| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | L1 | Accepted-AOC L1 Lowest | |
| 2 | L2₹7.2 L+₹1.1 L (18.7%)Rejected-Finance | L2 | Rejected-Finance L2 Lowest | |
| 3 | Rejected-Technical RAHIMPUR VILLAGE BIJNOR DISTRICT BIJNOR | BIJNOR | UTTAR PRADESH | 246701 | - | Rejected-Technical Lot No 9 ke Stamp paper Use in Lot No. 10 | |
| 4 | Rejected-Technical 1098 BAZAR KHOHAL GORAKHPUR UTTAR PRADESH | - | Rejected-Technical Labour Department certificate valid till 03/2024 |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
19 Aug 2024, 3:00 pmClosed
EE EGCCDiv.6 Najibabad
EE EGCCDiv.6 Najibabad
Construction of V.R.B. at Km. 10.900 of Jamalpur Distributary.
2024_UPIDC_945647_10
02/EE/2024-25
Open Tender
Civil Works - Canal
Item Wise
180 days
Dhampur
Please refer tender documents
2 documents required · 2 mandatory
₹267
₹16,000
25 Oct 2024
13 Aug 2024
20 Aug 2024
13 Aug 2024
19 Aug 2024
13 Aug 2024
13 Aug 2024 - 19 Aug 2024
Amount
Earthwork in excavation in ordinary soil including lift upto1.50M & lead upto 30 M & including Back filling, Watering, Ramming of excavated earth, T&P etc. complete.
Laying C.C 1:3:6 in foundation using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum.
Brick work (M-105 and Above) in 1:4 cement & sand mortar including cost of all Material, Labour, T&P etc complete. (Per Cum)
Ordinary Centering & shuttering of Plywood or steel for RCC Work
Laying C.C 1:1:2 using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum.
Laying C.C 1:1.5:3 using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum.
Supply & Laying of reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge.
Cement Pointing (Struck deep) in 1:2 C:M on brick masonry i/c cost of all material, labour, T&P etc complete (Per SqM)
S/F 60 cm. long 50 mm dia P.V.C. Pipe Spout including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge.
Earth work in fiiling for Making ramp including all costs of T&P material required for proper completion of work as directed by Engineer-in -charge.
Earthwork in filling for Making road diversion including all costs of T&P material required for proper completion of work as directed Engineer-in -charge.
Providing & laying brick on edge soling (kharanja) including all costs of T&P material required for proper completion of work as directed Engineer-in -charge.
Finishing wall with two coat of water proof cement paint Weather coat of approved quality on new surface with this paint to give an even shade including supply of all marerials, labour, Tools & plant etc. required for proper completion of the work.
Supply & Fixing of Wheelguard stone including cost of all material ,labour and T&P etc. Complete
SANDEEP KUMAR SINGHAL
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .