Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L1 | Accepted-Finance Accept |
| 2 | L2₹1.2 Cr+₹10.5 L (9.80%)Accepted-Finance | ₹1.2 Cr+₹10.5 L (9.80%) | L2 | Accepted-Finance Accept |
| 3 | L3₹1.2 Cr+₹13.2 L (12.3%)Accepted-Finance | ₹1.2 Cr+₹13.2 L (12.3%) | L3 | Accepted-Finance Accept |
| 4 | L4₹1.2 Cr+₹16.3 L (15.2%)Accepted-Finance | ₹1.2 Cr+₹16.3 L (15.2%) | L4 | Accepted-Finance Accept |
Tender Value
Refer Docs
EMD Value
₹99,000
Closing Date
20 Oct 2023, 2:00 pmClosed
Superintending Engineer
Office of the S.E., EWC, Meerut
For repairing of 10 KVA to 400 KVA damaged T/F at Electricity workshop, Yamunapuram and Hydel Colony, Buandshahr
2023_PVVNL_842209_1
E-Tender No. 45/EWC-MRT/2023-24
Open Tender
Electrical Works
Item Rate
365 days
Office of the S.E., EWC
Attached in DOC
3 documents required · 3 mandatory
₹3,540
Pay on A/C of the EE, EWD, Meerut
₹99,000
31 Oct 2023
22 Sept 2023
20 Oct 2023
22 Sept 2023
20 Oct 2023
22 Sept 2023
Shifting, dragging and stacking of damaged T/fs to be repaired in the workshop at proper place in cutting yard & pre-checking/ physical inspection, testing of transformer before dismantling i.e. Megger Test (if OK) then HV Test (if OK) then No-Load & Load Losses Tests as per instructions of Junior Engineer in charge. (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
(vi) 250 KVA
(vii) 400 KVA
Cutting of sealed T/fs top cover/ opening of nut and bolt of damaged t/f cover plate, de- tanking of core coil assembly dismantling of HV&LV Coils and other accessories, draining of T/f oil in sump well and weighing of scraps and shifting of all scrap to the store of JE in charge. (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
(vi) 250 KVA
(vii) 400 KVA
Dismantling of core stamping and its cleaning of dust and dirt. (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
(vi) 250 KVA
(vii) 400 KVA
Assembly of core coils and fitting of other accessories requiring replacement such as press board support spacers and tapping etc. and also cutting of insulation required for coil assembly. (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
(vi) 250 KVA
(vii) 400 KVA
Dragging of T/f Tank to washing Zone its cleaning by jet pump and washing by caustic soda shifting to open space for drying Providing primer of red oxide on the inner and outer side of tank and painting inner side of T/fs including core channel and tie rod / core rods with heat proof zinc chromate paint and out side with two coats of synthetic grey enamel paint. The paint should be of Asian/Nerolec/Burger/ Dulux/British make only. Writing of PUC/ Unique No. of transformer readable paint color with the help of stencils design. (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
(vi) 250 KVA
(vii) 400 KVA
Making of new HV coil from new wire / strip as per design of respective T/F (Complete Job) (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
(vi) 250 KVA
(vii) 400 KVA
Making of new LV coil from new wire / strip as per design of respective T/F (Complete Job) (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
(vi) 250 KVA
(vii) 400 KVA
Complete the core and coil assembly(CCA) by fitting HV & LV coils required insulating material and shifting it to oven for de-moisture (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
(vi) 250 KVA
(vii) 400 KVA
Tanking of the complete core and coil assembly (CCA) in to the painted tank safely, filling of reclaimed / centrifuged/ fresh oil fitting of all accessories. (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
(vi) 250 KVA
(vii) 400 KVA
Welding/ Tightening of nut and bolts of top cover of repaired T/f by electric welding filling Gap etc. properly including denting of tank if necessary and welding of MS plate 100x50x3 mm thick on the out side of the T/Fs contain unique no., capacity, name of the workshop etc. at proper place . (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
(vi) 250 KVA
(vii) 400 KVA
Dragging the Repaired T/f to the testing zone for final testing with necessary record and after testing it should be re dragged / stacked at despatch area. (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
(vi) 250 KVA
(vii) 400 KVA
General Cleaning of T&P / Machinery and stacking of material at suitable place( at Elect. WorkShop Yamunapuram, Bulandshahr)
General Cleaning of T&P / Machinery and stacking of material at suitable place (at Elect. WorkShop Hydel Colony, Bulandshahr)
General clearness of store testing room, workshop floor, oven area, generator room, in cutting area, tanking area, assembly area, painting area by wiping, booming and wooden dust properly to keep floor clean by engaging proper man power for cleaning works. As required for cleaning works (at Elect. WorkShop Yamuna Puram, Bulandshahr)
General clearness of store testing room, workshop floor, oven area, generator room, in cutting area, tanking area, assembly area, painting area by wiping, booming and wooden dust properly to keep floor clean by engaging proper man power for cleaning works. As required for cleaning works (at Elect. WorkShop Hydel Colony, Bulandshahr)
SHRI SAI SARTHAK TRADERS
DURGA ELECTRICALS
M/S SUPER ENGINEERING TRADERS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .