| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹43.2 LAdmitted-Finance | -0.50% | ₹43.2 L | L1 | Admitted-Finance |
| 2 | L2₹43.4 LAdmitted-Finance | +0.00% | ₹43.4 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Finance | - | - | - | Not Admitted-Finance Not qualified for AOC |
| 4 | Not Admitted-Fee/PreQual/Technical 204 K K TAWAR STATE BANK COLLY KASGANJ DISTRICT KASGANJ | KASGANJ | UTTAR PRADESH | 207123 | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹43.5 L
EMD Value
₹4.2 L
Closing Date
24 Mar 2026, 12:00 pmClosed
Superintending Engineer
Office of the SE, AC, PWD, Aligarh
as per BoQ attached
2026_CEALG_1125853_7
1235/Cashier(PDK)-AC/2025-26 Dt 27-02-2026
Open Tender
Civil Works - Roads
180 days
Distt bKasganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹4.2 L
Office of the SE, AC, PWD, Aligarh
25 May 2026
16 Mar 2026
24 Mar 2026
16 Mar 2026
24 Mar 2026
16 Mar 2026
16 Mar 2026 - 24 Mar 2026
17 Mar 2026
Construction of Subgrade and earthen shoulders with approved Material Obtained from Borrow Pits with all lift and leads transporting to site, Spreasing to grading to required Slop and Compacted to meet requirement of Tables 300.2 with a lead upto 30m as per Technical Specification Clause 301.1
Excavation in foundation in ordinary soil (Loam, clay or sand) upto 30 M and including lift upto 1.50 M and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M from the foundation trenches as per S.I. No. 251(a). Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the nterstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. (A)By Manual Mean
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
Brick edging on both side of the road of M-150 bricks 8cm. (3") wide and 12cm (4½") deep laid with mud mortar including all labour and supply of brick finished to required template & ramming the excavated earth as directed by the Engineer-In- Charge.
Prime Coat (i) Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Tack Coat (i) Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with Hydraulic broom as per Technical Specification Clause 503. (Including Cost of Bitumen (V G-10 )
20mm thick Open-Graded Premix Carpet using Bituminous Binder (VG-10) Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Case - III Type-C By Manual Means (I)Bitumen (VG-10) (Including Cost of Bitumen (V G-10)
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 A.By Manual Means Case - III : Type C (I) Bitumen (VG-10) (Including Cost of Bitumen (V G-10 )
CEMENT CONCRETE PAVEMENT(C.C ROAD) construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side from work (steel channel laying and fixing of 125 micron thick plastic sheet, wedges steel plates including levelling the form work as per drawing) spreading the concrete with shovels, rakes compacted using needle, screed and plate vibrators and finished in continuous opration including provision of contraction and expansion construction joints applying debonding strips primer, sealant admixtures as approved curing concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501.
Construction of Subgrade and earthen shoulders with approved Material Obtained from Borrow Pits with all lift and leads transporting to site, Spreasing to grading to required Slop and Compacted to meet requirement of Tables 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.1
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete asper Drawing and Technical Specifications.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (M 10)
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications Clause no.600,1202&1203
Supply, laying and fixing of 600 mm dia NP-4 class hume pipes in proper position in culvert.
Plastering with cement mortar (1:4), 12 mm thick on brickwork in substructure as per technical specification clauses 613 & 1204
White washing with lime on undecorated wall surfaces (Three coats) to give an even shade including thoroughly brooming the surface to remove all dirt, dust mortar drops and loose scales of lime wash and other foreign matters.. as per DSR 13.37.1
05 Year Maintenance Charge Routine Maitenance of road for 05 Years after the competion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.) 1-1st Year
Maintenance for 2nd Year at Cost of Total Execute Work
Maintenance for 3rd Year at Cost of Total Execute Work
Maintenance for 4th Year at Cost of Total Execute Work
Maintenance for 5th Year at Cost of Total Execute Work
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
BOQ_2099154.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid