| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.8 LAccepted-AOC PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹33.6 L+₹2.8 L (8.96%)Rejected-Finance | L2 | Rejected-Finance NOT LOWEST | |
| 3 | L3₹34.0 L+₹3.2 L (10.2%)Rejected-Finance COLABA MUMBAI | L3 | Rejected-Finance NOT LOWEST | |
| 4 | L4₹35.3 L+₹4.5 L (14.6%)Rejected-Finance COLABA MUMBAI | YAVATMAL | MAHARASHTRA | 445001 | L4 | Rejected-Finance NOT LOWEST | |
| 5 | L5₹35.5 L+₹4.7 L (15.2%)Rejected-Finance COLABA MUMBAI | L5 | Rejected-Finance NOT LOWEST |
Tender Value
Refer Docs
EMD Value
₹64,000
Closing Date
26 Jun 2021, 6:00 pmClosed
MAJ VIKAS KUMAR SRIVASTAVA, GE
GARRISON ENGINEER DAMAN TAT RAKSHAK VIHAR DALWADA NANI DAMAN POST DAMAN (UT) PIN 396210
OUTSOURCING OF SERVICE FOR MANNING AND OPERATION AND REPAIR/MAINT OF ELECTRICALLY OPERATED LIFTS AT POWAI AND WORLI UNDER GE DAMAN
2021_MES_439306_2
8545/E8
Open Tender
Civil Works
Item Rate
330 days
GARRISON ENGINEER DAMAN
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GARRISON ENGINEER DAMAN
₹64,000
10 Jul 2021
5 Jun 2021
28 Jun 2021
5 Jun 2021
26 Jun 2021
19 Jun 2021
Amount
Outsourcing of services for Manning and operation of electrically operated lifts (G+14) of capacity 08 Passengers at Building 12 CORA Powai including of lift car, machine room, control panel. Taking care of entire lift from any pilferage theft and damage maintaining of daily records of lift. In case of emergency or failure of power supply the attendant will carry out rescue operations by adopting necessary safety precuations by deploying lift attandant - 01 No in each shift of 08 hours duration required in 02 shifts in a day in all days including Sundays & Holidays at Tat Rakshak Vihar Cora Powai comprising of the following shifts complete all as specified and directed Shift Timings:- (a) First Shift : 0600 hrs to 1400 hrs. (b) Second Shift : 1400 hrs to 2200 hrs.
Outsourcing of services for Manning and operation of electrically operated lifts (G + 7) of capacity 08 Passengers at Building 16 at TRV Powai including of lift car, machine room, control panel. Taking care of entire lift from any pilferage theft and damage maintaining of daily records of lift. In case of emergency or failure of power supply the attendant will carry out rescue operations by adopting necessary safety precuations by deploying lift attandant - 01 No in each shift of 08 hours duration required in 02 shifts in a day in all days including Sundays & Holidays at TatRakshak Vihar powai comprising of the following shifts complete all as specified and directed Shift Timings:- (a) First Shift : 0600 hrs to 1400 hrs. (b) Second Shift : 1400 hrs to 2200 hrs.
Outsourcing of services for Manning and operation of electrically operated lifts (G + 7) of capacity 08 Passengers at Building 19 at TRV Powai including of lift car, machine room, control panel. Taking care of entire lift from any pilferage theft and damage maintaining of daily records of lift. In case of emergency or failure of power supply the attendant will carry out rescue operations by adopting necessary safety precuations by deploying lift attandant - 01 No in each shift of 08 hours duration required in 02 shifts in a day in all days including Sundays & Holidays at TatRakshak Vihar powai comprising of the following shifts complete all as specified and directed Shift Timings:- (a) First Shift : 0600 hrs to 1400 hrs. (b) Second Shift : 1400 hrs to 2200 hrs.
Outsourcing of services for Manning and operation of electrically operated lifts (G + 22) of capacity 08 Passengers at TUNGWA TRV POWAI Including of lift car, machine room, control panel. Taking care of entire lift from any pilferage theft and damage maintaining of daily records of lift. In case of emergency or failure of power supply the attendant will carry out rescue operations by adopting necessary safety precuations by deploying lift attandant - 01 No in each shift of 08 hours duration required in 02 shifts in a day in all days including Sundays & Holidays at Tat Rakshak Vihar Tungwa Powai comprising of the following shifts complete all as specified and directed Shift Timings:- (a) First Shift : 0600 hrs to 1400 hrs. (b) Second Shift : 1400 hrs to 2200 hrs.
Outsourcing of services for Manning and operation of electrically operated lifts (G + 3) of capacity 08 Passengers at RHQ Worli including of lift car, machine room, control panel. Taking care of entire lift from any pilferage theft and damage maintaining of daily records of lift. In case of emergency or failure of power supply the attendant will carry out rescue operations by adopting necessary safety precuations by deploying lift attandant - 01 No in each shift of 08 hours duration required in 02 shifts in a day in all days including Sundays & Holidays comprising of the following shifts complete all as specified and directed Shift Timings:- (a) First Shift : 0600 hrs to 1400 hrs. (b) Second Shift : 1400 hrs to 2200 hrs. NOTES FOR ITEM Nos 01 to 05 :- (a) In case of requirement Lift Attended / Electrician provided for one area shall be utilised in other areas at the descretion of department without any extra cost to the department (b) Uniform, expendable stores like cotton waste, greasing, cleaning, materials, tools, insulation tapes, stationery, safety devices, transportation etc shall be provided by the contractor and same is deemed to be included in contractor's quoted rates. (c) Rate quoted shall include for reliever duty/ leave/ reserve OFF for the personal employed. (d) The tradesmen provided by the Contractor shall have minimum ITI qualification from the state/central Govt recognised institute with 2 years experience. (e) The contractor shall submit ID Proof, residential proof, bank account details to department and obtain approval of GE before employing a person as Electrician/FGM/Pipe Fitter etc. (f) Payment to lift operator/rescue operator shall be done by crossed cheque only duly ensuring the minimum fare wages Act in vogue. (g) In case the rate quoted is less than the minimum fair wages as fixed by state Govt and central Govt, the Acceptaing officer shall reserve the rights to accept / reject the offer. (h) The contractor shall obtain and submit insurance policy of each trademen employeed by him. (j) Incase of non deployement of operator on duty , non rectification of defects / cleaning of installation , non maintenence of log sheet and other record in the installation on particular day , it shall be considered that operator are absent on duty and recovery at double cost of rate quated by contractor shall be deducted by the Engineer in Charge from the dues without any notice to the firm . (k) The contractor shall obtain and submit lift safety inspection report for each lift from Govt lift inspector / any third party Govt accredited agency of Maharastra State once in the currency of the contract period. Cost shall be deemed to be included in the quoted rate. The contractor's quoted rates against the Item No 1 to5 items shall also be deemed to include the following elements : (l)Minimum wages of skilled (Fitter General Mechanic/Lift attendant /Operator)as per latest prevailing Notification by the Govt of India or State Govt which ever is higher. (m)Employees Provident Fund as per latest prevailing Notification by the Govt of India. (n)Employees State Insurance Contribution as per latest prevailing Notification by the Govt of India or State Govt which ever is high. (o)Contribution of Bonus as per latest prevailing Notification by the Govt of India. (p)Over head & Profit of the Contractor. (q)GST as applicable as per prevailing Notification by the Govt of India. (r)Labour Welfare Cess as per latest prevailing Notification by the Govt of India
Routine maintenance and complete checking and complete servising (viz: cleaning , oiling , greasing , checking push buttons , internal lighting systum and wiring ,battery , ARD systum etc.) of fully automatic electrically operated lifts of any capacity having dual power operated door, automatic levelling device and microprocessor based simplex collective control system at various location at TRV Powai, Tungva Powai , CORA Powai , RHQ Worli , of makes Thyssenkrup an KONA . Including replacement of defective userviceable spare parts viz: Governor pulley, Door Sensor , Main Mother Board card , Display (Comm) Card , Cabin Light 2 x 2 Sq Decorative , COP (Communication) Card , Cabin Blower Fan , Door Sensor etc., NOTE : Spare parts viz: Governor pulley, Door Sensor , Main Mother Board card , Display (Comm) Card , Cabin Light 2 x 2 Sq Decorative , COP (Communication) Card , Cabin Blower Fan , Door Sensor etc., shall be measured and paid for seperately
Supply and fixing Governor pulley ,complete all as specified and directed.
Supply and fixing Door Sensor ,complete all as specified and directed.
Supply and fixing Main Mother Board card ,complete all as specified and directed.
Supply and fixing Display (Comm) Card ,complete all as specified and directed.
Supply and fixing Cabin Light 2 x 2 Sq Decorative ,complete all as specified and directed.
Supply and fixing COP (Communication) Card ,complete all as specified and directed.
Supply and fixing Cabin Blower Fan ,complete all as specified and directed.
Supply and fixing Door Sensor ,complete all as specified and directed.
Taking down existing unserviceable ARD with 4 Nos 12 Volts,17 AH batteries from machine room and S&F new Automatic Rescue Device(ARD) including relays, PCB cards/dioders card and 4 Nos maintenance free sealed batteries of 12 volts , 17 AH (Make Excide/Amron) suitable for 8 passenger any type of make lift (G+7 Floors) installed at POWAI AREA,complete all as specified and directed,Make of ARD :Thyssenkrupp or equivalent make as approved by GE. Schedule of credit : Rs. 4335.00
Shree Elevator Engineering Co.
Monarch Enterprises
Escon Elevators Pvt Ltd
Veer High Tech Solution
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .