Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹8.6 L+₹25,557 (3.05%)Admitted-Finance 174 BAKSARA L M C SARANI JAMRULTALA HOWRAH WEST BENGAL 711110 | HOWRAH | WEST BENGAL | 711110 | L2 | Admitted-Finance | ||
| 3 | L3₹8.7 L+₹34,019 (4.06%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹8.5 L
EMD Value
₹17,500
Closing Date
24 Sept 2026, 12:00 pmClosed
DG E and H
3rd floor,Market street ,Kol-87
CLEANING,RESTORATION AND EXCAVATION OF WATERBODIES ON THE URGENT BASIS OF DIFFERENT WARDS OF BOROUGH X TO XVI
2026_KMC_1042015_1
EH/MISC/02/2026-27/R1
Open Tender
CIVIL WORKS
Percentage
240 days
Kolkata
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹17,500
1 Oct 2026
14 Sept 2026
26 Sept 2026
16 Sept 2026
24 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CLEARING JUNGLE INCLUDING UPROOTING OF
TRUNK,VEGITATION ,GRASS, BRUSH WOOD, TREES, WATER
HYACINTH, AQUATIC WEEDS FROM WATER BODY AND
SAPLINGS OF GIRTH UPTO 30 CM BELOW THE LEVEL OF
WATER AND HEIGHT OF 1M ABOVE THE SURFACE OF WATER
AND SUITABLY DISPOSED UPTO A DISTANCE OF 50M FROM
THE OUTSIDE OF PERIPHERY OF THE WATER BODY. | 21.6 | 100 SQUARE METERS | 2,179.71 | ₹47,081.74 |
| 2 | EARTHWORK FOR RIVERS, CHANNELS, CANALS,
EMBANKMENTS ETC.1.15 Earthwork in excavation or re-excavation
of drainage channels / rivers in all kinds of soil including silt, sand,
slush etc. mixed with all sorts of Industrial wastes, sewages,
municipal garbage, carcasses, tannery effluents, jungles, bushes,
semi-solid / solid campact mass, water hyacinth, cowdung deposits,
decomposed vegetations, polythenes, brick bats, gravels, stone
ballast, crates, remnant of bullah and bamboo pins etc. by means of
suitable excavator mounted on pontoon (min. depth of water 0.75
metre) specially made to suit the site condition in tidal or non-tidal
channel / river and carrying of the excavated materials to suitable
locations of the channel / river bank from the point of excavation by
diesel machine operated boats or similar arrangements in a manner
suited for the purpose and placing the excavated materials from the
boat etc. on the top of the bank in case of disposal at suitable placesBUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. II. COMPOUND DEVELOPMENT: 19) Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared)arranged by the agency at his own cost, on the bank at available
locations having distances from the point of re- excavation as shown
below, by means of excavators or any other machines or manually as
may be required, including all lifts. Measurement : By Pre-work and
Post- work level sections. Pre-work level for the existing bed of the
channel / river is to be taken by displacing water hyacinth and all
other floating materials including compact masses, carcasses etc.
and for which no extra payment will be made. Post-work level section
will be taken only when a stretch of at least 300 metre is completed
and the said post-work will be taken within 7 days after completion of
excavation in that reach.(a) For distance 0 to 50 metre from the point
of re-excavation to the placing point on the bank. | 1,080 | CUBIC | 170 | ₹1,83,600 |
| 3 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
2. Earth work in excavation of foundation trenches or drains, in all
sorts of soil (including mixed soil but excluding laterite or sandstone)
including removing, spreading or stacking the spoils within a lead of
75 m. as directed. The item includes necessary trimming the sides of
trenches levelling, dressing and ramming the bottom, bailing out
water as required complete. (a) Depth of excavation not exceeding
1,500 mm. | 10.8 | CUBIC | 11,927 | ₹1,28,811.12 |
| 4 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :
3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of
10% contractors profit and 1% Labour welfare cess which would be
admissible to the Contractors, but contractual percentage will not be
applicable. (II) The workersemployed on high rise building or any
structure over 30 ft in height and also workers engaged in Tunnel
shall be paid 20% extra wages. | 50 | EACH | 245 | ₹12,250 |
| 5 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES
ETC 13. Removal of rubbish,earth etc. from the working site and
disposal of the same beyond the compound, in conformity with the
Municipal / Corporation Rules for such disposal, loading into truck
and cleaning the site in all respect as per direction of Engineer in
charge | 2,808 | CUBIC METER | 166 | ₹4,66,128 |
| 48 | Estimated amount | - | - | - | - |
| 51 | 1% LWC | 1 | LS | 2,443.73 | ₹2,443.73 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
form.pdf
Tender Documents • 0.77 MB
tendec.pdf
Tender Documents • 0.34 MB
oii.pdf
Additional Documents • 0.91 MB
BOQ_2557958.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .