Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAccepted-AOC | ₹4.7 Cr Quoted ₹4.9 Cr | L1 | Accepted-AOC Quoted Less Percentage |
| 2 | L2₹5.2 Cr+₹26.8 L (5.47%)Rejected-AOC | ₹5.2 Cr+₹26.8 L (5.47%) | L2 | Rejected-AOC Quoted Above Percentage |
| 3 | L3₹5.2 Cr+₹29.6 L (6.04%)Rejected-AOC | ₹5.2 Cr+₹29.6 L (6.04%) | L3 | Rejected-AOC Quoted Above Percentage |
Tender Value
₹4.7 Cr
EMD Value
₹2.5 L
Closing Date
18 Nov 2022, 3:00 pmClosed
SE H C and M Salem
O/o the Superintending Engineer (Highways), Construction and Maintenance Circle, Salem
Widening and Strengthening to Government Roads including Reconstruction of Box Culvert and Construction of Well Protective Wall in Attur (H) (CandM) Sub Division (SLM-19)
2022_HWAY_256872_1
4 /2022-2023 / HDO, Dated. 07.10.2022-1
Open Tender
Civil Works - Roads
Percentage
210 days
Salem
Refer Tender Document
3 documents required · 3 mandatory
₹0
₹2.5 L
30 Jan 2023
17 Oct 2022
21 Nov 2022
17 Oct 2022
18 Nov 2022
21 Oct 2022
18 Oct 2022 - 20 Oct 2022
eProcurement System Government of Tamil Nadu Created By: R Bhavani Created Date/Time: 28-Dec-2022 03:15 PM Tender Title: Attur (H) CandM Sub Division (SLM-19) Tender ID: 2022_HWAY_256872_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Salem Circle
Name of work : Widening and Strengthening to Government Roads including Reconstruction of Box Culvert and Construction of Well Protective Wall in Attur (H) (C&M) Sub Division (SLM-19) The Following works are involved 1.Widening from Intermediate Lane to Two Lane and Strengthening in Km.10/8-13/0 of Kattukottai - Sadasivapuram Thidavorr Road including Reconstruction of Box culvert at Km.10/10, 12/6 and Construction of Well Protective wall at Km.11/4, 12/2, 12/4 (M841) (01-CRIDP-22-23-M-0544) 2. Widening from Intermediate Lane to Two Lane and Strengthening in Km.5/0-7/4 of Kattukottai - Sadasivapuram Thidavorr Road (M841) (01-CRIDP-22-23-M-0546)
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 VMI Constructions(GSTN-33AAGFV4463L1ZU) 39795028.180 4.300 48977333.000 Four Crore Eighty Nine Lakh Seventy Seven Thousand Three Hundred and Thirty Three
2.00 SSUNDARARAJ(GSTN-33AVAPS9683E1ZA) 39795028.180 10.600 51935695.000 Five Crore Ninteen Lakh Thirty Five Thousand Six Hundred and Ninty Five
3.00 R.Vasu(GSTN-NA) 39795028.180 10.000 51653947.000 Five Crore Sixteen Lakh Fifty Three Thousand Nine Hundred and Fourty Seven
Lowest Amount Quoted BY: VMI Constructions(48977333.000)
BOQ Summary Details Tender Title: Attur (H) CandM Sub Division (SLM-19) Tender ID: 2022_HWAY_256872_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 VMI Constructions 48977333.000 L1
3 SSUNDARARAJ 51935695.000 L3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .