lump sum | 40,118 ₹40,118 | 40,000 ₹40,000 | 36,000 ₹36,000 Lowest | 45,000 ₹45,000 | 40,000 ₹40,000 |
| 6.00 | Total Amount of Sch 'A' Part -VI (External Water Supply) | 1 | Lump sum | 2,48,050 ₹2,48,050 | 2,20,000 ₹2,20,000 Lowest | 2,25,000 ₹2,25,000 | 3,45,000 ₹3,45,000 | 2,21,000 ₹2,21,000 |
| 7.00 | Total Amount of Sch 'A' Part -VII (External Electric Supply) | 1 | Lump sum | 2,60,580 ₹2,60,580 | 2,00,000 ₹2,00,000 Lowest | 2,10,000 ₹2,10,000 | 3,20,000 ₹3,20,000 | 2,00,000 ₹2,00,000 Lowest |
| 8.00 | Total Amount of Sch 'A' Part -VIII (SEWAGE DISPOSAL) | 1 | Lump sum | 74,061 ₹74,061 | 50,000 ₹50,000 | 49,000 ₹49,000 Lowest | 65,000 ₹65,000 | 51,000 ₹51,000 |
| 9.00 | Total Amount of Sch 'A' Part -IX (Security Wall) | 1 | Lump sum | 67,19,190 ₹67,19,190 Lowest | 81,00,000 ₹81,00,000 | 90,00,000 ₹90,00,000 | 93,00,000 ₹93,00,000 | 69,00,000 ₹69,00,000 |
Tender Value
₹1.8 Cr
EMD Value
₹2.6 L
Closing Date
24 Aug 2026, 6:00 pmClosed
CWE NAGROTA
HQ CWE NAGROTA PIN-181221
PROVISION OF RETAINING WALL AND SECURITY WALL ALONGWITH ELEVATED GUARD POST AND GUARD ROOM UNDER GE NAGROTA
2026_MES_775691_1
CWE/NGT-46/2026-27
Open Tender
Civil Works
Lump-sum
450 days
GE (P) NAGROTA
As per NIT
8 documents required · 8 mandatory
₹1,000
GE (P) Nagrota
₹2.6 L
Yes
3 Sept 2026
1 Jul 2026
31 Aug 2026
1 Jul 2026
24 Aug 2026
10 Aug 2026
1 Jul 2026 - 16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sch 'A' Part-I (Building Work):-This Schedule is not Pre-Priced by MES and the Pre-Priced rate indicated as "Rs. 0.00" under col.5 signifies this fact only. | |||||
| 1.01 | Construction of block Guard Room with bedroom, living room, rest room with bath, toilet, dressing, verandah alongwith guard post at first floor complete all as specified and shown on drawing. | 2 | Each Block | - | - |
| 2 | Total Amount of Sch 'A' Part - II (Internal Electric Supply) | 1 | Lump sum | 3,71,255.12 | ₹3,71,255.12 |
| 3 | Total Amount of Sch 'A' Part - III (Internal Water Supply) | 1 | Lump sum | 57,009.6 | ₹57,009.6 |
| 4 | Total Amount of Sch 'A' Part - IV (Plumbing Work) | 1 | Lump sum | 67,741.96 | ₹67,741.96 |
| 5 | Total Amount of Sch 'A' Part - V (Hot Water Supply) | 1 | Lump sum | 40,118.16 | ₹40,118.16 |
| 6 | Total Amount of Sch 'A' Part -VII (External Water Supply) | 1 | Lump sum | 2,48,050.65 | ₹2,48,050.65 |
| 7 | Total Amount of Sch 'A' Part -VIII (External Electric Supply) | 1 | Lump sum | 2,32,661.5 | ₹2,32,661.5 |
| 8 | Total Amount of Sch 'A' Part -IX (SEWAGE DISPOSAL) | 1 | Lump sum | 55,685.16 | ₹55,685.16 |
| 9 | Total Amount of Sch 'A' Part -X (Security Wall) | 1 | Lump sum | 93,37,453.62 | ₹93,37,453.62 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.19 MB
DRAWINGS.pdf
Additional Documents • 1.12 MB
BOQ_868615.xls
BOQ • 0.32 MB
TENDER46.pdf
Tender Documents • 1.86 MB
CORRIGENDUM46.pdf
PDF • 1.10 MB
CORRDATE46.pdf
PDF • 0.22 MB
REVISEDTENDER.pdf
PDF • 4.67 MB
datecorrigendum.pdf
PDF • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .