Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.1 CrAccepted-AOC PLOT NO 203 ROAD NO 5 LANE 7 MAHADEV NAGAR JHARPADA BHUBANESWAR 751006 | KHORDHA | ODISHA | 751006 | L1 | Accepted-AOC QUALIFIED BIDDER | |
| 2 | L1₹16.1 CrRejected-Finance | L1 | Rejected-Finance DUE TO L1 BIDER LOWEST TURNOVER | |
| 3 | L2₹9.6 Cr−₹6.5 Cr (40.4%)Rejected-Finance | L2 | Rejected-Finance DUE TO L2 BIDDER | |
| 4 | Rejected-Technical | - | Rejected-Technical Inadequate Turnover as per DTCN Cl. 12 and 110(i) | |
| 5 | Rejected-Technical VIP LANE PO BLOCK KOKSARA DIST KALAHANDI ODISHA PIN 766019 | KOKSARA | KALAHANDI | ODISHA | 766019 | - | Rejected-Technical Absent in the Point of Presentation as per DTCN Cl.110(m) |
Tender Value
₹17.9 Cr
EMD Value
₹17.9 L
Closing Date
26 Jun 2025, 5:00 pmClosed
CHIEF ENGINEER OPHWC
CHIEF ENGINEER OPHWC
Building Work
2025_OSPHW_114352_2
05/OPHWC/2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
450 days
Kalahandi
Please refer Tender documents
3 documents required · 3 mandatory
₹11,800
₹17.9 L
Yes
3 Sept 2025
11 Jun 2025
30 Jun 2025
11 Jun 2025
26 Jun 2025
11 Jun 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CVL | - | - | - | - |
| 2 | 50000000
Earth work in hard soil or gravelly soil within 50minitial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m depth.
Ground Floor | 598.68 | CUM | 268.19 | ₹1,60,559.99 |
| 3 | 50000003
Providing and laying plain cement concrete 1:4:8 (1 cement: 4 sand: 8 stone aggregate 40mm nominal size) as levelling course in foundation and plinth etc. including tempering, curing, shuttering etc. complete at all depth and height.
Ground Floor | 100.65 | CUM | 5,101.26 | ₹5,13,441.82 |
| 4 | 50000017
Supplying of filling sand in foundation and plinth including watering, ramming, consolidating and dressing, labours, tools all complete.
Ground Floor | 519.86 | CUM | 574.04 | ₹2,98,420.43 |
| 5 | 50000020
12mm thick cement plaster in cement mortar 1:6 (1cement:6sand) including necessary scaffolding curing etc. all complete at all depth and height.
Ground Floor | 1,058.97 | SQM | 183.87 | ₹1,94,712.81 |
| 6 | First Floor | 1,321.38 | SQM | 191.59 | ₹2,53,163.19 |
| 7 | Second Floor | 1,321.38 | SQM | 199.69 | ₹2,63,866.37 |
| 8 | Third Floor | 1,321.38 | SQM | 208.19 | ₹2,75,098.1 |
| 9 | Forth Floor | 236.51 | SQM | 217.11 | ₹51,348.69 |
| 10 | 50000021
6mm thick cement plaster in cement mortar 1:4 (1 cement:4 sand) to R.C.C surfaces finished smooth including closed deep chipping and slurry treatment with necessary scaffolding, curing etc. all complete at all depth and height for inside and outside surfaces.
Ground Floor | 897.75 | SQM | 206.96 | ₹1,85,798.34 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 1.41 MB
BOQ.xls
BOQ • 1.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .