Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-AOC 26 BABA STREET TIRUNELVELI TOWN TIRUNELVELI 627 006 | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | 627006 | ₹12.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹12.9 LRejected-AOC NO 275 8TH CROSS STREET KODEESWARAN NAGAR TIRUNELVELI TOWN TIRUNELVELI 627006 | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | 627006 | ₹12.9 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | R.KUMAR L1 | PERUMAL KUMAR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 261 | m3 | 167 ₹43,587 | 167.29 ₹43,662.69 |
| 2.00 | Supplying and filling in foundation and basement with filling stone dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 33 | m3 | 296 ₹9,768 | 296.53 ₹9,785.49 |
| 3.00 | Plain Cement Concrete 1:4:8 using 40mm gauge ISS HBG metal from approved quarry including cost and conveynace of material to site and all labour charges etc., complete as per standard specification | 34 | m3 | 4,799 ₹1.6 L | 4,799.05 ₹1.6 L |
| 4.00 | Providing and erecting steel centering for sides and soffits with necessary strutting arrangemnets with out Props including all the cost and conveyance of materials to site and all labour cahrges etc. complete as per standard specification. | 748 | m2 | 421 ₹3.1 L | 420.95 ₹3.1 L |
| 5.00 | Plain cement Concrete mix 1:3:6 (One Cement, Three sand and six aggregate) using 20mm ISS HBG metal from approved quarry including cost and conveyance of materials to site and all labour charges etc., complete asper standard specification.(S.D. 127) | 77 | m3 | 5,497 ₹4.2 L | 5,496.95 ₹4.2 L |
| 6.00 | Reinforced cement concrete of mix 1:11/2:3 using 20mm ISS HBG metal from approved quarry and all cost of materials for all RCC works with all cost and conveyance of materials and labour charges etc., complete. | 5 | m3 | 8,279 ₹41,395 | 8,279.05 ₹41,395.25 |
| 7.00 | Supplying, fabricating and placing in position of R.T.S. rods for cutting, bending, straightening of rods and tying the grills for reinforcement with necessary binding wire including all cost and conveyance of materials to site with all labour cost etc., complete as per standard specification. | 500 | Kg | 88.7 ₹44,350 | 88.69 ₹44,345 |
| 8.00 | Plastering with Cement Mortar 1:4 , using 20mm thick with all cost and convleyance of materials and all labour charges etc., complete as per standard specification | 94 | m2 | 525 ₹49,350 | 525.76 ₹49,421.44 |
Tender Value
₹13 L
EMD Value
₹13,000
Closing Date
9 Oct 2023, 3:00 pmClosed
COMMISSIONER TIRUNELVELI CORPORATION
S.N.High road Main office Tirunelveli Corproration
Construction of Storm Water Drain at Perumal East street in Ward No.13.
2023_MAWS_373867_1
33/2023-24/40
Open Tender
Civil Works
90 days
S.N.High road Main office Tirunelveli Corproration
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹13,000
4 Jun 2026
27 Sept 2023
10 Oct 2023
27 Sept 2023
9 Oct 2023
27 Sept 2023
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_445781.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid