Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC 417 SHAHPUR NIJ MORTA DISTT GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹4.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.0 LRejected-Finance | ₹5.0 L | L2 | Rejected-Finance Rejected,BeingL-2 |
| 3 | L3₹5.0 LRejected-Finance CANAL COLONY BANBASA DISTRICT CHAMPAWAT UTTARAKHAND | CHAMPAWAT | UTTARAKHAND | 262309 | ₹5.0 L | L3 | Rejected-Finance Rejected,BeingL-3 |
| 4 | L4₹5.1 LRejected-Finance 301 A AWAS VIKAS COLONY DISTRICT PILIBHIT | ₹5.1 L | L4 | Rejected-Finance Rejected,BeingL-4 |
| Sl No | Description | Qty | Unit | M/S OM ENTERPRISES L1 | JAGDISH CHANDRA SHRIVASTAVA L3 | M/S UDDESHYA TRADERS L2 | RITESH SAXENA CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick bushes and thorny jungle without uprooting , labour,material and T & P etc as directed by Engineer-in-Charge for proper completion of work. | 684 | M2 | 5 ₹3,420 | 5 ₹3,420 | 5.04 ₹3,447.36 | 5.17 ₹3,536.28 |
| 2.00 | Silt clearance/trench digging in wetted drain including all lifts and all leads, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction as per direction of Engineer in charge for proper completion of work. | 121 | M3 | 56 ₹6,776 | 55 ₹6,655 | 56.34 ₹6,817.14 | 57.82 ₹6,996.22 |
| 3.00 | Plain cement concrete (1:3:6) with stone ballast excluding cost of material with mechanical mixing but inclusive of labour and T&P etc as directed by Engineer-in-Charge for proper completion of work. | 13.5 | M3 | 6,000 ₹81,000 | 6,200 ₹83,700 | 6,032.73 ₹81,441.86 | 6,190.66 ₹83,573.91 |
| 4.00 | Random rubble masonary work in 1:4 with cement , coarse sand with hard stone in toe wall & sleeper including cost of all material, labour and T&P etc. complete as directed by Engineer-in-Charge for proper completion of work. | 54 | M3 | 5,500 ₹3.0 L | 5,600 ₹3.0 L | 5,562.21 ₹3.0 L | 5,707.81 ₹3.1 L |
| 5.00 | Supply of Geotextile sheet made of 200 GSM woven multiflament polypropylene yarn sheet below pitching on slopes including all cost of labour material, and T&P etc. with all texes but excluding cost of GST as directed by Engineer-in-charge for proper completion of work. | 175 | M2 | 107 ₹18,725 | 110 ₹19,250 | 107.9 ₹18,882.50 | 110.74 ₹19,379.50 |
| 6.00 | Laying Boulder pitching 20 to 40 kg. weight including all cost of material , labour , T & P etc as directed by Engineer-in-Charge for proper completion of work. | 40.25 | M3 | 2,100 ₹84,525 | 2,200 ₹88,550 | 2,117.52 ₹85,230.18 | 2,172.95 ₹87,461.24 |
Tender Value
₹5.2 L
EMD Value
₹12,000
Closing Date
12 Jan 2026, 11:00 amClosed
Executive Engineer ,Head works Division, Sarda can
Executive Engineer, Head works Division, Sarda canal Bareilly.
Nai Sharda Devha Poshak Nahar ke km. 14.180 per Sthit Drain kee Safai v Boulder Pitching ke Karya.
2026_UPIDC_1103215_1
E-Tender Notice No 06/EE/2025-26
Open Tender
Civil Works - Canal
30 days
Banbasa
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹12,000
Yes
23 May 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
Cleaning thick bushes and thorny jungle without uprooting , labour,material and T & P etc as directed by Engineer-in-Charge for proper completion of work.
Silt clearance/trench digging in wetted drain including all lifts and all leads, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction as per direction of Engineer in charge for proper completion of work.
Plain cement concrete (1:3:6) with stone ballast excluding cost of material with mechanical mixing but inclusive of labour and T&P etc as directed by Engineer-in-Charge for proper completion of work.
Random rubble masonary work in 1:4 with cement , coarse sand with hard stone in toe wall & sleeper including cost of all material, labour and T&P etc. complete as directed by Engineer-in-Charge for proper completion of work.
Supply of Geotextile sheet made of 200 GSM woven multiflament polypropylene yarn sheet below pitching on slopes including all cost of labour material, and T&P etc. with all texes but excluding cost of GST as directed by Engineer-in-charge for proper completion of work.
Laying Boulder pitching 20 to 40 kg. weight including all cost of material , labour , T & P etc as directed by Engineer-in-Charge for proper completion of work.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_2034472.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid