Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC 417 SHAHPUR NIJ MORTA DISTT GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹4.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.0 LRejected-Finance | ₹5.0 L | L2 | Rejected-Finance Rejected,BeingL-2 |
| 3 | L3₹5.0 LRejected-Finance CANAL COLONY BANBASA DISTRICT CHAMPAWAT UTTARAKHAND | CHAMPAWAT | UTTARAKHAND | 262309 | ₹5.0 L | L3 | Rejected-Finance Rejected,BeingL-3 |
| 4 | L4₹5.1 LRejected-Finance 301 A AWAS VIKAS COLONY DISTRICT PILIBHIT | ₹5.1 L | L4 | Rejected-Finance Rejected,BeingL-4 |
| Sl No | Description | Qty | Unit | M/S OM ENTERPRISES L1 | JAGDISH CHANDRA SHRIVASTAVA L3 | M/S UDDESHYA TRADERS L2 | RITESH SAXENA CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick bushes and thorny jungle without uprooting , labour,material and T & P etc as directed by Engineer-in-Charge for proper completion of work. | 684 | M2 | 5 ₹3,420 Lowest | 5 ₹3,420 Lowest | 5.04 ₹3,447.36 | 5.17 ₹3,536.28 |
| 2.00 | Silt clearance/trench digging in wetted drain including all lifts and all leads, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction as per direction of Engineer in charge for proper completion of work. | 121 | M3 | 56 ₹6,776 | 55 ₹6,655 Lowest | 56.34 ₹6,817.14 | 57.82 ₹6,996.22 |
| 3.00 | Plain cement concrete (1:3:6) with stone ballast excluding cost of material with mechanical mixing but inclusive of labour and T&P etc as directed by Engineer-in-Charge for proper completion of work. | 13.5 | M3 | 6,000 ₹81,000 Lowest | 6,200 ₹83,700 | 6,032.73 ₹81,441.86 | 6,190.66 ₹83,573.91 |
| 4.00 | Random rubble masonary work in 1:4 with cement , coarse sand with hard stone in toe wall & sleeper including cost of all material, labour and T&P etc. complete as directed by Engineer-in-Charge for proper completion of work. | 54 | M3 | 5,500 ₹2,97,000 Lowest | 5,600 ₹3,02,400 | 5,562.21 ₹3,00,359.34 | 5,707.81 ₹3,08,221.74 |
| 5.00 | Supply of Geotextile sheet made of 200 GSM woven multiflament polypropylene yarn sheet below pitching on slopes including all cost of labour material, and T&P etc. with all texes but excluding cost of GST as directed by Engineer-in-charge for proper completion of work. | 175 | M2 | 107 ₹18,725 Lowest | 110 ₹19,250 | 107.9 ₹18,882.5 | 110.74 ₹19,379.5 |
| 6.00 | Laying Boulder pitching 20 to 40 kg. weight including all cost of material , labour , T & P etc as directed by Engineer-in-Charge for proper completion of work. | 40.25 | M3 | 2,100 ₹84,525 Lowest | 2,200 ₹88,550 | 2,117.52 ₹85,230.18 | 2,172.95 ₹87,461.24 |
Tender Value
₹5.2 L
EMD Value
₹12,000
Closing Date
12 Jan 2026, 11:00 amClosed
Executive Engineer ,Head works Division, Sarda can
Executive Engineer, Head works Division, Sarda canal Bareilly.
Nai Sharda Devha Poshak Nahar ke km. 14.180 per Sthit Drain kee Safai v Boulder Pitching ke Karya.
2026_UPIDC_1103215_1
E-Tender Notice No 06/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
30 days
Banbasa
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹12,000
Yes
23 May 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
Cleaning thick bushes and thorny jungle without uprooting , labour,material and T & P etc as directed by Engineer-in-Charge for proper completion of work.
Silt clearance/trench digging in wetted drain including all lifts and all leads, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction as per direction of Engineer in charge for proper completion of work.
Plain cement concrete (1:3:6) with stone ballast excluding cost of material with mechanical mixing but inclusive of labour and T&P etc as directed by Engineer-in-Charge for proper completion of work.
Random rubble masonary work in 1:4 with cement , coarse sand with hard stone in toe wall & sleeper including cost of all material, labour and T&P etc. complete as directed by Engineer-in-Charge for proper completion of work.
Supply of Geotextile sheet made of 200 GSM woven multiflament polypropylene yarn sheet below pitching on slopes including all cost of labour material, and T&P etc. with all texes but excluding cost of GST as directed by Engineer-in-charge for proper completion of work.
Laying Boulder pitching 20 to 40 kg. weight including all cost of material , labour , T & P etc as directed by Engineer-in-Charge for proper completion of work.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_2034472.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].