Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹35.6 LAdmitted-Finance | -1.31% | ₹35.6 L | L1 | Admitted-Finance |
| 2 | L2₹36.6 L+₹97,797.54 (2.75%)Admitted-Finance | +1.00% | ₹36.6 L+₹97,797.54 (2.75%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical NOT ADMITTED The affidavit required under Schedule-3 regarding correctness of information has been submitted |
| Sl No | Description | Qty | Unit | Heena Enterprises L2 | RASAAL INFRA PROJECTS PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| .10Non-BSR Items | |||||
| 1.00 | Labour charges for spreading of available 20 to 63 mm nominal size hand / crusher broken stone aggregates in uniform layer of 100 mm thickness in yard of any substations (charged / uncharged GSS) with manual / mechanical means, as permitted by engineer in-charge with due care, as per safety norms of substations, complete in all respect with all lead and lift. (Payment shall be done as per stack measurement after deduction of voids as per norms). | 318 | Sqm. | 250 ₹79,500 | 200 ₹63,600 Lowest |
Tender Value
₹42.6 L
EMD Value
₹85,200
Closing Date
17 Aug 2026, 6:00 pmClosed
SE (CIVIL) RVPN UDAIPUR
PATEL CIRCLE
Modification of Existing transformer foundation and Accociated work in Augmentation of 160 MVA 220/132KV Transformer at 220KVGSSNimbahera
2026_RRVPN_581981_2
NIT11/26-27 SE(CIVIL) RVPN UDAIPUR
Open Tender
Civil Works
Percentage
180 days
NIMBAHERA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
Accounts officer (T and C) RVPN Chittorgarh,MDRISL
₹85,200
Yes
1 Sept 2026
5 Aug 2026
18 Aug 2026
5 Aug 2026
17 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.9 | Part-A: Building Works
PWD Rajasthan Integrated Building BSR 2022 | - | - | - | - |
| 1 | (B-207/14.3) Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 8 | Cum. | 1,023 | ₹8,184 |
| - | (B-83/1.9.1) Excavation work by mechanical means (Hydraulic Excavator) / manual means in foundation, trenches or drains not exceeding 1.5 m in width or 10 sum on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available. Ordinary rock. | 54 | Cum. | 268 | ₹14,472 |
| - | (B-82/1.7.1) Earth work in excavation by mechanical means (Hydraulic Excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed: Ordinary rock. | 152 | Cum. | 251 | ₹38,152 |
| - | (B-92/3.1.6) Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering; All works up to plinth level. 1:4:8 (1-Cement:4-coarse sand:8-graded stone aggregate 40 mm nominal size). | 15 | Cum. | 3,962 | ₹59,430 |
| - | (B-97/4.1) Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix. | 48 | Cum. | 5,921 | ₹2,84,208 |
| - | (B-99/4.9) Centering and shuttering with plywood or steel sheets including strutting, propping, bracing both ways and removal of formwork for foundations in basements rafts, footings, strap beams, bases of columns, etc. | 65 | Sqm. | 173 | ₹11,245 |
| - | (B-100/4.13.3) Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. Thermo-mechanically Treated bars (Conforming of relevent IS code). | 2,790 | Kg. | 82 | ₹2,28,780 |
| - | (B-145/9.1+B-145/9.1.1) Structural steel work in single section fixed with or without connecting plate including cutting, hoisting (height upto 10 m), fixing in position and applying a priming coat of approved steel primer all complete. Add extra if I/Rail section is used. | 1,160 | Kg. | 91.3 | ₹1,05,908 |
| - | (B-145/9.2) Structural steel work riveted, bolted or welded in built up sections,trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete. | 2,210 | Kg. | 93 | ₹2,05,530 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
DOCUMENT.pdf
Tender Documents • 0.76 MB
BOQ_1034044.xls
BOQ • 0.32 MB
Aggrement.pdf
Other Document • 7.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .