| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance R O RAMBAN GARHI | -41.30% | ₹5.9 L | L1 | Admitted-Finance |
| 2 | L2₹6.1 LAdmitted-Finance | -38.60% | ₹6.1 L | L2 | Admitted-Finance |
| 3 | L3₹6.4 LAdmitted-Finance | -36.00% | ₹6.4 L | L3 | Admitted-Finance |
| 4 | L4₹6.6 LAdmitted-Finance | -33.75% | ₹6.6 L | L4 | Admitted-Finance |
| 5 | L5₹6.9 LAdmitted-Finance | -31.01% | ₹6.9 L | L5 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹30,000
Closing Date
2 Mar 2026, 1:30 pmClosed
DFO Kishtwar
Forest Complex Sarkoot Kishtwar
BOQ
2026_FD_304427_1
45 of 2025
Open Tender
Agricultural or Forestry
60 days
Nagseni Range
SBD
2 documents required · 2 mandatory
₹600
DFO Kishtwar
₹30,000
21 Mar 2026
25 Feb 2026
5 Mar 2026
25 Feb 2026
2 Mar 2026
25 Feb 2026
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : 80% Hard Soil
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : 20% Ordinary Rock
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 meter beyond 1 m from cutting edge 80% Hard Soil
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 meter beyond 1 m from cutting edge 20% Ordinary Rock
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size)
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah
Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah
Filling of Stones including Dumping of stones.Supply of stones over conty lever as passage
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Qty wide item no -7
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand :6 graded stone aggregate 40 mm nominal size)
Providing and laying damp-proof course 5Crnm thick with cement concrete 1:2:4 (1 cement : 2 co.:Hse sand 4 graded stone aggregate 20mm nominal size i Nallah
Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 45 ft complete job as per directed by the site incharge Engage 3 Carpenter for 30 days for making Bridge 45 ft span
Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 45 ft complete job as per directed by the site incharge Engage 4 Labour for 30 days for making Bridge 45 ft span
Providing and fixing of Nails
Strctural steel work in single section fixed without connecting plate including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Carriage of materials from source to site of work by M.T. Sand av. 35 KM and HL 1000 mtr
Carriage of materials from source to site of work by M.T. Bajri av. 35 KM and HL 1000 mtr
Carriage of materials from source to site of work by M.T. Stone av.500 Mtr HL
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_988877.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid