Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-Finance | L1 | Accepted-Finance Rate as per BSR |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
9 May 2026, 1:00 pmClosed
VDO GP Pipera
GP Pipera
Atal Gyaan Kendra Pipera
2026_PRD_555772_1
13-15/2026/Pipera
Open Tender
Miscellaneous Works
Percentage
90 days
as per tender document
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Sarpanch GP Pipera, MD RISL
₹16,000
Yes
11 May 2026
2 May 2026
9 May 2026
2 May 2026
9 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | work detial | - | - | - | - |
| 1.01 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus
soil with in a lead of 50m. | 27.82 | cum | 178.46 | ₹4,964.76 |
| 1.02 | Cement concrete in foundation and plinth with stone ballast size 40mm including curing and compaction etc in 1:4:8 mix | 4.64 | cum | 3,629.72 | ₹16,841.9 |
| 1.03 | Brick work in foundation and plinth using bricks of class designation-75 in CM 1:6 | 53.56 | cum | 4,346.06 | ₹2,32,774.97 |
| 1.04 | Damp proof course with RCC 1:1.5:3 mix | 2.4 | cum | 5,823.04 | ₹13,975.3 |
| 1.05 | Brick work in super structure using bricks of class
designation-75 in CM 1:6 | 29.13 | cum | 248.61 | ₹7,242.01 |
| 1.06 | Reinforced cement concrete work including curing compaction, finishing with rendering in cement sand mortar 1:3 and making good and joints excluding cost of centering, shuttering and reinforcement in
1:1.5:3 (1cement: 1.5course sand: 3- graded stone aggregate 20mm nominal | 11.84 | Cum | 5,823.04 | ₹68,944.79 |
| 1.07 | Providing and fabricating reinforcement for RCC work including straightening, cutting, bending,placing in position and binding (including cost of binding wire) in foundation and super structure up to 4.5m height above plinth level hot rolled deformed (IS: 1139) cold twisted (IS: 1786) bars | 1,301.87 | Kg | 97.94 | ₹1,27,505.15 |
| 1.08 | Centering and shuttering with plywood or steel sheets including strutting, propping, bracing both ways with wooden members and removal of from work | 83.58 | Sqm | 319.04 | ₹26,665.36 |
| 1.09 | P & L Cement concrete on roof | 48.8 | Sqm | 861.17 | ₹42,025.1 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_989771.xls
BOQ • 0.26 MB
committeePsLks.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .