Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC | L1 | Accepted-AOC Quoted Lowest rate and
Executed Agreement on 29.09.2022 after negotiation | |
| 2 | L2₹9.3 L+₹49,736.49 (5.68%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
28 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector (Dev)/Project Director, DRDA
O/O AC (D) / PD DRDA Thoothukudi
Thoothukudi Dt AGAMT II 21-22 PkgNoTN/TUT-17/22-23 Clean and Green villages - In Agaram, Kottarakurichi, Pazhayakayal, Umarikkadu, Valavallan and Vellur Village Panchayats in Srivaikundam Block
2022_RDTN_237656_34
AC(D)/PD,DRDA,Tuty,Lr.No A3/2573/2022 dt.20.06.202
Open Tender
Civil Works
Item Rate
180 days
Thoothukudi District
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹12,000
O/O AC (D) / PD DRDA Thoothukudi
24 Nov 2022
8 Jul 2022
28 Jul 2022
8 Jul 2022
28 Jul 2022
8 Jul 2022
8 Jul 2022
Amount
Providing Fencing Green Net Shade Arrangement to the Moringa Nursery to be created under MGNREGS 2022-2023 at Agaram in Agaram Panchayat in Srivaikundam Panchayat Union
Fencing Arrangements
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring,
CEMENT CONCRETE 1:3:6 mix using 40mm metal including cost and conveyanc etc., complete complying with standard specification.
supply and delivery of cut stone piller of size 0.15 x 0.15 x 2.10m including cost and conveyance of all labour charges etc and complete
supply of 2"x2" square chain link including cost and conveyance of all labour charges etc and complete
Green Netshed for Nursery
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply and delivery of GI 50mm Pipe including cost and conveyance of all labour charges etc and complete
Supply of 25x25mm Tublur square bar including cost and conveyance of all labour charges etc and complete
Making new truss using new mateials of 'L' angle of size 45x45x3mm including cutting the angle to the required length drilling holes wherever necessary for fixing the pipe purlins, rafters and fixing the post etc., complete.
Water Supply arrangement
Earth work excavation for Narrow trench in all soils such as red earth, hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel, hard rock not requiring blasting ete complete for pipe laying
Supply and delivery of 63mm PVC 4 ksc pipe including cost and conveyance of all labour charges etc complete
Lowering PVC rigid pipes and specials into trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.
Refilling the excavated earth into the trench after laying pipe line including all labour charges etc complete
Supply and delivery of 20mm GI Pipe including cost and conveyance of all labour charges etc and complete
Supply and delivery of 63 mm Saddle including cost and conveyance of all labour charges etc and complete
Supply and delivery of GI Elbow 20mm including cost and conveyance of all labour charges etc and complete
Supply and delivery of Tap SS/ Brass including cost and conveyance of all labour charges etc and complete
Providing Fencing Green Net Shade Arrangement to the Moringa Nursery to be created under MGNREGS 2022-2023 at Laskhmipuram in Kottarakuruchi Panchayat in Srivaikundam Panchayat Union
Fencing Arrangements
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring,
CEMENT CONCRETE 1:3:6 mix using 40mm metal including cost and conveyanc etc., complete complying with standard specification.
supply and delivery of cut stone piller of size 0.15 x 0.15 x 2.10m including cost and conveyance of all labour charges etc and complete
supply of 2"x2" square chain link including cost and conveyance of all labour charges etc and complete
Green Netshed for Nursery
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply and delivery of GI 50mm Pipe including cost and conveyance of all labour charges etc and complete
Supply of 25x25mm Tublur square bar including cost and conveyance of all labour charges etc and complete
Making new truss using new mateials of 'L' angle of size 45x45x3mm including cutting the angle to the required length drilling holes wherever necessary for fixing the pipe purlins, rafters and fixing the post etc., complete.
Water Supply arrangement
Earth work excavation for Narrow trench in all soils such as red earth, hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel, hard rock not requiring blasting ete complete for pipe laying
Supply and delivery of 63mm PVC 4 ksc pipe including cost and conveyance of all labour charges etc complete
Lowering PVC rigid pipes and specials into trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.
Refilling the excavated earth into the trench after laying pipe line including all labour charges etc complete
Supply and delivery of 20mm GI Pipe including cost and conveyance of all labour charges etc and complete
Supply and delivery of 63 mm Saddle including cost and conveyance of all labour charges etc and complete
Supply and delivery of GI Elbow 20mm including cost and conveyance of all labour charges etc and complete
Supply and delivery of Tap SS/ Brass including cost and conveyance of all labour charges etc and complete
Providing Fencing Green Net Shade Arrangement to the Moringa Nursery to be created under MGNREGS 2022-2023 at Palayakayal in Palayakayal Panchayat in Srivaikundam Panchayat Union
Fencing Arrangements
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring,
CEMENT CONCRETE 1:3:6 mix using 40mm metal including cost and conveyanc etc., complete complying with standard specification.
supply and delivery of cut stone piller of size 0.15 x 0.15 x 2.10m including cost and conveyance of all labour charges etc and complete
supply of 2"x2" square chain link including cost and conveyance of all labour charges etc and complete
Green Netshed for Nursery
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply and delivery of GI 50mm Pipe including cost and conveyance of all labour charges etc and complete
Supply of 25x25mm Tublur square bar including cost and conveyance of all labour charges etc and complete
Making new truss using new mateials of 'L' angle of size 45x45x3mm including cutting the angle to the required length drilling holes wherever necessary for fixing the pipe purlins, rafters and fixing the post etc., complete.
Water Supply arrangement
Earth work excavation for Narrow trench in all soils such as red earth, hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel, hard rock not requiring blasting ete complete for pipe laying
Supply and delivery of 63mm PVC 4 ksc pipe including cost and conveyance of all labour charges etc complete
Lowering PVC rigid pipes and specials into trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.
Refilling the excavated earth into the trench after laying pipe line including all labour charges etc complete
Supply and delivery of 20mm GI Pipe including cost and conveyance of all labour charges etc and complete
Supply and delivery of 63 mm Saddle including cost and conveyance of all labour charges etc and complete
Supply and delivery of GI Elbow 20mm including cost and conveyance of all labour charges etc and complete
Supply and delivery of Tap SS/ Brass including cost and conveyance of all labour charges etc and complete
Providing Fencing Green Net Shade and Water Supply Arrangement to the Nursery to be created under MGNREGS 2022-2023 at Umarikadu in Umarikadu Panchayat in Srivaikundam Panchayat Union
Fencing Arrangements
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring,
CEMENT CONCRETE 1:3:6 mix using 40mm metal including cost and conveyanc etc., complete complying with standard specification.
supply and delivery of cut stone piller of size 0.15 x 0.15 x 2.10m including cost and conveyance of all labour charges etc and complete
supply of 2"x2" square chain link including cost and conveyance of all labour charges etc and complete
Green Netshed for Nursery
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply and delivery of GI 50mm Pipe including cost and conveyance of all labour charges etc and complete
Supply of 25x25mm Tublur square bar including cost and conveyance of all labour charges etc and complete
Making new truss using new mateials of 'L' angle of size 45x45x3mm including cutting the angle to the required length drilling holes wherever necessary for fixing the pipe purlins, rafters and fixing the post etc., complete.
Water Supply arrangement
Earth work excavation for Narrow trench in all soils such as red earth, hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel, hard rock not requiring blasting ete complete for pipe laying
Supply and delivery of 63mm PVC 4 ksc pipe including cost and conveyance of all labour charges etc complete
Lowering PVC rigid pipes and specials into trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.
Refilling the excavated earth into the trench after laying pipe line including all labour charges etc complete
Supply and delivery of 20mm GI Pipe including cost and conveyance of all labour charges etc and complete
Supply and delivery of 63 mm Saddle including cost and conveyance of all labour charges etc and complete
Supply and delivery of GI Elbow 20mm including cost and conveyance of all labour charges etc and complete
Supply and delivery of Tap SS/ Brass including cost and conveyance of all labour charges etc and complete
Providing Fencing Green Net Shade Arrangement to the Nursery to be created under MGNREGS 2022-2023 at South Valavallan in Valavallan Panchayat in Srivaikundam Panchayat Union
Fencing Arrangements
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring,
CEMENT CONCRETE 1:3:6 mix using 40mm metal including cost and conveyanc etc., complete complying with standard specification.
supply and delivery of cut stone piller of size 0.15 x 0.15 x 2.10m including cost and conveyance of all labour charges etc and complete
supply of 2"x2" square chain link including cost and conveyance of all labour charges etc and complete
Green Netshed for Nursery
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply and delivery of GI 50mm Pipe including cost and conveyance of all labour charges etc and complete
Supply of 25x25mm Tublur square bar including cost and conveyance of all labour charges etc and complete
Making new truss using new mateials of 'L' angle of size 45x45x3mm including cutting the angle to the required length drilling holes wherever necessary for fixing the pipe purlins, rafters and fixing the post etc., complete.
Water Supply arrangement
Earth work excavation for Narrow trench in all soils such as red earth, hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel, hard rock not requiring blasting ete complete for pipe laying
Supply and delivery of 63mm PVC 4 ksc pipe including cost and conveyance of all labour charges etc complete
Lowering PVC rigid pipes and specials into trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.
Refilling the excavated earth into the trench after laying pipe line including all labour charges etc complete
Supply and delivery of 20mm GI Pipe including cost and conveyance of all labour charges etc and complete
Supply and delivery of 63 mm Saddle including cost and conveyance of all labour charges etc and complete
Supply and delivery of GI Elbow 20mm including cost and conveyance of all labour charges etc and complete
Supply and delivery of Tap SS/ Brass including cost and conveyance of all labour charges etc and complete
Providing Fencing Green Net Shade to the Horticulture Nursery to be created under MGNREGS 2022-2023 at Kettiyammalpuram in Vellur Panchayat in Srivaikundam Panchayat Union
Fencing Arrangements
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring,
CEMENT CONCRETE 1:3:6 mix using 40mm metal including cost and conveyanc etc., complete complying with standard specification.
supply and delivery of cut stone piller of size 0.15 x 0.15 x 2.10m including cost and conveyance of all labour charges etc and complete
supply of 2"x2" square chain link including cost and conveyance of all labour charges etc and complete
Green Netshed for Nursery
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply and delivery of GI 50mm Pipe including cost and conveyance of all labour charges etc and complete
Supply of 25x25mm Tublur square bar including cost and conveyance of all labour charges etc and complete
Making new truss using new mateials of 'L' angle of size 45x45x3mm including cutting the angle to the required length drilling holes wherever necessary for fixing the pipe purlins, rafters and fixing the post etc., complete.
Water Supply arrangement
Earth work excavation for Narrow trench in all soils such as red earth, hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel, hard rock not requiring blasting ete complete for pipe laying
Supply and delivery of 63mm PVC 4 ksc pipe including cost and conveyance of all labour charges etc complete
Lowering PVC rigid pipes and specials into trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.
Refilling the excavated earth into the trench after laying pipe line including all labour charges etc complete
Supply and delivery of 20mm GI Pipe including cost and conveyance of all labour charges etc and complete
Supply and delivery of 63 mm Saddle including cost and conveyance of all labour charges etc and complete
Supply and delivery of GI Elbow 20mm including cost and conveyance of all labour charges etc and complete
Supply and delivery of Tap SS/ Brass including cost and conveyance of all labour charges etc and complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VIDHYASAGAR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .