Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹528.5 CrAccepted-Finance | L1 | Accepted-Finance BEING L1 | |
| 2 | L2₹604.7 Cr+₹76.2 Cr (14.4%)Rejected-Finance 203 PANAMA TOWER NEAR HOTEL CROWN PALACE KANCHAN BAGH INDORE 452 001 | INDORE | INDORE | MADHYA PRADESH | 452001 | L2 | Rejected-Finance BEING L2 |
Tender Value
₹629.1 Cr
EMD Value
₹50 L
Closing Date
14 Oct 2022, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE WR Division, Mandla
EE WR Division, Mandla
On Turn Key Basis Construction of Upper Burhner Project dam and Pressurized pipe irrigation network. as per details in scope of work but not limited to that.
2022_WRD_217309_1
920/2022-23/ENC/ET/Budner Dt. 18.08.22
Open Tender
Civil Works - Others
Turn-key
1825 days
Mandla
Please refer tender document
30 documents required · 30 mandatory
₹50,000
₹50 L
Bhopal
12 Jul 2023
8 Sept 2022
17 Oct 2022
8 Sept 2022
14 Oct 2022
15 Sept 2022
20 Sept 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of upper burhner project with 1 No, Saddhle dam on Budner River and its tributaries with minimum gross storage capacity of 121.30 MCM on turn key basis (with maximum submergence of dam is 1562.025 Ha. out of which 664.00 Ha. Forest Land ) .The work includes construction of all civil, power house for 10 MW (1 Unit) power generation with all allied work, electrical , mechanical works and construction of Central Spillway with Radial Gate or other suitable surflushing arrangement. i/c hoisting arrangement, gantry crane, stop logs, energy dissipation arrangements, all instrumentations, gates automation, illumination on dam including SCADA and construction of earthen dam | |||||
| 1.01 | Construction of upper burhner project with 1 No, Saddhle dam on Budner River and its tributaries with minimum gross storage capacity of 121.30 MCM on turn key basis (with maximum submergence of dam is 1562.025 Ha. out of which 664.00 Ha. Forest Land ) .The work includes construction of all civil, power house for 10 MW (1 Unit) power generation with all allied work, electrical , mechanical works and construction of Central Spillway with Radial Gate or other suitable surflushing arrangement. i/c hoisting arrangement, gantry crane, stop logs, energy dissipation arrangements, all instrumentations, gates automation, illumination on dam including SCADA and construction of earthen dam | 1 | Nos | 6,29,10,73,000 | ₹6,29,10,73,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.55 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.40 MB
UPPERBURHNERPROJECTVolume1.pdf
Tender Documents • 1.28 MB
BOQ_258889.xls
BOQ • 0.25 MB
upperbudnerindex.pdf
Other Document • 2.33 MB
VOLUME2uuperbudner.pdf
Tender Documents • 5.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .