| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-Finance | ₹3.1 L | L1 | Accepted-Finance First lowest |
| 2 | L2₹3.2 LAccepted-Finance | ₹3.2 L | L2 | Accepted-Finance Second lowest |
| Sl No | Description | Qty | Unit | BIJAY PRASAD SINGH L1 | SANJIV KUMAR L2 |
|---|---|---|---|---|---|
| 1.00SH: RCC WORK | |||||
| 1.01Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | |||||
| 1.02 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.35 | Cum | 11,400 ₹3,990 | 11,500 ₹4,025 |
| 1.03 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). | 1.5 | Cum | 12,000 ₹18,000 | 12,500 ₹18,750 |
| 1.04Centering and shuttering including strutting, propping etc. and removal of form for : | |||||
| 1.05 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 9 | Sqm | 800 ₹7,200 | 1,000 ₹9,000 |
| 1.06 | Columns, Pillars, Piers, Abutments, Posts and Struts | 4.5 | Sqm | 1,200 ₹5,400 | 1,500 ₹6,750 |
| 1.07Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | |||||
| 1.08 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | 185 | Kg | 115 ₹21,275 | 120 ₹22,200 |
| 1.09 | Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand). | 13.5 | Sqm | 320 ₹4,320 | 330 ₹4,455 |
Tender Value
Refer Docs
EMD Value
₹5,850
Closing Date
13 Apr 2026, 6:00 pmClosed
Executive Engineer Civil
The Executive Engineer Civil BSNL Civil Division 3rd Floor Telephone Bhawan Shaheed Chowk Ranchi 834001 Phone no 0651 2245155
Providing and fixing 9 Metre height Roof Top Pole Three legged at New BTS site at Tupudana Ranchi
2026_BSNL_274078_1
01/NIT/EE(C)/BCD/RCH/2026-27
Open Tender
Civil Works
60 days
Ranchi
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Yes
Accounts Officer Cash BSNL Olo GMTD Ranchi
₹5,850
Yes
20 Apr 2026
6 Apr 2026
15 Apr 2026
6 Apr 2026
13 Apr 2026
6 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
SH: RCC WORK | - | - | - | - | |
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | - | - | - | - | |
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.35 | Cum | - | - | |
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). | 1.5 | Cum | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for : | - | - | - | - | |
Lintels, beams, plinth beams, girders, bressumers and cantilevers | 9 | Sqm | - | - | |
Columns, Pillars, Piers, Abutments, Posts and Struts | 4.5 | Sqm | - | - | |
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | - | - | - | - | |
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 185 | Kg | - | - | |
Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand). | 13.5 | Sqm | - | - |
stage.html
html • 0.03 MB
techsummary_319980.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
Tendernotice_2.pdf
PDF • 2.16 MB
BOQ_319980.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid