Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5 LAccepted-AOC | 1 | Accepted-AOC Generally found in order |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
7 Feb 2022, 2:00 pmClosed
SE/TEDC/TIN
Anna building maharajanagar Tirunelveli
Execution of maintenance contract for Extension of supply works and HT LT lines maintenance works except Agriculture services and natural calamities works in Tenkasi Division Tirunelveli EDC
2022_EB_220432_1
ETW18/21-22
Open Tender
Electrical and Maintenance Works
Works
180 days
Tirunelveli
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,000
Yes
23 Feb 2022
22 Jan 2022
8 Feb 2022
22 Jan 2022
7 Feb 2022
22 Jan 2022
Amount
Normal ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles
Normal ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles
Rocky ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles
Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles
Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles
Normal ground- Erection of 9M & 9.14M poles
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles
Rocky ground- Erection of 9M & 9.14M poles
Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36' length RS Joists
Normal ground- Erection of above 9.14M poles & 36' length RS Joists
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36' length RS Joists
Rocky ground- Erection of above 9.14M poles & 36' length RS Joists
Transporting of poles from road side to pole pit - 7.32m, 7.5m, 8m, 8.23m RCC pole
Transporting of poles from road side to pole pit - 9m, 9.14m RCC/PSC pole
Transporting of poles from road side to pole pit - RSJ 36' Pole
Transporting of poles from road side to pole pit - RSJ 42' and above
Loading and Unloading of poles - 7.32m, 7.5m, 8m, 8.23m RCC pole
Loading and Unloading of poles - 9m, 9.14m RCC/PSC pole
Loading and Unloading of poles - RS Joists, tubular & rail pole (above 9.14m)
Concreting of poles as per Board Standards (2'*2'*5'). The material such as cement, sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.)
Coping of pole (0.6m*0.6m*0.35m)
Concreting of stay (o.3m * 0.3m * 1.5m) including materials except cement
Coil earthing per pole & pole earthing
Normal ground- Excavation of stay set (1.00m * 0.5m*1.5m) with transporting of materials to site
Normal ground- Erection of stay set
Rocky ground- Excavation of stay set (1.00m * 0.5m*1.5m) with transporting of materials to site
Rocky ground- Erection of stay set
Fixing of V & Channel cross arm 5.5' including transporting of materials from road side to site
Fixing of V & Channel cross arm 4.5' including transporting of materials from road side to site
Fixing of V & Channel cross arm 3.5' including transporting of materials from road side to site
Fixing of LT 3Phase cross arm including transporting of materials from road side to site
Fixing of LT 1Phase cross arm including transporting of materials from road side to site
Fixing of LT 1Phase cross arm including transporting of materials from road side to site
Fixing of HT LT TI fitting including transporting of materials from road side to site
Erection of HT Side arm with stud including transporting of materials from road side to site
Erection of LT Side arm with stud including transporting of materials from road side to site
Fixing of insulator (per location) including transporting of materials from road side to site
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire)
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire)
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR (1Span/Wire)
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For Dog Conductor (1Span/Wire)
For HT line clear works for For 7/2.59 ACSR (1Span/Wire)
For HT line clear works for For 7/3.35 ACSR (1Span/Wire)
For HT line clear works for For 7/4.09 ACSR (1Span/Wire)
For HT line clear works for ForDog conductor (1Span/Wire)
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/4.09 ACSR
For LT line clear works for For 7/2.59 ACSR (1Span/Wire)
For LT line clear works for For 7/3.35 ACSR (1Span/Wire)
For LT line clear works for For 7/4.09 ACSR (1Span/Wire)
Guarding per span length- Spilt Neutral Guarding
Guarding per span length- Flat Guarding (2 wires)
Guarding per span length- Flat Guarding (4 wires)
Guarding per span length- Flat Guarding (6 wires)
Guarding per span length- Cradle Guarding (Fixing of ' X' arm Lacing )
Guarding per span length- Fixing of one earthing device with stud
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,
Dismantling of poles without concrete in damaged condition including grill separation etc.,
Providing jumpering at cut point
complete replacement of worn out earth wire per structure
Tree clearence in HT or LT location- For ordy. Tree clearence and Throng bushes & trees 400/head/day
Tree clearence in HT or LT location- For coconut trees and Palmrah trees 500/head/day
Set right of leaning of HT pole or LT pole including X arms, TI fittings
Earthing system-Excavation of 1 No. earth pits Excavation of earth wire trench and paving of earth wire, Erection of 1 No. earth pipe and giving earth connection, Earthing of all metal parts, for tapping structure.
Earthing system-Mason works for earth pit (including material)
Fixing of Guarding X arm
Fixing of Tapping channel X arm
Fixing of LT shackle
Fixing of 11 KV Strain Disc
Maintenance of AB switch-Replacement of male and female one number contact and PTinsulator
Maintenance of AB switch-Cleaning of contacts, lubrication and checking of operating pipe movments
Maintenance of Distribution Transformer-Cleaning of HT/LT Bushings, Oil level checking , Silical gel replacement, Terminal tightness checking, Cleaning of DT yard, earth pit watering and maintenance of open types etc.,
Maintenance of Distribution Transformer-Providing of 'U' jumpering
Dismantling of other line materials
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .