| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.7 L
EMD Value
₹4,800
Closing Date
2 Jun 2026, 6:00 pmClosed
Executive Engineering UPSIC KANPUR
Executive Engineering UPSIC KANPUR
CONSTRUCTION OF SAMSHAN STHAL AT GOPALPUR GRAM PANCHAYAT SARSAI HELU BLOCK BASREHAR DISTT. ETAWAH
2026_MSME_1153261_1
146/EE5/26-27
Open Tender
Civil Works
Percentage
90 days
ETAWAH
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineering UPSIC KANPUR
₹4,800
3 Jun 2026
25 May 2026
3 Jun 2026
25 May 2026
2 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 mt. And lead upto 30 mt. And including filling watering and ramming of excavated earth into the trenches or into the space between the byilding and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer Incharge upto a distance of 30 m from the foundation trenches.4.1.1 | 20.21 | cum | 145 | ₹2,930.45 |
| 2 | Concrete with 4 cms guage stone ballast, coarse sand and cement in proportion of 8:4:1 in foundation and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of work.4.1.8 | 1 | cum | 5,565 | ₹5,559.44 |
| 3 | R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 :3 in foundation excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completed of the work. The rate excludes making of drip course which shall be paid extra.5.1.2 | - | cum | 7,400 | - |
| 4 | R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 :3 in coloumn excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completed of the work. The rate excludes making of drip course which shall be paid extra.5.2.2 | 2.43 | cum | 8,800 | ₹21,384 |
| 5 | R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 : 3 in lighter beam excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completion of the work. The rate excludes making of drip course which shall be paid extra.5.1.2 | 4.19 | cum | 8,400 | ₹35,196 |
| 6 | R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 : 3 in Slab excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completion of the work. The rate excludes making of drip course which shall be paid extra.5.3 | 6.85 | cum | 8,300 | ₹56,888.2 |
| 7 | Mild steel or iron in plain work such as reinforced cement concrete work wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping and hooks.( Analysis ) | 1,883.09 | kg | 78.42 | ₹1,47,671.92 |
| 8 | 15mm thick cement Plaster of 1 part cement 4 parts approved fine sand as ordered by the Engineer Incharge in the proportion including supply of all materials, labour & Tools and plants etc. required for proper completion of work and including proper curing.13.4.1 | 46.43 | sqm | 210 | ₹9,750.3 |
| 9 | 40mm thick cement concrete flooring 1:2:4 with 20mm stone agg. Laid in one layer finished with floating coat of neat cement. | 26.32 | sqm | 500 | ₹13,160 |
| 10 | Construction of plateform for burn of dead body. | 2.19 | cum | 48,035 | ₹1,05,196.65 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_2160429.xls
BOQ • 0.27 MB
TermsandConditionTenderCivilWorks.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .