Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.6 LAccepted-Finance 78 GREATER KAILASH KUNJWANI DISTRICT JAMMU | 1 | Accepted-Finance ok | |
| 2 | 2₹3.8 L+₹13,632.58 (3.76%)Accepted-Finance | 2 | Accepted-Finance ok | |
| 3 | 3₹3.8 L+₹20,690 (5.70%)Accepted-Finance | 3 | Accepted-Finance ok |
Tender Value
₹4.5 L
EMD Value
₹9,076
Closing Date
24 Nov 2023, 6:00 pmClosed
DFO Udhampur
DFO Udhampur
Establishment/Formation of new nursery in Comptt. 51/U Panghara Udhampur Forest Range Udhampur Forest Division under CAMPA FY 2023-24
2023_FD_237351_1
135 NIT of 2023-24
Open Tender
Agricultural or Forestry
Item Wise
20 days
Panghara
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
DFO Udhampur
₹9,076
28 Nov 2023
18 Nov 2023
25 Nov 2023
18 Nov 2023
24 Nov 2023
18 Nov 2023
18 Nov 2023 - 24 Nov 2023
Amount
Earthwork in excavation by manual means in trenches for foundation, drains, pipes, cables etc (not exceeding 1.5 m, in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth up to 1.5m including disposal of excavated earth up to 50 mtrs from cutting edge, disposed earth is to be leveled and neatly dressed 80% dense harder soil and 20% ordinary rock complete.
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 and curing complete
Dry Random Rubble masonry with hard stone in foundation & plinth with bond stone (Quarry stone).
Demolishing Dry stone rubble masonry manually means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level 1:4:8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level 1:2:4
Centering and shuttering including strutting, propping, etc and removal of form work in foundation, footings, bases of columns etc.
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded
Painting on G.S Sheets with synthetic enamel paint of approved band and manufacture of required colour to give an even shade on New work including a coat of approved steel primer but excluding a coat of mordant solution complete job
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barded wire weighing 9.38 kg per 10 m, between the two posts fitted and fixed with G.I Staples, turn buckles etc complete. Payment to be made per meter cost of total length of barbed wire used. With G.I Barbed wire complete job.
Sign board incl. carriage painting, writing priming and fixing in position complete job of size 4'0" x 4'0" with vertical iron 2 no. of size 50 x50x 6 mm iron angle of height 7rft with 2 mm thick M.S Sheet & Embed in cement concrete 1:3:6 size 1'6" x 1'6" x 2'0" LMR complete job
DEV RAJ
SUMEET SAMBYAL CONTRACTOR
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .