Tender Value
₹4.9 L
EMD Value
₹9,792
Closing Date
24 Jun 2026, 6:00 pmClosed
EE WRD I BHILWARA
EE WRD I BHILWARA
Earth Work and Boulder Filling Down Stream of Arwar Dam of Water Resources Subdivision Shahpura During Rainy Season for the Year 2026-27
2026_WRDAS_569623_14
NIT-02/26-27/887/BHL/WRD-I
Open Tender
Civil Works
Percentage
120 days
BHILWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
AS NIT CONDITIONS
₹9,792
Yes
25 Jun 2026
19 Jun 2026
25 Jun 2026
19 Jun 2026
24 Jun 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.
Thick | 750 | P.sqm | 2.5 | ₹1,875 |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect Hard soil/dense soil | 237.6 | Cum | 79 | ₹18,770.4 |
| 3 | Supply of well stiched earth filled bags of capacity. Weigh not less than 40 kg per bag at site etc. complete;
(b) Plastic bag. | 650 | Each | 16 | ₹10,400 |
| 4 | Earth work in rough (borrow area) excavation for embankment in hard soil, Morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor,vibro sheep foot roller,sheep foot roller/pneumatic tyred roller to obtain dry density of at least 90% of standard proctore density with initial lift of 1.5m (excluding charges for compaction and watering )including loading and un-loading wherever required complete in all respect. With Initial Lead 250 M | 300 | Cum | 88 | ₹26,400 |
| 5 | Watering of earth including cost of carriage of water when source of water is upto 1.0km. | 300 | Cum | 11 | ₹3,300 |
| 6 | Compaction of earth or highly weathered strata
By manually or plain roller. (density 90% of Proctor) | 300 | Cum | 21 | ₹6,300 |
| 7 | Stones for soling, boulder for rock toe, toe drain, rock fill etc. not less than 15 cm in any direction including all lead and lift. | 450 | Cum | 939 | ₹4,22,550 |
stage.html
html • 0.02 MB
finance_1013670.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.92 MB
BOQ_1013670.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .