Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.2 LAdmitted-Finance | -47.86% | ₹18.2 L | L1 | Admitted-Finance |
| 2 | L2₹19.8 L+₹1.5 L (8.48%)Admitted-Finance | -43.44% | ₹19.8 L+₹1.5 L (8.48%) | L2 | Admitted-Finance |
| 3 | L3₹21.7 L+₹3.5 L (18.9%)Admitted-Finance | -37.99% | ₹21.7 L+₹3.5 L (18.9%) | L3 | Admitted-Finance |
| 4 | L4₹22.7 L+₹4.5 L (24.7%)Admitted-Finance | -35.00% | ₹22.7 L+₹4.5 L (24.7%) | L4 | Admitted-Finance |
| 5 | L5₹22.9 L+₹4.6 L (25.4%)Admitted-Finance | -34.60% | ₹22.9 L+₹4.6 L (25.4%) | L5 | Admitted-Finance |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
12 Aug 2026, 4:00 pmClosed
Executive Engineer JKTDC
Executive Engineer JKTDC, TRC Srinagar
Construction of retaining wall including other allied works at T.E. Ramban
2026_Tourm_318984_1
E NIT No 7 of 2026-27
Open Tender
Civil Works - Others
Percentage
365 days
Srinagar
Construction of retaining wall including other allied works at T.E. Ramban
3 documents required · 3 mandatory
₹3,500
FA and CAO JKTDC
₹70,000
24 Aug 2026
1 Aug 2026
14 Aug 2026
2 Aug 2026
12 Aug 2026
2 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old damage stone wall and stacking of service able and disposal of unserviceable material with in 50 mtr lead. | 63.7 | cum | 2,036.4 | ₹1,29,718.68 |
| 2 | Earth work in excavation by manual/mechanical means in tranches, foundation, drains not execding 1:5 mtr in width as well as 10 sqm on plan including dressing of sides and draining of bottom. | 66.7 | cum | 592.9 | ₹39,546.43 |
| 3 | Providing and Laying of cement concrete in 1:4:8 mix 1 cement, 4 coarse sand, 8 graded stone 40 mm nominal size excluding cost of shuttering. | 8.7 | cum | 5,202.9 | ₹45,265.23 |
| 4 | Centering and Shuttering including strutting, propping etc and removal of form for foundation footing base of column, retaining wall of any thichness. | 526.95 | sqm | 628.95 | ₹3,31,425.2 |
| 5 | Providing and Laying of cement concrete in 1:2:4 mix 20 mm nominal size for boundry wall excluding cost of shuttering. | 45.9 | cum | 8,422.45 | ₹3,86,590.46 |
| 6 | 15mm thick cement plaster in 1:4 mix (1 cement, 4 coarse sand including curring all complete. | 378.5 | sqm | 400 | ₹1,51,400 |
| 7 | Providing and fixing of M.S steel railing of approved design and patternincluding cutting, welding, hosting and fixed in position including cost of preming coats. | 75 | Rft | 1,200 | ₹90,000 |
| 8 | Reinforcement for RCC work including cutting, bending and binding all complete. | 2,917 | Kg | 123.2 | ₹3,59,374.4 |
| 9 | Reinforcement cement concrete 1:1:5:3 mix 20 mm nominal size aggregaite for retaining wall, return wall of any thickness including attached pilasters, column , post, struts excluding cost of centering and sturring. | 167.25 | cum | 9,395.7 | ₹15,71,430.83 |
| 10 | Filling available excuvation earth on sides of plinth or back side of wall and consolidated each deposited layer including raiming and watering all complete. | 111.51 | cum | 198.7 | ₹22,157.04 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.51 MB
BOQ_1054167.xls
BOQ • 0.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .