| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr Quoted ₹1.5 Cr | L1 | Accepted-AOC ACCEPTED BEING L1 |
| 2 | L2₹1.5 Cr+₹3.1 L (2.12%)Rejected-Finance | ₹1.5 Cr+₹3.1 L (2.12%) | L2 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| 3 | L3₹1.5 Cr+₹6.6 L (4.47%)Rejected-Finance NO 68 ANJANEYA TEMPLE CROSS OPP M S RAMAIAH HOSPITAL NEW BEL ROAD BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | ₹1.5 Cr+₹6.6 L (4.47%) | L3 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| 4 | L4₹1.6 Cr+₹9.2 L (6.30%)Rejected-Finance | ₹1.6 Cr+₹9.2 L (6.30%) | L4 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| 5 | L5₹1.6 Cr+₹10.4 L (7.07%)Rejected-Finance 15 MOULYA NMH LAYOUT 1ST STAGE CHIKKA BANAVARA POST BENGALURU 560 090 | BENGALURU URBAN | KARNATAKA | 560090 | ₹1.6 Cr+₹10.4 L (7.07%) | L5 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| Sl No | Description | Qty | Unit | LAKSHMI CONSTRUCTIONS L10 | devan enterprises L3 | Moulya Builders L5 | shashi shekar construction L9 | Lucky Enterprises L7 | M/S SRI BALAJI ENTERPRISES L6 | Maruthi constructions L8 | RAMESH BABU CO L4 | K T ASSOCIATES L2 | RMK PROJECTS L11 | SREE BUILDERS L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 mtr in width and not exceeding 1.5 mtr in depth for laying of cables up to proper level and laying of pipelines etc in soft/loose soil, complete all as specified and directed. | 415.37 | Cum | 450 ₹1,86,916.5 | 410 ₹1,70,301.7 | 426 ₹1,76,947.62 | 420 ₹1,74,455.4 | 480 ₹1,99,377.6 | 600 ₹2,49,222 | 550 ₹2,28,453.5 | 350 ₹1,45,379.5 | 300 ₹1,24,611 Lowest | 514 ₹2,13,500.18 | 360 ₹1,49,533.2 |
| 2.00 | Returning, filling in including spreading, levelling, watering and well ramming in layers not exc 25 cm thick, complete all as specified and directed. | 279.11 | Cum | 160 ₹44,657.6 | 100 ₹27,911 Lowest | 150 ₹41,866.5 | 150 ₹41,866.5 | 115 ₹32,097.65 | 120 ₹33,493.2 | 120 ₹33,493.2 | 100 ₹27,911 Lowest | 120 ₹33,493.2 | 150 ₹41,866.5 | 120 ₹33,493.2 |
| 3.00 | Removing surplus excavated material (soil) not exc 50 meter and depositing where directed at a level not exc 1.5 meter above the starting point, complete all as specified and directed. | 19.22 | Cum | 500 ₹9,610 | 450 ₹8,649 | 450 ₹8,649 | 450 ₹8,649 | 380 ₹7,303.6 | 450 ₹8,649 | 450 ₹8,649 | 300 ₹5,766 | 100 ₹1,922 Lowest | 655 ₹12,589.1 | 250 ₹4,805 |
| 4.00 | Material and labour for Spreading ribbed soil in trenches as in cable cushioning all as per IS 1255-1983, complete all as specified and directed.
Note :-
(i) Excavated approved soil shall be ribbed by using sieve to separate composite particles etc. as per IS and refilling in trenches before laying of cable 8 CM and 15 CM after laying of cable. This is then gently punned down to a depth of 10 cm above the top of upper most cable
(ii) For the purpose of measurement only punned thickness shall be considered for payment. | 117.05 | Cum | 230 ₹26,921.5 Lowest | 265 ₹31,018.25 | 280 ₹32,774 | 250 ₹29,262.5 | 450 ₹52,672.5 | 245 ₹28,677.25 | 295 ₹34,529.75 | 250 ₹29,262.5 | 230 ₹26,921.5 Lowest | 300 ₹35,115 | 255 ₹29,847.75 |
| 5.00 | Taking down and relaying of existing serviceable GI tubing / connection in new or old positions including cleaning, cutting, threading all as directed, along with new GI fittings where ever replaced and required at site of size 40 to 50 mm bore complete all as specified directed.
Note: Excavation & earthwork shall be measured & paid seperately | 55 | RM | 100 ₹5,500 | 140 ₹7,700 | 150 ₹8,250 | 90 ₹4,950 | 70 ₹3,850 Lowest | 90 ₹4,950 | 75 ₹4,125 | 80 ₹4,400 | 85 ₹4,675 | 89 ₹4,895 | 150 ₹8,250 |
| 6.00 | Taking down and relaying of existing serviceable GI tubing / connection in new or old positions including cleaning, cutting, threading all as directed, along with new GI fittings where ever replaced and required at site of size 25 mm bore complete all as specified directed.
Note: Excavation & earthwork shall be measured & paid seperately | 40 | RM | 125 ₹5,000 | 100 ₹4,000 | 130 ₹5,200 | 90 ₹3,600 | 75 ₹3,000 Lowest | 130 ₹5,200 | 95 ₹3,800 | 80 ₹3,200 | 80 ₹3,200 | 100 ₹4,000 | 110 ₹4,400 |
| 7.00 | Taking down and relaying of existing serviceable GI tubing / connection in new or old positions including cleaning, cutting, threading all as directed, along with new GI fittings where ever replaced and required at site of size 20 mm bore complete all as specified directed.
Note: Excavation & earthwork shall be measured & paid seperately | 65 | RM | 90 ₹5,850 | 90 ₹5,850 | 110 ₹7,150 | 80 ₹5,200 Lowest | 90 ₹5,850 | 95 ₹6,175 | 85 ₹5,525 | 95 ₹6,175 | 95 ₹6,175 | 107 ₹6,955 | 100 ₹6,500 |
| 8.00 | Taking down and relaying of existing serviceable GI tubing / connection in new or old positions including cleaning, cutting, threading all as directed, along with new GI fittings where ever replaced and required at site of site of size 15 mm borecomplete all as specified directed. | 35 | RM | 50 ₹1,750 | 41 ₹1,435 | 50 ₹1,750 | 40 ₹1,400 Lowest | 40 ₹1,400 Lowest | 45 ₹1,575 | 60 ₹2,100 | 55 ₹1,925 | 45 ₹1,575 | 48 ₹1,680 | 90 ₹3,150 |
| 9.00 | Supply & Fix as in replacement GI tubing medium grade of size 80 mm bore with all fittings on wall/ trenches complete including cutting and threading all as required at site complete all as specified and directed.
Note: Excavation & earthwork shall be measured & paid seperately | 36 | RM | 50 ₹1,800 | 1,200 ₹43,200 | 1,260 ₹45,360 | 1,300 ₹46,800 | 1,300 ₹46,800 | 11 ₹396 Lowest | 1,210 ₹43,560 | 1,500 ₹54,000 | 1,200 ₹43,200 | 1,298 ₹46,728 | 1,180 ₹42,480 |
| 10.00 | Supply & Fix as in replacement of GI tubing medium grade of size 50 mm bore with all fittings on wall/ trenches complete including cutting and threading all as required at site complete all as specified directed.
Note: Excavation & earthwork shall be measured & paid seperately | 64 | RM | 1,200 ₹76,800 | 650 ₹41,600 | 850 ₹54,400 | 400 ₹25,600 | 400 ₹25,600 | 600 ₹38,400 | 510 ₹32,640 | 300 ₹19,200 Lowest | 450 ₹28,800 | 490 ₹31,360 | 758 ₹48,512 |
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
2 Oct 2025, 6:00 pmClosed
Garrison Engineer MGarrison Engineer AF Jalahalli
Garrison Engineer M AF Jalahalli Bangalore 560013
REPAIR MAINT OF EXTERNAL WATER SUPPLY SYSTEM LT PANEL POWER FACTOR CORRECTION SUBMAIN WIRING MAIN DBs MCBs BLDG EARTHING AND OTHER MISC WORKS AT AFTC 2DC AREA AND AFS EAST WEST JALAHALLI
2025_MES_729483_1
8202/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Garrison Engineer M AF Jalahalli
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Garrison Engineer M AF Jalahalli
₹2.3 L
24 Oct 2025
4 Sept 2025
9 Oct 2025
4 Sept 2025
2 Oct 2025
25 Sept 2025
4 Sept 2025 - 11 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .