| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC 13B ELLORA ENCLAVE DAYAL BAGH AGRA U P | AGRA | AGRA | UTTAR PRADESH | ₹2.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.4 CrRejected-Finance | ₹2.4 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹2.4 CrRejected-Finance | ₹2.4 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹2.5 CrRejected-Finance SHOP NO 25 JEEVAN PLAZA VIRAM KHAD 5 GOMTI NAGAR LUCKNOW U P 226010 | NA | NA | 226010 | ₹2.5 Cr | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | - | - | Rejected-Technical NOT ENOUGH EXPERIENCE. |
| Sl No | Description | Qty | Unit | VINAY KUMAR SINGH L2 | shivansh venture pvt ltd L4 | NIKHIL CONSTRUCTION L1 | M/S PRATAP NIRMAN SANSTHAN L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 1,062 | M3 | 50 ₹53,100 | 54.27 ₹57,634.74 | 45 ₹47,790 | 55 ₹58,410 |
| 2.00 | E/W in restoration & strengthening of bank's for making canal section in all type of soil mixed with chharry, karail, black coton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 34,648 | M3 | 160 ₹55,43,680 | 191.97 ₹66,51,376.56 | 145 ₹50,23,960 | 180 ₹62,36,640 |
| 3.00 | Dismantling of old C.R.S masonary including stakingof boulder ,all labour T&Pas per direc.of Er-in-charge | 28.18 | M3 | 380 ₹10,708.4 | 427.5 ₹12,046.95 | 350 ₹9,863 | 450 ₹12,681 |
| 4.00 | Dismatling of C.C. of old and damaged base concrete including all cost proper disposal labour and T&P etc as per direction of Er-in-charge | 17.04 | M3 | 425 ₹7,242 | 475 ₹8,094 | 390 ₹6,645.6 | 500 ₹8,520 |
| 5.00 | Earth work Excavation in foundation in all type of soils including back filling of excavated earth ,all lead and lift and T&P etc. | 3,821.67 | M3 | 90 ₹3,43,950.3 | 94.77 ₹3,62,179.67 | 72 ₹2,75,160.24 | 110 ₹4,20,383.7 |
| 6.00 | Laying .C.C.(1:3:6) in foundation including cost of material, labour, T&P etc. | 1,228.83 | M3 | 4,200 ₹51,61,086 | 4,332.78 ₹53,24,250.05 | 4,200 ₹51,61,086 | 4,220 ₹51,85,662.6 |
| 7.00 | C.R.Stone masonry in 1:3 cement Coarse sand of F.M. more then 2.0 mortar and stone boulder of size 200 X 200 X 150 mm size including cost of all material labor and T&P etc . | 2,250.11 | M3 | 4,600 ₹1,03,50,506 | 4,662.32 ₹1,04,90,732.86 | 4,350 ₹97,87,978.5 | 4,400 ₹99,00,484 |
| 8.00 | Providing and Laying LDPE Film 200 Micron below in C.C. including cost of all material, labour and T&P etc. for proper completion of work. | 11,779.47 | M2 | 34 ₹4,00,501.98 | 37.52 ₹4,41,965.71 | 22 ₹2,59,148.34 | 39.5 ₹4,65,289.07 |
| 9.00 | Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labourT&P etc. | 10,966.88 | M2 | 127 ₹13,92,793.76 | 141.17 ₹15,48,194.45 | 25 ₹2,74,172 | 140 ₹15,35,363.2 |
| 10.00 | Laying C.C.1:1.5:3 including cost of material, labour, T&P etc. | 24.51 | M3 | 6,610 ₹1,62,011.1 | 7,437.51 ₹1,82,293.37 | 6,500 ₹1,59,315 | 7,828 ₹1,91,864.28 |
Tender Value
₹2.8 Cr
EMD Value
₹5.6 L
Closing Date
20 Feb 2026, 3:00 pmClosed
SE
SE, IRRIGATION WORK CIRCLE, 9 SAPRU ROAD, CIVIL LINE, PRAYAGRAJ
Restoration and Pucca work of Meja dy. From km 4.200 to km 10.200.
2026_UPIDC_1113784_4
05/SE/2025-26
Open Tender
Civil Works
540 days
PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹5.6 L
24 Mar 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
E/W in restoration & strengthening of bank's for making canal section in all type of soil mixed with chharry, karail, black coton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
Dismantling of old C.R.S masonary including stakingof boulder ,all labour T&Pas per direc.of Er-in-charge
Dismatling of C.C. of old and damaged base concrete including all cost proper disposal labour and T&P etc as per direction of Er-in-charge
Earth work Excavation in foundation in all type of soils including back filling of excavated earth ,all lead and lift and T&P etc.
Laying .C.C.(1:3:6) in foundation including cost of material, labour, T&P etc.
C.R.Stone masonry in 1:3 cement Coarse sand of F.M. more then 2.0 mortar and stone boulder of size 200 X 200 X 150 mm size including cost of all material labor and T&P etc .
Providing and Laying LDPE Film 200 Micron below in C.C. including cost of all material, labour and T&P etc. for proper completion of work.
Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labourT&P etc.
Laying C.C.1:1.5:3 including cost of material, labour, T&P etc.
Colour washing of two coat of parapet including cost of all materials,labour and T&P etc.
E/W in embankment for restoration of canal section in all type of soil mixed including all lead ,lift dressing , etc.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_2063945.xls
BOQ • 0.26 MB
DOC_Belan.pdf
Tender Documents • 2.59 MB
Download all tender documents and submit your bid