| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC CHARKHI DADRI | CHARKI DADRI | HARYANA | 127022 | ₹1.7 Cr | L1 | Accepted-AOC ok |
| 2 | L2₹1.8 Cr+₹10.7 L (6.31%)Rejected-Finance | ₹1.8 Cr+₹10.7 L (6.31%) | L2 | Rejected-Finance ok |
| 3 | L3₹2.2 Cr+₹45.9 L (27.1%)Rejected-Finance 2339 4 NEHRU COLONY 2339 4 NEHRU COLONY JIND ROAD ROHTAK 124001 | ROHTAK | ROHTAK | HARYANA | 124001 | ₹2.2 Cr+₹45.9 L (27.1%) | L3 | Rejected-Finance ok |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
23 Apr 2025, 5:00 pmClosed
Vijay Dalal
EXECUTIVE ENGINEER PROV DIV NO 4 PWD B AND R PGIMS ROHTAK
Construction of 06 nos MS Fire Staircase for Class III staff houses 650 sft G plus 6 in UHS Rohtak.
2025_HRY_439705_1
20258B48C34F 75E9 42F2 8D22 B329A1418D8F654BAR
Open Tender
Civil Works
Works
90 days
Rohtak
Construction of 06 nos MS Fire Staircase for Class III staff houses 650 sft G plus 6 in UHS Rohtak.
2 documents required · 2 mandatory
₹15,000
₹3.6 L
Yes
EE PD4 PWD Rohtak
18 Jun 2025
9 Apr 2025
23 Apr 2025
9 Apr 2025
23 Apr 2025
9 Apr 2025
21 Apr 2025
Amount
[10.1]Providing and laying of base course of floors consisting of 100 mm thick cement 1:8:16 and 100 mm sand or stone filling. [Through Rate]
[10.37.1]Providing and fixing of Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 1. 25 mm thick [Through Rate]
[11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [Through Rate]
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate]
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level [Through Rate]
[6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate]
[6.30.6]Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
Excavating, supplying and filling of local earth (including royalty) cum by mechanical transport up to any lead and lift also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.(NS )
Surya builders (BID ID -1246833)
PRP INFRACONE (BID ID -1241703)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .