Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 CrAccepted-AOC SANKARPUR ROAD BIRUBARI GUWAHATI DIST KAMRUP M ASSAM 781016 | KAMRUP METRO | ASSAM | 781016 | ₹4.5 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹4.5 Cr+₹21,176.06 (0.05%)Rejected-Finance PANJABARI BOTAHGHULI GUWAHATI 37 DIST KAMRUP M ASSAM | MARIGAON | ASSAM | 782413 | ₹4.5 Cr+₹21,176.06 (0.05%) | L2 | Rejected-Finance Not admitted |
| 3 | L3₹4.5 Cr+₹21,714.22 (0.05%)Rejected-Finance C O SRI HANUMAN PRASAD BAJAJ WARD NO 02 U T ROAD P O DIST UDALGURI BTC ASSAM | UDALGURI | ASSAM | 784113 | ₹4.5 Cr+₹21,714.22 (0.05%) | L3 | Rejected-Finance Not admitted |
| Sl No | Description | Qty | Unit | ASHOK KUMAR BAJAJ L3 | ABDUL HAMID CHOUDHURY L2 | SUMIT CHACHAN L1 |
|---|---|---|---|---|---|---|
| 1.00Improvement of Canal D-2 Ch-18210 to 18415 by CC Linning Under SOPD for the year 2025-26. | ||||||
| 1.01 | Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to afe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).
(A) For normal lead of 30 M and lift of 1.50 M CuM
(i) In all types of soils (except soil mixed with gravel and boulders) | 500.81 | cum | 358 ₹1,79,291.41 Lowest | 358 ₹1,79,291.41 Lowest | 358 ₹1,79,291.41 Lowest |
| 1.02 | River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc, complete as directed as specified. | 134.63 | cum | 2,232 ₹3,00,494.16 Lowest | 2,500 ₹3,36,575 | 2,232 ₹3,00,494.16 Lowest |
| 1.03 | CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately) | 366.19 | cum | 9,732 ₹35,63,761.08 | 9,632 ₹35,27,142.08 Lowest | 9,632 ₹35,27,142.08 Lowest |
| 1.04 | Centering and shuttering including propping etcc. Where necessary and removal of forms after completion of CC and RCC works complete as directed (Measurement to be taken on the face area timbered) (B). I Shuttering of Beam without prop | 679.18 | sqm | 223 ₹1,51,457.14 Lowest | 223 ₹1,51,457.14 Lowest | 223 ₹1,51,457.14 Lowest |
| 1.05 | Providing bitumen of appropriate grade in the construction joint of CC lining as per drawing complete as directed. | 341.88 | Rm | 171 ₹58,461.48 Lowest | 171 ₹58,461.48 Lowest | 171 ₹58,461.48 Lowest |
| 1.06 | Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, ramming, watering, watering, dressing dressing and roughening roughening the seat of mbankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead pto 30 M and lift upto 1.5 M, complete as directed. (A) With ordinary Soil | 344.42 | cum | 498 ₹1,71,521.16 Lowest | 498 ₹1,71,521.16 Lowest | 498 ₹1,71,521.16 Lowest |
| 2.00Renovation of canal Embankment by Earth work from Ch. 20800.00 m to Ch. 20950.00 m and 22600.00 m to 22720. m at canal D2 and CC l;ining from Ch 20430.0 m to Ch 20505 | ||||||
| 2.01 | Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, ramming, watering, watering, dressing dressing and roughening roughening the seat of mbankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead pto 30 M and lift upto 1.5 M, complete as directed. (A) With ordinary Soil | 1,532.52 | cum | 498 ₹7,63,194.96 Lowest | 498 ₹7,63,194.96 Lowest | 498 ₹7,63,194.96 Lowest |
| 3.00CC Lining at Canal D-2 U/s Ch. 20435 m to 20460 m, D/s Ch 20475 m to 20501 m under SOPD for the year 2025-26 | ||||||
Tender Value
₹4.5 Cr
EMD Value
₹8.9 L
Closing Date
3 Oct 2025, 1:00 pmClosed
Chief Engineer Irrigation Assam
o-o the Chief Engineer Irrigation Assam Chandmari Guwahati-03
Improvement and Renovation of Jamuna FIS under SOPD-G for the year 2025-26 under Hojai Lumding-Binnakandi Division (Irrigation) Hojai Package_1
2025_ID_47361_1
1 (SOPD-G) 2025-26 Date_07.09.2025
Open Tender
Civil Works
Item Rate
180 days
Hojai
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,000
₹8.9 L
Yes
o-o the Chief Engineer Irrigation Assam Chandmari
26 Nov 2025
8 Sept 2025
4 Oct 2025
9 Sept 2025
3 Oct 2025
16 Sept 2025
15 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_75605.xls
BOQ • 0.40 MB
BiddocumentJamuna.pdf
Tender Documents • 0.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .