| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance | ₹2.5 L | L1 | Admitted-Finance |
| 2 | L2₹2.8 LAdmitted-Finance | ₹2.8 L | L2 | Admitted-Finance |
| 3 | L3₹2.8 LAdmitted-Finance | ₹2.8 L | L3 | Admitted-Finance |
| 4 | L4₹3.4 LAdmitted-Finance | ₹3.4 L | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Incomplete Document |
| Sl No | Description | Qty | Unit | R. P. T. Electrical L4 | TRIMURTI ENTERPRISES L2 | shree sai enterprises L1 | M/s Sigma Electricals L3 |
|---|---|---|---|---|---|---|---|
| 1.00Safe Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. :- | |||||||
| 1.01 | PCC Pole 8.5 Mtr. Long | 21 | Nos | 700 ₹14,700 | 600 ₹12,600 | 400 ₹8,400 | 500 ₹10,500 |
| 1.02 | PCC Pole 11 Mtr. Long | 3 | Nos | 1,000 ₹3,000 | 1,000 ₹3,000 | 400 ₹1,200 | 500 ₹1,500 |
| 1.03 | LT AB Cable 3x50+1x35+1x16 sq.mm | 200 | Mtr | 15 ₹3,000 | 10 ₹2,000 | 10 ₹2,000 | 20 ₹4,000 |
| 1.04 | LT AB Cable 3x120+1x95+1x16 sq.mm | 400 | Mtr | 30 ₹12,000 | 10 ₹4,000 | 15 ₹6,000 | 20 ₹8,000 |
| 1.05 | LT Distribution box | 7 | Nos | 250 ₹1,750 | 100 ₹700 | 30 ₹210 | 15 ₹105 |
| 1.06 | Stay set complete | 16 | Nos | 200 ₹3,200 | 200 ₹3,200 | 50 ₹800 | 40 ₹640 |
| 1.07 | XLPE Lead 1x400 sq.mm | 100 | Mtr | 100 ₹10,000 | 40 ₹4,000 | 50 ₹5,000 | 50 ₹5,000 |
| 1.08 | 11 KV Fuse Set | 2 | Nos | 500 ₹1,000 | 300 ₹600 | 1,000 ₹2,000 | 1,200 ₹2,400 |
| 1.09 | Dropper Channel | 2 | Nos | 200 ₹400 | 150 ₹300 | 300 ₹600 | 400 ₹800 |
Tender Value
₹3.1 L
EMD Value
₹3,200
Closing Date
24 Mar 2026, 12:00 pmClosed
SUPERINTENDING ENGINEER
SE, EDC-1, MEERUT
ETNo-57/EDC-1/MT/2025-26
2026_PVVNL_1126943_1
ETNo.57/EDC-1/MT/2025-26
Open Tender
Electrical Works
180 days
UNDER EDD-PARTAPUR MEERUT
ETNo-57/EDC-1/MT/2025-26
2 documents required · 2 mandatory
₹1,180
SUPERINTENDING ENGINEER
₹3,200
2 Apr 2026
18 Mar 2026
24 Mar 2026
18 Mar 2026
24 Mar 2026
18 Mar 2026
Safe Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. :-
PCC Pole 8.5 Mtr. Long
PCC Pole 11 Mtr. Long
LT AB Cable 3x50+1x35+1x16 sq.mm
LT AB Cable 3x120+1x95+1x16 sq.mm
LT Distribution box
Stay set complete
XLPE Lead 1x400 sq.mm
11 KV Fuse Set
Dropper Channel
T-off channel
Top channel
MS Angle 65x65x6
ACSR Weasal Conductor
11 KV Pin Insulator with Pin
11 KV Disc Insulator with fitting
Earthing Rod
25 KVA T/F
Errection PCC Pole 8.5 & 11 mtr long after digging a pit of size 1.6 mtr deep in all type of Soil including grouting of the pole with proper ramming after completion of work. (as per UPPCL Respo).
Erection of Double pole on PCC Pole 8.5 & 11 mtr. Long with grouting after digging a pitt of size 1.20 x 0.60 x 1.6 mtr in all type of Soil for each pole including back filling of the pole with proper ramming after completion of work. (as per UPPCL Respo).
Laying, lifting of LT AB Cable 3x50+1x35+1x16 sq.mm (as per UPPCL Respo).
Laying, lifting of LT AB Cable 3x120+1x95+1x16 sq.mm (as per UPPCL Respo).
Laying, lifting of ACSR Weasal Conductor (as per UPPCL Respo).
Fixing of Stay rod complete after digging a pit of size 1.6 mtr deep and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming. (as per UPPCL Respo).
Fixing of Distribution Box (as per UPPCL Respo).
Grouting of Stay Set (as per UPPCL Respo).
Fixing of XLPE Lead 1x400 sq.mm (as per UPPCL Respo).
Fixing of 11 kv fuse Set (as per UPPCL Respo).
Fixing of Dropper channel (as per UPPCL Respo).
Fixing of T-off channel (as per UPPCL Respo).
Fixing of Top channel (as per UPPCL Respo).
Fixing of MS Angle 65x65x6 (as per UPPCL Respo).
Fixing of 11 KV Pin Insulator with Pin (as per UPPCL Respo).
Fixing of 11 KV Disc Insulator with fitting (as per UPPCL Respo).
Fixing of Earthing Rod (as per UPPCL Respo).
Mounting of 25 KV T/F on double pole (as per UPPCL Respo).
Providing and fixing of Clamp with Nut and bolt (As Per Direction of Supervising Engineer).
Providing and fixing of Dead and Clamp (As Per Direction of Supervising Engineer).
Providing and fixing of Suspension clamp (As Per Direction of Supervising Engineer).
Providing and fixing of Piercing clamp
Providing and fixing of Stone Pad (As Per Direction of Supervising Engineer).
Providing and fixing of MS Nut and bolts off size (As Per Direction of Supervising Engineer).
Providing and fixing of Tailless Unit (As Per Direction of Supervising Engineer).
Chemical Earthing of 400 KVA T/F as per Respo Schedule (as per UPPCL Respo).
Fencing of 400 KVA T/F as per Respo Schedule (as per UPPCL Respo).
Making of Plinth 400 KVA T/F as per Respo Schedule (as per UPPCL Respo).
Providing and fixing of J Hook (As Per Direction of Supervising Engineer).
Providing and fixing of Danger Board (As Per Direction of Supervising Engineer).
Providing and fixing of Barbed Wire (As Per Direction of Supervising Engineer).
Providing and fixing of LT Fuse Box (As Per Direction of Supervising Engineer).
Providing and Fixing of LT Sackle Insulator (As Per Direction of Supervising Engineer).
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
TENDERFORM57.pdf
Tender Documents • 0.20 MB
BOQ_2101776.xls
BOQ • 0.29 MB