Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹2.0 Cr−₹16.2 L (7.60%)Accepted-AOC | ₹2.0 Cr−₹16.2 L (7.60%) | L2 | Accepted-AOC Award of Contract the RAJESH KUMAR MIDDHA GOVT CONT ABH by the committee for the Lower Bidder than others |
| 2 | L1₹2.1 CrRejected-Finance ABOHAR | ₹2.1 Cr | L1 | Rejected-Finance Lowest tender rates other than |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
8 Jan 2025, 5:00 pmClosed
Executive Engineer, Abohar Canal and Ground Water
Executive Engineer, Abohar Canal and Ground Water Division Water Resources, Abohar
Reconstruction of Watercourses of Outlet RD 56900-L , 58020-L of Panjawa Disty, Outlet 9845-L Jandwala Minor, Outlet RD 28350-L, RD 44270-L, RD 49683-L , RD 72790-L of Daulatpur Minor
2024_WR_129934_17
E-Tendering Notice No.17/Abohar Canal Ground Water Division /2024-25 Dated 14/11/2024
Open Tender
Civil Works - Others
Item Rate
FAZILKA
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
Yes
₹4.0 L
Yes
Executive Engineer, Abohar Canal and Ground Water
20 Jan 2025
3 Jan 2025
8 Jan 2025
3 Jan 2025
8 Jan 2025
3 Jan 2025
7 Jan 2025
1.1 - Reconstruction of water course of outlet At RD 58020-L of Panjawa Disty
CHAPTER NO. 6 Earthwork 6.2 Earthwork Excavation in ordinary soil, exclusive of compe nsation of earth:- (a) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods.
CHAPTER NO. 6 Earthwork 6.2 (b) Earth work undressed with a combined lead upto 15 metres including breaking of clods.
CHAPTER NO. 6 Earthwork 6.3 Dressing of earthwork (i) New work or remodeling work.
CHAPTER NO. 6 Earthwork Filling 6.8 (b(i))Earth work filling in 0.152 meter layers in foundation including ramming, watering and consolidation under bed
CHAPTER NO. 6.18 Dag belling single kassi stroke minimum 7.5 cm depth
CHAPTER NO. 8 Dismantling (8.5 b) Dismantling brick work tile masonry or tile lining In cement
CHAPTER No. 11 Brickwork (11.3 (i) )First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth
CHAPTER NO. 15 Plastering & Pointing (15.6) 10mm thick Cement Plaster 1:4
CHAPTER NO. 15 Plastering & Pointing (15.38) 10mm thick cement plaster 1 : 4 on floors.
CHAPTER NO. 19 Lining (19.1) Dressing bed and preparation of sub grade for lining.
CHAPTER NO. 10 Concrete (10.29) Providing & laying dry brick bats
CHAPTER NO. 10 Concrete (10.8) Cement concrete 1:6:12 mixing with brick ballast 40mm gauge by manual means
Supplying of RCC shutter with one extra frame for nakka and branch offtakes
Fixing of Shutter and frames for Nakka and branch offtakes
Rehandling of earthwork recently executed
CHAPTER NO. 20.13 Providing,lowering precast concrete NP-2 plain end pipes and colla with reinforcement,in trenches to correct gradient and alignment,cutting of reinforcement cement concrete plain end pipes,stringing in trenches,jointing ends and fixing collar with cement mortar 1:2 as per IS 458:2003 into trenches for all depths and laying out same to correct alignment ,gradients,levels etc complete in all respect 700 mm i/d pipe
CHAPTER NO. 10.30 Supplying and laying dry brick ballast
1.2 - Reconstruction of water course of outlet At RD 9845-L of Jandwala minor
CHAPTER NO. 6 Earthwork 6.2 Earthwork Excavation in ordinary soil, exclusive of compe nsation of earth:- (a) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods.
CHAPTER NO. 6 Earthwork 6.2 (b) Earth work undressed with a combined lead upto 15 metres including breaking of clods.
CHAPTER NO. 6 Earthwork 6.3 Dressing of earthwork (i) New work or remodeling work.
Earth work (exclusive of compensation for earth) in excavation in ordinary soil or soil containing gravel or kankar upto 40% and filling in 15 cm layers in foundation and plinth including ramming watering and consolidating under floors with earth brought from a distance not exceeding 30 metres
Rehandling of earthwork recently executed
CHAPTER NO. 6.18 Dag belling single kassi stroke minimum 7.5 cm depth
CHAPTER NO. 8 Dismantling (8.5 b) Dismantling brick work tile masonry or tile lining In cement
CHAPTER No. 11 Brickwork (11.3 (i) )First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth
CHAPTER NO. 15 Plastering & Pointing (15.6) 10mm thick Cement Plaster 1:4
CHAPTER NO. 15 Plastering & Pointing (15.38) 10mm thick cement plaster 1 : 4 on floors.
CHAPTER NO. 19 Lining (19.1) Dressing bed and preparation of sub grade for lining.
CHAPTER NO. 10 Concrete (10.29) Providing & laying dry brick bats
CHAPTER NO. 10.30 Supplying and laying dry brick ballast
CHAPTER NO. 10 Concrete (10.8) Cement concrete 1:6:12 mixing with brick ballast 40mm gauge by manual means
Supplying of RCC shutter with one extra frame for Nakka and branch offtakes
Fixing of shutter and frames for Nakka and Branch offtakes
CHAPTER NO. 20.13 Providing,lowering precast concrete NP-2 plain end pipes and colla with reinforcement,in trenches to correct gradient and alignment,cutting of reinforcement cement concrete plain end pipes,stringing in trenches,jointing ends and fixing collar with cement mortar 1:2 as per IS 458:2003 into trenches for all depths and laying out same to correct alignment ,gradients,levels etc complete in all respect 700 mm i/d pipe
1.3 - Reconstruction of water course of outlet at RD 28350-L of Daulatpur minor
CHAPTER NO. 6 Earthwork 6.2 Earthwork Excavation in ordinary soil, exclusive of compe nsation of earth:- (a) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods.
CHAPTER NO. 6 Earthwork 6.2 (b) Earth work undressed with a combined lead upto 15 metres including breaking of clods.
CHAPTER NO. 6 Earthwork 6.3 Dressing of earthwork (i) New work or remodeling work.
CHAPTER NO. 6 Earthwork Filling 6.8 (b(i))Earth work filling in 0.152 meter layers in foundation including ramming, watering and consolidation under bed
Rehandling of earthwork recently executed
CHAPTER NO. 6.18 Dag belling single kassi stroke minimum 7.5 cm depth
CHAPTER NO. 8 Dismantling (8.5 b) Dismantling brick work tile masonry or tile lining In cement
CHAPTER No. 11 Brickwork (11.3 (i) )First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth
CHAPTER NO. 15 Plastering & Pointing (15.6) 10mm thick Cement Plaster 1:4
CHAPTER NO. 15 Plastering & Pointing (15.38) 10mm thick cement plaster 1 : 4 on floors.
CHAPTER NO. 19 Lining (19.1) Dressing bed and preparation of sub grade for lining.
CHAPTER NO. 10 Concrete (10.29) Providing & laying dry brick bats
CHAPTER NO. 10.30 Supplying and laying dry brick ballast
CHAPTER NO. 10 Concrete (10.8) Cement concrete 1:6:12 mixing with brick ballast 40mm gauge by manual means
Supplying of RCC shutter with one extra frame for nakka and branch offtakes
Fixing of shutter and frames for Nakka and branch offtakes
CHAPTER NO. 20.13 Providing,lowering precast concrete NP-2 plain end pipes and colla with reinforcement,in trenches to correct gradient and alignment,cutting of reinforcement cement concrete plain end pipes,stringing in trenches,jointing ends and fixing collar with cement mortar 1:2 as per IS 458:2003 into trenches for all depths and laying out same to correct alignment ,gradients,levels etc complete in all respect 700 mm i/d pipe
1.4 - Reconstruction of water course of outlet At RD 44270-L of Daulatpur Minor
CHAPTER NO. 6 Earthwork 6.2 Earthwork Excavation in ordinary soil, exclusive of compe nsation of earth:- (a) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods.
CHAPTER NO. 6 Earthwork 6.2 (b) Earth work undressed with a combined lead upto 15 metres including breaking of clods.
CHAPTER NO. 6 Earthwork 6.3 Dressing of earthwork (i) New work or remodeling work.
CHAPTER NO. 6 Earthwork Filling 6.8 (b(i))Earth work filling in 0.152 meter layers in foundation including ramming, watering and consolidation under bed
Rehandling of earthwork recently executed
CHAPTER NO. 6.18 Dag belling single kassi stroke minimum 7.5 cm depth
CHAPTER NO. 8 Dismantling (8.5 b) Dismantling brick work tile masonry or tile lining In cement
CHAPTER NO. 10 Concrete (10.29) Providing & laying dry brick bats
CHAPTER NO. 10.30 Supplying and laying dry brick ballast
Cement concrete 1:6:12 mixing with brick ballast 40mm gauge by manual means
CHAPTER No. 11 Brickwork (11.3 (i) )First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth
CHAPTER NO. 15 Plastering & Pointing (15.6) 10mm thick Cement Plaster 1:4
CHAPTER NO. 15 Plastering & Pointing (15.38) 10mm thick cement plaster 1 : 4 on floors.
CHAPTER NO. 19 Lining (19.1) Dressing bed and preparation of sub grade for lining.
Supplying of RCC shutter with one extra frame for Nakka and branch offtakes
Fixing of Shutter and frames for Nakka and branch offtakes
CHAPTER NO. 20.13 Providing,lowering precast concrete NP-2 plain end pipes and colla with reinforcement,in trenches to correct gradient and alignment,cutting of reinforcement cement concrete plain end pipes,stringing in trenches,jointing ends and fixing collar with cement mortar 1:2 as per IS 458:2003 into trenches for all depths and laying out same to correct alignment ,gradients,levels etc complete in all respect 700 mm i/d pipe
1.5 - Reconstruction of water course of outlet At RD 49683-L of Daulatpur Minor
CHAPTER NO. 6 Earthwork 6.2 Earthwork Excavation in ordinary soil, exclusive of compe nsation of earth:- (a) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods.
CHAPTER NO. 6 Earthwork 6.2 (b) Earth work undressed with a combined lead upto 15 metres including breaking of clods.
CHAPTER NO. 6 Earthwork 6.3 Dressing of earthwork (i) New work or remodeling work.
CHAPTER NO. 8 Dismantling (8.5 b) Dismantling brick work tile masonry or tile lining In cement
CHAPTER No. 11 Brickwork (11.3 (i) )First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth
CHAPTER NO. 15 Plastering & Pointing (15.6) 10mm thick Cement Plaster 1:4
CHAPTER NO. 15 Plastering & Pointing (15.38) 10mm thick cement plaster 1 : 4 on floors.
CHAPTER NO. 19 Lining (19.1) Dressing bed and preparation of sub grade for lining.
Re-handling of earthwork recently executed
CHAPTER NO. 6.18 Dag belling single kassi stroke minimum 7.5 cm depth
CHAPTER NO. 10 Concrete (10.29) Providing & laying dry brick bats
Supplying of RCC shutter with one extra frame for nakka and branch offtakes
Fixing of shutter and Frames for Nakka and Branch Offtakes
Providing and laying Cement Concrete 1:6:12
CHAPTER NO. 20.13 Providing,lowering precast concrete NP-2 plain end pipes and colla with reinforcement,in trenches to correct gradient and alignment,cutting of reinforcement cement concrete plain end pipes,stringing in trenches,jointing ends and fixing collar with cement mortar 1:2 as per IS 458:2003 into trenches for all depths and laying out same to correct alignment ,gradients,levels etc complete in all respect 700 mm i/d pipe
CHAPTER NO. 6 Earthwork Filling 6.8 (b(i))Earth work filling in 0.152 meter layers in foundation including ramming, watering and consolidation under bed
1.6 - Reconstruction of water course of outlet At RD 72790-L of Daulatpur Minor
CHAPTER NO. 6 Earthwork 6.2 Earthwork Excavation in ordinary soil, exclusive of compe nsation of earth:- (a) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods.
CHAPTER NO. 6 Earthwork 6.2 (b) Earth work undressed with a combined lead upto 15 metres including breaking of clods.
CHAPTER NO. 6 Earthwork 6.3 Dressing of earthwork (i) New work or remodeling work.
CHAPTER NO. 6 Earthwork Filling 6.8 (b(i))Earth work filling in 0.152 meter layers in foundation including ramming, watering and consolidation under bed
CHAPTER NO. 8 Dismantling (8.5 b) Dismantling brick work tile masonry or tile lining In cement
CHAPTER No. 11 Brickwork (11.3 (i) )First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth
CHAPTER NO. 15 Plastering & Pointing (15.6) 10mm thick Cement Plaster 1:4
CHAPTER NO. 15 Plastering & Pointing (15.38) 10mm thick cement plaster 1 : 4 on floors.
CHAPTER NO. 19 Lining (19.1) Dressing bed and preparation of sub grade for lining.
Rehandling of earthwork recently executed
CHAPTER NO. 6.18 Dag belling single kassi stroke minimum 7.5 cm depth
CHAPTER NO. 10 Concrete (10.29) Providing & laying dry brick bats
Supplying of RCC Shutter with One Extra Frame for Nakka and Branch Offtakes
Fixing of Shutter and Frames for Nakka and Branch Offtake
Providing and laying cement concrete 1:6:12
CHAPTER NO. 20.13 Providing,lowering precast concrete NP-2 plain end pipes and colla with reinforcement,in trenches to correct gradient and alignment,cutting of reinforcement cement concrete plain end pipes,stringing in trenches,jointing ends and fixing collar with cement mortar 1:2 as per IS 458:2003 into trenches for all depths and laying out same to correct alignment ,gradients,levels etc complete in all respect 700 mm i/d pipe
CHAPTER NO. 10.30 Supplying and laying dry brick ballast
Any other item
VARSHA CONSTRUCTION CO (BID ID -609289)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .