Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance NO 9 CHAIRMAN JANAGARAJ STREET SRI RAGAVENDHRA GARDEN ALAMELUPURAM VILLUPURAM 605 602 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605602 | Admitted-Finance |
| 3 | Admitted-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | Admitted-Finance |
| 4 | Admitted-Finance 52 A CUDDALORE ROAD VRIDDHACHALAM 606 001 CUDDALORE DIST | VRIDDHACHALAM | CUDDALORE | TAMIL NADU | 606001 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹23,500
Closing Date
12 Mar 2024, 2:00 pmClosed
AEE/GL/GCC/Trichy
O/o. SE/GCC/Trichy, Periyamilaguparai,Trichy
strengthening of existing 110 KV SC line on DC towers with leopard conductor in to panther conductor between location 28 to 33 of 110 KV Ulundurpet to Thiyagadurgam feeder.
2024_EB_430782_1
GCC 048 GL 01 2023 24
Open Tender
Civil Works
Works
90 days
Thiyagadurgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹23,500
Yes
19 Mar 2024
26 Feb 2024
13 Mar 2024
26 Feb 2024
12 Mar 2024
26 Feb 2024
Amount
Conducting check survey,fixing of location and pit marking for tower foundation as per the approved profile cost of survey equipment tools & plants including cost of all T & Ps, transport, labour, lead lift etc complete as directed by engineer.
Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete.
Earthwork excavation in SDR not requiring blasting inlcuding all cost of lead lift etc complete.
Earthwork excavation in MR & DMR requiring blasting inlcuding all cost of lead lift etc complete.
Earthwork excavation in Hard rock mearured in solid including blasting & stacking inlcuding all cost of lead lift etc complete.
Earthwork excavation in Removing hard rock by wedging,chiseling and trimming to proper shape where blasting is prohibited inlcuding all cost of lead lift etc complete.
Transporting and fixing of stub and cleat with supply of template and assembling at site and shifting the template from loc to loc including cost of template labour, fabrication charges etc complete.(HCR tower with or with out extension) .
Transporting and fixing of stub and cleat with supply of template and assembling at site and shifting the template from loc to loc including cost of template labour, fabrication charges etc complete.(GCR tower with or with out extension).
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges,labour, fuel, oil, transport etc complete.
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.
PCC1:2:4 using 20mm metal for foundation for tower concrete with out form work including cost of all materials, lead, lift , etc complete .
PCC1:2:4 using 20mm metal for foundation tower concrete with steel frustum box and chimney box work including cost of all materials, lead, lift , etc complete .
Back filling with the excavated earth including watering and consolidation in layers each layer not exceeding 150mm thick and spreading the balance earth around the location labour charges ,lead, lift, etc complete. (HCR tower)
Back filling with the excavated earth including watering and consolidation in layers each layer not exceeding 150mm thick and spreading the balance earth around the location labour charges ,lead, lift, etc complete.(GCR tower).
supply & Providing earthing as per approved specification and as directed by the site engineer including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.
Labour & Transport and erection of GI tower parts including stub and cleat in accordance with boards design as per drawing furnished and as IS ;2062 grade A and as detailed in this specification & tightening punching of bolt & nuts transport charges to each location ,final checking cost of T &P,labour, lead, lift etc complete .
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials,labour, lead, lift,etc complete .
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete
Painting with two coats of using best quality anticorrosive paint over tower leg at a height of 1.00m above coping including cost of all materials,labour, lead lift etc complete in all respects.
Providing welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level 1 cm each side at two places opposite to each other after tightening and punching of bolt & nuts including painting the welded portion of bolt and nuts two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost ofwelding rod ,hire charges of diesal generator and welding transformer, paint and all T & P including cost of all materials labour,lead, lift etc complete.
Labour charges for transporting and hoisting of 7 units of 90 KN disc insulators from department store with supply & fixing of suspension fitting for panther with all allied hard ware fittings including transport T & P including all cost of labour,lead, lift, T & P etc complete without PA rod for panther with PA rod for panther
Labour charges for transporting and hoisting of 7 units of 90 KN disc insulators from department store with supply & fixing of suspension fitting for panther with all allied hard ware fittings including transport T & P including all cost of labour,lead, lift, T & P etc complete without PA rod for panther without PA rod for panther
Labour charges for transporting and hoisting of 8units of 120 KN disc insulators from department store with supply & fixing of Single tension fitting SB damper with all allied hard ware fittings including transport T & P including all cost of labour,lead, lift, T & P etc complete
Labour charges for stringing of 3 Nos of ACSR Panther conductor including cost of loading & unloading transporting , sorting out of drums according to drum schedule providing trusseles ,paying out, jointing,rough sagging, tensioning, clipping,Supply of hardware fitting& panther conductor providing vibration dambers at tension locationsand all accessories including jumber connections, cost of T&P ,moving the drum to work spot all labour ,lead, lift, etc complete in all respects . ( Continous Span )
Labour charges for transport of 7/3.55mm GI earthwire and fixing of GI earthwire supply of hardwares* supply of earthwire (ie ST fittings, SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing,rough sagging, tensioning, including jumber connection transport charges, loading,unloading ,lead, lift, cost of T&P, etc complete.(Continous Span )
supply & transport & Labour charges for fixing of Number Plate , Danger Board ,Phase plate set of three in tower as directed by the engineer at site including all cost of labour transport,lead, lift,etc complete
Supply,fabrication and fixing of name board with 18 gauge plate with one coat red oxide and two coat enamel paint for back ground lettering with enamel of approved colour fixing in tower as directed all materials labour,lead, lift, etc, complete .for name board size approved by the engineer incharges of works.
Providing temporary guys with steel wires and turn buckles including necessary excavation for fixing RSJ/rail bit or concrete blocks for anchorage dismantling after after completion of stringing works including cost of allmaterials,lead,lift,labour etc complete.
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete
Labour charges for removal of Small trees
Labour charges for removal of Large tree
Clearing Juliflora jungle including all cost of labour, lead, lift etc complete.
Providing special type trussels forP&T,road crossing during stringing work with casurina props so as to avoid accident and dameges to conductor and earth wire on both side of crossing including cost of all materials,labour, lead lift etc. Complete in all respects.
Labour charges for Dismantling of existing 3 wire leopard conductor and devlouted to store including cost of all materials,T &Ps lead, lift ,etc., complete. (under LC )
Labour charges for Dismantling of existing 1 earth wire and devlouted to store including cost of all materials,T &Ps lead, lift ,etc.,complete. (under LC )
Lowering & dismantling of suspension insulators ( 7 units ) with fitting and devlouted to store including cost of all major & minor T & P with all lead,lift etc complete .( UnderLC)
Lowering & dismantling of tension insulators ( 8 units ) with fitting and devlouted to store including cost of all major & minor T & P with all lead,lift etc complete .( UnderLC)
Labour charges for Dismantling the existing tower in complete member by member to devlouted to store including cost of all materials,T &Ps lead, lift ,etc., complete.including cost of all materials,T &Ps lead, lift ,etc., complete.( under LC)
Applicable GST 18%
ZIYAVUDEEN
Haribalakrishnan
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .