| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAccepted-AOC 58 13 NORACHIVALASU PALLIPATTY POST METTUR TALUK SALEM 636 458 | SALEM | SALEM | TAMIL NADU | 636458 | ₹23.5 L Quoted ₹19.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹20.6 LRejected-AOC | ₹20.6 L | L2 | Rejected-AOC L2 |
| 3 | L3₹20.6 LRejected-AOC ERIKKADU THERMAL POST METTUR DAM 636 406 | METTUR DAM | SALEM | TAMIL NADU | 636406 | ₹20.6 L | L3 | Rejected-AOC L3 |
| 4 | L4₹21.6 LRejected-AOC 002 1 NATHAKADU SRI MAHALAKSHMI DYEING PRINTING MILLS CAMPUS BHAVANI MAIN ROAD ERODE 638004 | ERODE | ERODE | TAMIL NADU | 638004 | ₹21.6 L | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | NVS and Co L3 | vetrivel constructions L2 | A.Kalidasan L1 | Vidhyut Nirman Corporation L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay. Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, as per standard specification, etc., complete. | 30 | m3 | 140 ₹4,200 | 200 ₹6,000 | 118 ₹3,540 Lowest | 150 ₹4,500 |
| 2.00 | Earth work excavating and depositing on bank with initial lead of 10m and initial llift of 2.0m in soft disintegrated rock, laterite, soft rock (or) kankar not requiring blasting, as per standard specification, etc., complete. | 15 | m3 | 180 ₹2,700 | 300 ₹4,500 | 175 ₹2,625 | 150 ₹2,250 Lowest |
| 3.00 | Earth work excavating and depositing on Bank with initial lead of 10m and initial lift of 2m in medium rock and dense medium rock not requiring blasting, as per standard specification, etc., complete. | 15 | m3 | 220 ₹3,300 | 550 ₹8,250 | 308 ₹4,620 | 150 ₹2,250 Lowest |
| 4.00 | Supplying and filling M sand (Approved quarry) well watered and consolidated in foundation and basement in layers complying with standard specification, including cost of all materials, all labour charges, lead, lift, T&Ps etc., complete as directed by the Engineer in charge. | 23 | m3 | 1,800 ₹41,400 | 1,700 ₹39,100 | 1,592 ₹36,616 | 750 ₹17,250 Lowest |
| 5.00 | Providing Plain Cement Concrete in 1:3:6, using OPC 53 grade cement (DALMIA/ ULTRATECH/RAMCO) ,M sand , 40mm HBG metal- (Approved quarry) including cost of cement, all materials, labour charges, curing, all leads, lifts, as per standard specification etc., complete as directed by the Engineer in charge. | 23 | m3 | 4,800 ₹1,10,400 | 4,500 ₹1,03,500 Lowest | 5,138 ₹1,18,174 | 5,500 ₹1,26,500 |
| 6.00 | Providing Reinforced cement concrete (RCC) 1:1.5:3 using OPC 53 grade cement (DALMIA/ULTRATECH/ RAMCO) ,M sand , 12 to 20mm (machine crushed) metal (Approved quarry) for matt foundation including cost of all materials, water charges, shuttering charges, labour lead, lift, etc., complete as directed by the Engineer in charge. (But excluding cost of steel reinforcement.) | 0.5 | m3 | 9,500 ₹4,750 | 12,000 ₹6,000 | 8,090 ₹4,045 Lowest | 8,500 ₹4,250 |
| 7.00 | Providing R.R.Masonry in C.M 1:5 for foundation including cost of all materials leads lifts labour charges etc complete. | 35 | m3 | 5,200 ₹1,82,000 | 4,500 ₹1,57,500 Lowest | 5,174 ₹1,81,090 | 6,000 ₹2,10,000 |
| 8.00 | Providing Reinforced cement concrete (RCC) 1:1.5:3 using OPC 53 grade cement (DALMIA/ULTRATECH/ RAMCO) ,M sand , 12 to 20mm (machine crushed) metal (Approved quarry) for plinth and grade beam including cost of all materials, water charges, shuttering charges, labour lead, lift, etc., complete as directed by the Engineer in charge. (But excluding cost of steel reinforcement.) | 5 | m3 | 9,500 ₹47,500 Lowest | 12,000 ₹60,000 | 11,002 ₹55,010 | 13,000 ₹65,000 |
| 9.00 | Refilling the foundation and basement with excavated earth other sand with all leads and lifts, watering, consolidation etc., complete as per standard specification and as per direction of the Engineer incharge. | 24 | m3 | 65 ₹1,560 | 100 ₹2,400 | 37 ₹888 Lowest | 45 ₹1,080 |
| 10.00 | Providing Anti termite pre construction treatment using emulsifiable concentrate of required percentage as suggested by the manufacture and specification as per 6313 part II - 1971 around Excavated Area, Plinth, Foundation and Basement in four stages as directed by the Engineer at Site including cost of all materials, lead,lift etc., complete. | 76 | m2 | 160 ₹12,160 | 150 ₹11,400 | 77 ₹5,852 | 10 ₹760 Lowest |
Tender Value
₹26.4 L
EMD Value
₹22,200
Closing Date
17 Mar 2026, 12:00 pmClosed
SE/GEDC/GOBI
Office of the Superintending Engineer Gobi Electricity Distribution Circle, Gobi 110/11 KVSS Premises, Vettaikarankoil, Nagadevampalayam (Po), Gobichettipalayam-638 476
Construction of AE room and staff room for South Anthiyur Section.
2026_EB_669355_1
ET NO 09 DT 24.02.2026
Open Tender
Civil Works - Buildings
Works
180 days
SE/GEDC/GOBI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹22,200
11 Aug 2026
2 Mar 2026
18 Mar 2026
2 Mar 2026
17 Mar 2026
2 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay. Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, as per standard specification, etc., complete. | 30 | m3 | - | - | 18% |
| 2 | Earth work excavating and depositing on bank with initial lead of 10m and initial llift of 2.0m in soft disintegrated rock, laterite, soft rock (or) kankar not requiring blasting, as per standard specification, etc., complete. | 15 | m3 | - | - | 18% |
| 3 | Earth work excavating and depositing on Bank with initial lead of 10m and initial lift of 2m in medium rock and dense medium rock not requiring blasting, as per standard specification, etc., complete. | 15 | m3 | - | - | 18% |
| 4 | Supplying and filling M sand (Approved quarry) well watered and consolidated in foundation and basement in layers complying with standard specification, including cost of all materials, all labour charges, lead, lift, T&Ps etc., complete as directed by the Engineer in charge. | 23 | m3 | - | - | 18% |
| 5 | Providing Plain Cement Concrete in 1:3:6, using OPC 53 grade cement (DALMIA/ ULTRATECH/RAMCO) ,M sand , 40mm HBG metal- (Approved quarry) including cost of cement, all materials, labour charges, curing, all leads, lifts, as per standard specification etc., complete as directed by the Engineer in charge. | 23 | m3 | - | - | 18% |
| 6 | Providing Reinforced cement concrete (RCC) 1:1.5:3 using OPC 53 grade cement (DALMIA/ULTRATECH/ RAMCO) ,M sand , 12 to 20mm (machine crushed) metal (Approved quarry) for matt foundation including cost of all materials, water charges, shuttering charges, labour lead, lift, etc., complete as directed by the Engineer in charge. (But excluding cost of steel reinforcement.) | 0.5 | m3 | - | - | 18% |
| 7 | Providing R.R.Masonry in C.M 1:5 for foundation including cost of all materials leads lifts labour charges etc complete. | 35 | m3 | - | - | 18% |
| 8 | Providing Reinforced cement concrete (RCC) 1:1.5:3 using OPC 53 grade cement (DALMIA/ULTRATECH/ RAMCO) ,M sand , 12 to 20mm (machine crushed) metal (Approved quarry) for plinth and grade beam including cost of all materials, water charges, shuttering charges, labour lead, lift, etc., complete as directed by the Engineer in charge. (But excluding cost of steel reinforcement.) | 5 | m3 | - | - | 18% |
| 9 | Refilling the foundation and basement with excavated earth other sand with all leads and lifts, watering, consolidation etc., complete as per standard specification and as per direction of the Engineer incharge. | 24 | m3 | - | - | 18% |
| 10 | Providing Anti termite pre construction treatment using emulsifiable concentrate of required percentage as suggested by the manufacture and specification as per 6313 part II - 1971 around Excavated Area, Plinth, Foundation and Basement in four stages as directed by the Engineer at Site including cost of all materials, lead,lift etc., complete. | 76 | m2 | - | - | 18% |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_804280.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].