Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.5 LAdmitted-Fee/PreQual/Technical/Finance | -23.90% | ₹12.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹12.9 L+₹39,429.97 (3.15%)Admitted-Fee/PreQual/Technical/Finance | -21.50% | ₹12.9 L+₹39,429.97 (3.15%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹16.4 L
EMD Value
₹32,860
Closing Date
10 Jul 2026, 4:00 pmClosed
Executive Engineer RnB Division Gurez
Executive Engineer RnB Division Gurez
Construction of Yabtang Khul By Way Of Construction of Head Work Linning wall n Drainage Crossing. (Balance work)
2026_PWDJK_314411_1
(InFC) E-NIT No 20 of 2026-27 EE-RnB-Grz-2835-41 E-tendering Dated-02-07-2026
Open Tender
Civil Works
Percentage
60 days
Gurez
Please refer Tender documents.
5 documents required · 5 mandatory
₹800
Executive Engineer RnB Division Gurez
₹32,860
Executive Engineer RnB Division Gurez
15 Jul 2026
3 Jul 2026
11 Jul 2026
3 Jul 2026
10 Jul 2026
3 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Lining Wall and Bed treatment of Yab Khul From RD 188.00Mtr to RD 432.60 Mtr. Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto1.5m,asdirectedbyEngineer-in-Charge. All kinds of soil : | 88.06 | Cum | 592.9 | ₹52,208.4 |
| 2 | Providing,Laying of Stone Soiling in horizontal all Carriage complete job. | 56.13 | Cum | 1,200 | ₹67,356 |
| 3 | Providing and Laying in position Cement concrete of specified grade including curing but excluding the cost of centering and shuttering.All work upto plinth level with 1:3:6 mix.(Nallah). | 176.11 | Cum | 5,500 | ₹9,68,605 |
| 4 | Cement concrete flooring in 1:2:4 (1 cement: 2coarse sand: 4 graded stone agg., 20mm nominal size finished with a floating coat of neat cement slurry all inclusive leads, lifts, loading, un-loading, head load, cost and carriage of materials from approved nearest sources to site of work complete.50mm thick. | 220.14 | Sqm | 562.15 | ₹1,23,751.7 |
| 5 | Centering and shuttering including strutting,propping etc.and removal of form work for foundation,Walls etc. | 587.04 | Sqm | 286.35 | ₹1,68,098.9 |
| 6 | 12mm Cement plaster of mix. 1:4(1 cement : 4 sand). | 440.28 | Sqm | 283.8 | ₹1,24,951.46 |
| 7 | Carriage og Material by MT incl. Loading,unloading and stacking complete job.
Cement avg.lead for 3km. | 45.55 | MT | 147.41 | ₹6,714.53 |
| 7.01 | Sand/Agg. avg.lead for 5km. | 254.47 | Cum | 200.74 | ₹51,082.31 |
| 8 | Carriage of material by Manual means including loading , unloading and stacking complete job.Cement avg.lead for 150mtr. | 45.55 | MT | 150.32 | ₹6,847.08 |
| 8.01 | Sand /Agg. avg.lead for 150mtr. | 254.47 | Cum | 288.05 | ₹73,300.08 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_1018011.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .