Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹24.2 L+₹1,215.24 (0.05%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹24.2 L+₹8,506.65 (0.35%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹24.3 L+₹13,124.54 (0.54%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | Rejected-Technical | - | Rejected-Technical Dis qualify |
Tender Value
Refer Docs
EMD Value
₹48,160
Closing Date
27 Jun 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Ward number 42 Saddam ke Makan se Khurshid ke Makan Tak Shishi sadak AVN nali Nirman
2026_DOLBU_1161092_1
FFC Ward 42 sn 43
Open Tender
Civil Works
Percentage
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
Nagar Nigam Gorakhpur
₹48,160
1 Oct 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
27 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). SI No.692 | 45.72 | Cum | 400 | ₹18,288 |
| 1.02 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet). SI No.694 | 7.2 | Cum | 850 | ₹6,120 |
| 1.03 | Earth work in excavation in foul position soil lead 50mt.& lift 1.5 mt. incl. lab. T&P etc all complete. | 126 | Cum | 120 | ₹15,120 |
| 1.04 | P/L of base concrete in 1:6:12 with cement, L-Sand and 40mm S/B including mat. Lab. T&P,etc all complete. | 33.6 | Cum | 4,007 | ₹1,34,635.2 |
| 1.05 | M 150 class brick work in 1:4 with cement &approved Course Sand mortar including supply all material and S.I.N. labor etc. SIN 305A | 103.15 | Cum | 5,817 | ₹6,00,023.55 |
| 1.06 | 12mm thick cement plaster in 1:4 cement mortor with 1 cement and 4 course sand including etc. all complete of work. | 448 | Sqm | 159 | ₹71,232 |
| 1.07 | Laying CC In 1:2:4 for top of drain with cement, Course Sand Stone Grit Including supply of all material and Labour etc. | 7.73 | Cum | 8,186 | ₹63,277.78 |
| 1.08 | S/L of GSB 53-9.5mm thick S/B upto 10 cm loose layer including etc all complete of work. | 106 | Cum | 3,134.25 | ₹3,32,230.5 |
| 1.09 | Consolidation of GSB upto 10 cm loose layer including etc all complete of work. | 106 | Cum | 210 | ₹22,260 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
BOQ_2176178.xls
BOQ • 0.32 MB
d.pdf
Tender Documents • 2.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .