Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC 13B ELLORA ENCLAVE DAYAL BAGH AGRA U P | AGRA | AGRA | UTTAR PRADESH | ₹2.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.4 Cr+₹24.2 L (11.3%)Rejected-Finance | ₹2.4 Cr+₹24.2 L (11.3%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.4 Cr+₹30.6 L (14.4%)Rejected-Finance | ₹2.4 Cr+₹30.6 L (14.4%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.5 Cr+₹40.9 L (19.2%)Rejected-Finance SHOP NO 25 JEEVAN PLAZA VIRAM KHAD 5 GOMTI NAGAR LUCKNOW U P 226010 | NA | NA | 226010 | ₹2.5 Cr+₹40.9 L (19.2%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | - | - | Rejected-Technical NOT ENOUGH EXPERIENCE. |
| Sl No | Description | Qty | Unit | VINAY KUMAR SINGH L2 | shivansh venture pvt ltd L4 | NIKHIL CONSTRUCTION L1 | M/S PRATAP NIRMAN SANSTHAN L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 1,062 | M3 | 50 ₹53,100 | 54.27 ₹57,634.74 | 45 ₹47,790 Lowest | 55 ₹58,410 |
| 2.00 | E/W in restoration & strengthening of bank's for making canal section in all type of soil mixed with chharry, karail, black coton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 34,648 | M3 | 160 ₹55,43,680 | 191.97 ₹66,51,376.56 | 145 ₹50,23,960 Lowest | 180 ₹62,36,640 |
| 3.00 | Dismantling of old C.R.S masonary including stakingof boulder ,all labour T&Pas per direc.of Er-in-charge | 28.18 | M3 | 380 ₹10,708.4 | 427.5 ₹12,046.95 | 350 ₹9,863 Lowest | 450 ₹12,681 |
| 4.00 | Dismatling of C.C. of old and damaged base concrete including all cost proper disposal labour and T&P etc as per direction of Er-in-charge | 17.04 | M3 | 425 ₹7,242 | 475 ₹8,094 | 390 ₹6,645.6 Lowest | 500 ₹8,520 |
| 5.00 | Earth work Excavation in foundation in all type of soils including back filling of excavated earth ,all lead and lift and T&P etc. | 3,821.67 | M3 | 90 ₹3,43,950.3 | 94.77 ₹3,62,179.67 | 72 ₹2,75,160.24 Lowest | 110 ₹4,20,383.7 |
| 6.00 | Laying .C.C.(1:3:6) in foundation including cost of material, labour, T&P etc. | 1,228.83 | M3 | 4,200 ₹51,61,086 Lowest | 4,332.78 ₹53,24,250.05 | 4,200 ₹51,61,086 Lowest | 4,220 ₹51,85,662.6 |
| 7.00 | C.R.Stone masonry in 1:3 cement Coarse sand of F.M. more then 2.0 mortar and stone boulder of size 200 X 200 X 150 mm size including cost of all material labor and T&P etc . | 2,250.11 | M3 | 4,600 ₹1,03,50,506 | 4,662.32 ₹1,04,90,732.86 | 4,350 ₹97,87,978.5 Lowest | 4,400 ₹99,00,484 |
| 8.00 | Providing and Laying LDPE Film 200 Micron below in C.C. including cost of all material, labour and T&P etc. for proper completion of work. | 11,779.47 | M2 | 34 ₹4,00,501.98 | 37.52 ₹4,41,965.71 | 22 ₹2,59,148.34 Lowest | 39.5 ₹4,65,289.07 |
| 9.00 | Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labourT&P etc. | 10,966.88 | M2 | 127 ₹13,92,793.76 | 141.17 ₹15,48,194.45 | 25 ₹2,74,172 Lowest | 140 ₹15,35,363.2 |
| 10.00 | Laying C.C.1:1.5:3 including cost of material, labour, T&P etc. | 24.51 | M3 | 6,610 ₹1,62,011.1 | 7,437.51 ₹1,82,293.37 | 6,500 ₹1,59,315 Lowest | 7,828 ₹1,91,864.28 |
Tender Value
₹2.8 Cr
EMD Value
₹5.6 L
Closing Date
20 Feb 2026, 3:00 pmClosed
SE
SE, IRRIGATION WORK CIRCLE, 9 SAPRU ROAD, CIVIL LINE, PRAYAGRAJ
Restoration and Pucca work of Meja dy. From km 4.200 to km 10.200.
2026_UPIDC_1113784_4
05/SE/2025-26
Open Tender
Civil Works
Item Wise
540 days
PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹5.6 L
24 Mar 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
E/W in restoration & strengthening of bank's for making canal section in all type of soil mixed with chharry, karail, black coton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
Dismantling of old C.R.S masonary including stakingof boulder ,all labour T&Pas per direc.of Er-in-charge
Dismatling of C.C. of old and damaged base concrete including all cost proper disposal labour and T&P etc as per direction of Er-in-charge
Earth work Excavation in foundation in all type of soils including back filling of excavated earth ,all lead and lift and T&P etc.
Laying .C.C.(1:3:6) in foundation including cost of material, labour, T&P etc.
C.R.Stone masonry in 1:3 cement Coarse sand of F.M. more then 2.0 mortar and stone boulder of size 200 X 200 X 150 mm size including cost of all material labor and T&P etc .
Providing and Laying LDPE Film 200 Micron below in C.C. including cost of all material, labour and T&P etc. for proper completion of work.
Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labourT&P etc.
Laying C.C.1:1.5:3 including cost of material, labour, T&P etc.
Colour washing of two coat of parapet including cost of all materials,labour and T&P etc.
E/W in embankment for restoration of canal section in all type of soil mixed including all lead ,lift dressing , etc.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_2063945.xls
BOQ • 0.26 MB
DOC_Belan.pdf
Tender Documents • 2.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .