Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.1 LAdmitted-Fee/PreQual/Technical/Finance | +4.50% | ₹9.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹9.2 L+₹9,544.06 (1.05%)Admitted-Fee/PreQual/Technical/Finance HARIPUR COLLIERY PANDAVESHWAR SATGRAM 713378 WEST BENGAL INDIA | SATGRAM | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | +5.60% | ₹9.2 L+₹9,544.06 (1.05%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹9.3 L+₹21,691.04 (2.39%)Admitted-Fee/PreQual/Technical/Finance BADYAKAPARA NIMSHA P O KHOTTADHI PASCHIM BARDHAMAN 713378 WEST BENGAL INDIA | KHOTTADHI | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | +7.00% | ₹9.3 L+₹21,691.04 (2.39%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.7 L
EMD Value
₹10,900
Closing Date
18 Jul 2026, 4:00 pmClosed
Area Engineer Civil Kenda Area
Office of the General Manager Kenda Area, P.O. Haripur, Dist - Burdwan, West Bengal-713378
Providing barrier, water sprinkler system and other miscellaneous works at Bahula Siding under Kenda Area
2026_ECL_361711_1
ECL/GM/Knd/AE(C)/ e-tender/26-27/42 date- 04.07.2026
Open Tender
Civil Works - Others
Percentage
30 days
Bahula
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,900
3 Aug 2026
7 Jul 2026
20 Jul 2026
7 Jul 2026
18 Jul 2026
8 Jul 2026
7 Jul 2026 - 11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 1 | cum | 188.75 | ₹188.56 |
| 1.02 | Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift | 1 | cum | 121.05 | ₹120.93 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 5,434.55 | - |
| 1.04 | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement Mortar 1:6 (1 cement : 6 coarse sand). | - | cum | 4,327 | - |
| 1.05 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 1 | cum | 6,903.9 | ₹6,897 |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 1 | sqm | 269.3 | ₹269.03 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | 644.7 | - |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 1 | sqm | 494.05 | ₹493.56 |
| 1.09 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1 | kg | 95.75 | ₹95.65 |
| 1.1 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.(metrial given by company) | - | Kg | 27.34 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Tendernotice_2.pdf
PDF • 1.24 MB
BOQ_374598.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .