| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹16.8 L+₹89,274.09 (5.60%)Rejected-Finance R O VILL CHEOG TEH THEOG DISTT SHIMLA | L2 | Rejected-Finance Rejected | |
| 3 | L3₹17.3 L+₹1.4 L (8.60%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | L4₹21.9 L+₹6.0 L (37.5%)Rejected-Finance R O BRAGTA BHAWAN CHOTTA SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | L4 | Rejected-Finance Rejected | |
| 5 | L5₹23.9 L+₹8.0 L (50.3%)Rejected-Finance VILL JAUNI P O GRONG TEH KOTKHAI DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 170009 | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | HARMANJOT SINGH L3 | BILAL AHMED BUTT L1 | RAM LAL L4 | SANDEEP CHAUHAN L6 | SATISH KUMAR JAGTA L7 | SHUBHAM THAKUR L2 | VIRENDER BANSHTU L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. Ordinary rock | 1.62 | P.Cum | 1,000 ₹1,620 | 10 ₹16.2 Lowest | 305 ₹494.1 | 450 ₹729 | 500 ₹810 | 180 ₹291.6 | 400 ₹648 |
| 2.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in charge.Nominal concrete 1:3:6 | 1.62 | P.cum | 1,000 ₹1,620 | 10 ₹16.2 Lowest | 1,100 ₹1,782 | 1,300 ₹2,106 | 1,800 ₹2,916 | 180 ₹291.6 | 1,400 ₹2,268 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) | 1.8 | P.cum | 5,000 ₹9,000 | 100 ₹180 Lowest | 4,200 ₹7,560 | 6,000 ₹10,800 | 5,200 ₹9,360 | 3,600 ₹6,480 | 5,000 ₹9,000 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 9 | P.sqm | 300 ₹2,700 | 10 ₹90 Lowest | 400 ₹3,600 | 400 ₹3,600 | 600 ₹5,400 | 160 ₹1,440 | 500 ₹4,500 |
| 5.00 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars | 153 | P.Kg | 80 ₹12,240 | 68 ₹10,404 Lowest | 92 ₹14,076 | 120 ₹18,360 | 110 ₹16,830 | 75 ₹11,475 | 100 ₹15,300 |
| 6.00 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 6,145.6 | P.Kg | 100 ₹6,14,560 | 98 ₹6,02,268.8 | 102 ₹6,26,851.2 | 115 ₹7,06,744 | 120 ₹7,37,472 | 80 ₹4,91,648 Lowest | 110 ₹6,76,016 |
| 7.00 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes | 1,413.32 | P.Kg | 110 ₹1,55,465.42 | 10 ₹14,133.22 Lowest | 120 ₹1,69,598.64 | 140 ₹1,97,865.08 | 150 ₹2,11,998.3 | 98 ₹1,38,505.56 | 130 ₹1,83,731.86 |
| 8.00 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In chequred plates 6 mm thick | 8,749.15 | P.Kg | 80 ₹6,99,932 Lowest | 107 ₹9,36,159.05 | 120 ₹10,49,898 | 140 ₹12,24,881 | 150 ₹13,12,372.5 | 92 ₹8,04,921.8 | 130 ₹11,37,389.5 |
| 9.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) | 2.04 | P.cum | 5,000 ₹10,200 Lowest | 5,800 ₹11,832 | 6,800 ₹13,872 | 8,900 ₹18,156 | 8,700 ₹17,748 | 5,200 ₹10,608 | 8,500 ₹17,340 |
| 10.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) | 43.2 | P.cum | 4,500 ₹1,94,400 | 90 ₹3,888 Lowest | 6,500 ₹2,80,800 | 7,800 ₹3,36,960 | 7,800 ₹3,36,960 | 4,800 ₹2,07,360 | 7,500 ₹3,24,000 |
Tender Value
₹22.8 L
EMD Value
₹45,600
Closing Date
4 Jun 2025, 5:00 pmClosed
Executive Engineer R B M C Shimla
Executive Engineer R B M C Shimla
C O Steel Parking over existing parking at Majitha House in ward No 17 Benmore SH Excavation work PL CC 1 2 4 Steel Work PL Chequred plate etc
2025_MC_106259_1
1138dated22052025
Open Tender
Civil Works
Item Rate
180 days
Shimla
Please refer tender documents
7 documents required · 7 mandatory
₹590
Executive Engineer R B M C Shimla
₹45,600
7 Aug 2025
27 May 2025
5 Jun 2025
27 May 2025
4 Jun 2025
27 May 2025
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. Ordinary rock
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in charge.Nominal concrete 1:3:6
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In chequred plates 6 mm thick
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture
SHUBHAM THAKUR (BID ID -521683)
HARMANJOT SINGH (BID ID -521787)
RAM LAL (BID ID -522080)
VIRENDER BANSHTU (BID ID -521669)
SANDEEP CHAUHAN (BID ID -521751)
SATISH KUMAR JAGTA (BID ID -521687)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .