| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical BARMER | RAJASTHAN | 344001 | Accepted-Technical Responsive |
| 2 | Accepted-Technical | Accepted-Technical Responsive |
| 3 | Accepted-Technical | Accepted-Technical Responsive |
| 4 | Accepted-Technical | Accepted-Technical Responsive |
Tender Value
₹8.3 Cr
EMD Value
₹17 L
Closing Date
20 Aug 2026, 12:00 pmClosed
SE RED KANPUR CIRCLE
SE RED KANPUR CIRCLE
Construction and 5 year Maintenance Works of District- Kanpur Nagar Under FDR Group UPFDR- 207
2026_UPRRD_148932_1
1204/RED/TENDER/PMGSY-III /Kanpur Nagar/2026-27 Dt 28/07/2026
Open Tender
Civil - Roads and Bridges
Percentage
365 days
Kanpur Nagar
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,000
₹17 L
SE RED KANPUR CIRCLE
14 Sept 2026
7 Aug 2026
20 Aug 2026
7 Aug 2026
20 Aug 2026
7 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Road:- Gangupur Pihani Hilalpur Kharamau To Araul Makanpur road,(ch.0.00-4.00km) Pkg No UP 4193 | - | - | - | - |
| - | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. Non thorny jungle) ( By Mechanical Means) | - | Sqm | 7.01 | - |
| - | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 . | 1 | Cum | 172.72 | ₹172.55 |
| - | Construction of Embankment with approved soil with a lift upto 1.5 m laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2 | - | Cum | 166.7 | - |
| - | Construction of Embankment with approved soil with a lift upto 1.5 m and lead 1000 mts laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2 | - | Cum | 241.59 | - |
| - | Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements | - | Cum | 170.69 | - |
| - | Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads 1000 mts, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements | 1 | Cum | 245.58 | ₹245.33 |
| - | Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives/otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ minimum 5-7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane.The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer/reclaimer of working width of 2.4 m and with minimum engine HP of 440 kw with a variable working depth up to 50 cm.The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement/soil/aggregates/soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects.The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018.The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler-Padfoot Roller(20T)+Single Drum Compactor-Grader- Tandom Roller-PT Roller (20 T) | - | Cum | 3,760 | - |
| - | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavater at OMC, and compacting with smooth wheeled roller to achieve the desired density as per clause 401(GSB Grade I) | - | Cum | 3,587.94 | - |
| - | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause 502 | - | Sqm | 43.76 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.24 MB
BOQ_234283.xls
BOQ • 0.45 MB
FDR207_SBD.pdf
Tender Documents • 15.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .