| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Finance | -33.21% | ₹4.9 L | L1 | Admitted-Finance |
| 2 | L2₹5.2 L+₹31,767.48 (6.48%)Admitted-Finance | -28.88% | ₹5.2 L+₹31,767.48 (6.48%) | L2 | Admitted-Finance |
| 3 | L3₹5.7 L+₹81,509.63 (16.6%)Admitted-Finance | -22.10% | ₹5.7 L+₹81,509.63 (16.6%) | L3 | Admitted-Finance |
| 4 | L4₹5.7 L+₹82,243.29 (16.8%)Admitted-Finance | -22.00% | ₹5.7 L+₹82,243.29 (16.8%) | L4 | Admitted-Finance |
| 5 | L5₹6.2 L+₹1.3 L (27.3%)Admitted-Finance | -14.99% | ₹6.2 L+₹1.3 L (27.3%) | L5 | Admitted-Finance |
Tender Value
₹7.3 L
EMD Value
₹14,680
Closing Date
6 Aug 2026, 2:00 pmClosed
COMMISSIONER
Nagar Parishad Jalore
CONSTRUCTION OF CC ROAD FROM VAJAJIWALA ROAD TO SHANKAR LAL JI HOUSE IN W.NO.39
2026_DLB_582200_6
NPJ/DEV/2026/2825 DATE 27-07-2026
Open Tender
Civil Works
Percentage
90 days
Jalore
Please Refer Tender Documents
3 documents required · 3 mandatory
₹500
COMMISISONER/MD RISL
₹14,680
Yes
27 Aug 2026
5 Aug 2026
7 Aug 2026
5 Aug 2026
6 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | EConstruction of embankment with approved material obtained from
borrow pit with all lifts and leads, transporting to site, spreading,
grading to required slope and compacting by vibratory roller 8-10
tonne to meet requirement of table 300-2 including cost of
compensation for earth taken from private land complete as per
MoRT&H specification clause 305. (Lead taken upto 5 km | - | CUM | 178.5 | - |
| 1.02 | Providing, laying, spreading and compacting of granular sub-base by providing close graded Material, mixing in a mechanical mix plant atOMC, carriage of mixed Material to work site, spreading in uniform
layers with motor grader on prepared surface and compacting with
vibratory power roller to achieve the desired density, complete as
per MoRT&H specification clause - 401 including all material, labour,
machinery, lighting, guarding and maintenance of diversio | - | CUM | 1,375 | - |
| 1.03 | Providing and laying lean cement concrete 1:4:8 in Sub- base over aprepared sub-grade with coarse and fine aggregate conforming to
IS: 383, the size of coarse aggregate not exceeding 25 mm,aggregate cement ratio not to exceed 15:1, aggregate gradation
after blending to be as per table 600-1, cement content not to beless than 150 kg/ cum, optimum moisture content to be determined
during trial length construction, concrete strength not to be less than10 Mpa at 7 days, mixed in concrete mixer, laid manually,
compacted with surface vibrator, finishing and curing complete asper clause 601, 112 of MoRT&H specification including all material,labour, machinery, lighting, guarding and maintenance of diversion. | - | CUM | 2,955 | - |
| 1.04 | Providing and laying un-reinforced, dowel jointed, plain cement
concrete mix With Concrete Mixer & vibrator pavement over a
prepared sub base with 43 grade cement , coarse and fine
aggregate conforming to IS: 383, maximum size of coarse aggregatenot exceeding 25 mm, mixed as per approved mix design, laid,spread, compacted and finished in a continuous operation includingprovision of contraction, expansion, construction and longitudinaloints, joint filler, separation membrane, sealant primer, joint sealant,debonding strip, admixtures (if required) as approved, curingcompound, finishing to lines and grades complete as per drawingand as per clause 602, 112 of MoRT&H specification including allmaterial, labour, machinery, lighting, guarding and maintenance ofdiversion. PCC M-20 | - | CUM | 5,650 | - |
| 1.05 | Centring and shuttering with plywood or steel sheet upto two stories( each story of height upto 3.5 metre from floor level) includingstrutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete | - | SQM | 236.5 | - |
| 1.06 | Providing at site, lowering & laying in trenches, aligning & jointing of
RCC pipes NP4 class (with s/s ends) IS: 458 - 2003 (amended up to
date) marked and pipes from 300 mm and upto 1800 mm
manufactured through vertical / vibrated casting process at all
depths with Rubber gaskets (EPDM/SBR) for sewer lines as per IS:
5382 (including cost of Rubber gaskets, lubricants) as per drawing,
sectional hydro testing of the sewer pipe line (including cost and
conveyance of water to site for testing) etc., complete as per
specification and / or as directed by Engineer. Note : E/w to be
measured and paid separately. Length of pipe shall be measured in
between the outer wall of two manholes / Inspection chambers. Pipein the manhole/inspection chamber’s wall shall deemed to be
included in the item of manhole/inspection chamber shall not be
payable. 400 mm internal diamete | - | metre | 1,989 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.85 MB
BOQ_1034429.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .