| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.7 LAccepted-Finance | L1 | Accepted-Finance L1 BIDDER | |
| 2 | L2₹45.4 L+₹1.7 L (3.99%)Rejected-Finance | L2 | Rejected-Finance HIGHER THAN L1 BIDDER | |
| 3 | L3₹49.7 L+₹6.0 L (13.7%)Rejected-Finance 39 W 1 ASHOK VIHAR SAKET NAGAR KANPUR 208014 | KANPUR | KANPUR NAGAR | UTTAR PRADESH | 208014 | L3 | Rejected-Finance HIGHER THAN L1 BIDDER | |
| 4 | L4₹49.9 L+₹6.2 L (14.3%)Rejected-Finance | L4 | Rejected-Finance HIGHER THAN L1 BIDDER | |
| 5 | L5₹51.7 L+₹8.1 L (18.5%)Rejected-Finance 88 197 B CHAMAN GANJ KANPUR 208001 | KANPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | L5 | Rejected-Finance HIGHER THAN L1 BIDDER |
| Sl No | Description | Qty | Unit | M/s DKS Engineering Works L2 | GOPI CONSTRUSTION CO. L6 | N. K. ASSOCIATES L3 | M/S MAA TARA TREATMENT PROJECT L4 | FATEHPUR CONSTRUCTION COMPANY L7 | ASIA BUILDER L5 | Ashirwad Contractor and Supplier L8 | S DAYA SINGH L9 | AGREN ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of terracing tiles/brick tiles single layer on roof,laid bedded and pointed in any mortar complete all as specified and directed. | 234.5 | 10 Sqm | 250 ₹58,625 | 220 ₹51,590 | 285 ₹66,832.5 | 200 ₹46,900 | 250 ₹58,625 | 500 ₹1,17,250 | 215 ₹50,417.5 | 228 ₹53,466 | 153 ₹35,878.5 Lowest |
| 2.00 | Demolition of cement concrete of any description as in roofs, floors (other than ground floor) and similar suspended works complete all as specified and directed. | 117.25 | Cum | 400 ₹46,900 Lowest | 650 ₹76,212.5 | 618 ₹72,460.5 | 600 ₹70,350 | 663 ₹77,736.75 | 700 ₹82,075 | 620 ₹72,695 | 590 ₹69,177.5 | 445 ₹52,176.25 |
| 3.00 | M&L for PCC 1:2:4 type B-0 (using 12.5mm graded crushed stone agg) as in padding top surfaces to be finished even & smooth without using extra cement complete all as specified and directed. | 117.25 | Cum | 5,500 ₹6,44,875 | 6,300 ₹7,38,675 | 6,400 ₹7,50,400 | 6,400 ₹7,50,400 | 6,510 ₹7,63,297.5 | 7,400 ₹8,67,650 | 6,599 ₹7,73,732.75 | 6,800 ₹7,97,300 | 4,693 ₹5,50,254.25 Lowest |
| 4.00 | Rendering 10 mm thick in CM 1:3 finished even & smooth using liquid water proofing compound @ 200 Ml/50 Kg of cement over RCC roof padding etc complete all as specified and directed. | 2,345 | Sqm | 220 ₹5,15,900 | 250 ₹5,86,250 | 245 ₹5,74,525 | 250 ₹5,86,250 | 293 ₹6,87,085 | 245 ₹5,74,525 | 248 ₹5,81,560 | 255 ₹5,97,975 | 165 ₹3,86,925 Lowest |
| 5.00 | Supply only liquid water proofing compound complete all as specified and directed. | 78.89 | Ltr | 140 ₹11,044.01 | 210 ₹16,566.02 | 190 ₹14,988.3 | 200 ₹15,777.16 | 224 ₹17,670.42 | 125 ₹9,860.73 Lowest | 234 ₹18,459.28 | 230 ₹18,143.73 | 135 ₹10,649.58 |
| 6.00 | Preparation of concrete/Plastered surfaces by scrubbing down with steel brushes and cleaning with water all loose dirt/dust and applying following roof treatment complete all as directed by Engr-in-Charge :-
(a) Applying bituminous primer coat conforming to IS-3384 @ 0.4 Kg/Sqm cover prepared surface till the surface is properly impregnated and insolvent oil primer shall be allowed to evaporate completely.
(b) Applying water proofing treatment by using APP polymembrane mineral finished over roof and including vertical surfaces and providing APP membrane having non woven polyster film reinforcement with 3 mm thick and weight not less than 3.00 kg/sqm and finished on top with mineral/slate finished laid with 100 mm & 150 mm over lap on side & end laps respectively complete all as per manfucturer's instruction. The membrane has to be laid with LPG torch and overlap sealed and finished neat. All joint and changes in direction should be covered with cement mortar 1:3 mixed with SBR latex @ of 200ml/Bag of cement and curved before laying membrane and including applying two coats of bituminous aluminium paint over membrane surface complete all as specificed and directed. | 2,000 | Sqm | 600 ₹12,00,000 | 625 ₹12,50,000 | 615 ₹12,30,000 | 600 ₹12,00,000 | 653 ₹13,06,000 | 590 ₹11,80,000 | 700 ₹14,00,000 | 700 ₹14,00,000 | 489 ₹9,78,000 Lowest |
| 7.00 | Removing of demolished meterial to a distance of exc 100m and n exc 1000m or under, beyond the lead included in the rates, including loading, unloading complete all as specified and directed | 33.5 | Per load | 150 ₹5,025 | 120 ₹4,020 | 110 ₹3,685 Lowest | 200 ₹6,700 | 125 ₹4,187.5 | 200 ₹6,700 | 233 ₹7,805.5 | 725 ₹24,287.5 | 395 ₹13,232.5 |
| 8.00 | Dismantling of wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 6 | Qtl | 400 ₹2,400 | 680 ₹4,080 | 600 ₹3,600 | 700 ₹4,200 | 570 ₹3,420 | 600 ₹3,600 | 543 ₹3,258 | 535 ₹3,210 | 53 ₹318 Lowest |
| 9.00 | M&L Roof trusses (framed), trussed, purlins, crane gantries, rails and fastenings and heavy bracket framing (Beam, tee, angle, channel or flat sections) including distance pieces, cleats etc conforming to Fe 410 W (Gde-E-250) quality A complete all as specified and as directed. | 600 | Kg | 110 ₹66,000 | 220 ₹1,32,000 | 120 ₹72,000 | 150 ₹90,000 | 130 ₹78,000 | 124 ₹74,400 | 121 ₹72,600 | 118 ₹70,800 | 99 ₹59,400 Lowest |
| 10.00 | M&L for preparation of new steel or iron surfaces of any description exceeding 10 cm width or girth and applying two coats of synthetic enamel paint over and including a coat zink chrome red oxide primer complete all as specified and directed. | 30 | Sqm | 100 ₹3,000 | 120 ₹3,600 | 120 ₹3,600 | 150 ₹4,500 | 110 ₹3,300 | 99 ₹2,970 | 134 ₹4,020 | 142 ₹4,260 | 53 ₹1,590 Lowest |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
10 Jul 2026, 6:00 pmClosed
LT COL VIKRAMJEET SINGH REEN, GE
GE I Kanpur Cariappa Road Cantt Kanpur 208004
REPAIR TO ROOF TREATMENT, RETROFITTING AND ASSOCIATED WORK IN ZONE-II AREA UNDER AGE B/R-II OF GE (I) KANPUR
2026_MES_773375_1
GE(I)/KAN/T-49 OF 2026-27
Open Tender
Civil Works
Item Rate
180 days
KANPUR
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE (I) KANPUR
₹90,000
Yes
26 Sept 2026
19 Jun 2026
17 Jul 2026
19 Jun 2026
10 Jul 2026
3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of terracing tiles/brick tiles single layer on roof,laid bedded and pointed in any mortar complete all as specified and directed. | 234.5 | 10 Sqm | - | - |
| 2 | Demolition of cement concrete of any description as in roofs, floors (other than ground floor) and similar suspended works complete all as specified and directed. | 117.25 | Cum | 2 | ₹234.5 |
| 3 | M&L for PCC 1:2:4 type B-0 (using 12.5mm graded crushed stone agg) as in padding top surfaces to be finished even & smooth without using extra cement complete all as specified and directed. | 117.25 | Cum | 3 | ₹351.75 |
| 4 | Rendering 10 mm thick in CM 1:3 finished even & smooth using liquid water proofing compound @ 200 Ml/50 Kg of cement over RCC roof padding etc complete all as specified and directed. | 2,345 | Sqm | 4 | ₹9,380 |
| 5 | Supply only liquid water proofing compound complete all as specified and directed. | 78.89 | Ltr | 5 | ₹394.43 |
| 6 | Preparation of concrete/Plastered surfaces by scrubbing down with steel brushes and cleaning with water all loose dirt/dust and applying following roof treatment complete all as directed by Engr-in-Charge :-
(a) Applying bituminous primer coat conforming to IS-3384 @ 0.4 Kg/Sqm cover prepared surface till the surface is properly impregnated and insolvent oil primer shall be allowed to evaporate completely.
(b) Applying water proofing treatment by using APP polymembrane mineral finished over roof and including vertical surfaces and providing APP membrane having non woven polyster film reinforcement with 3 mm thick and weight not less than 3.00 kg/sqm and finished on top with mineral/slate finished laid with 100 mm & 150 mm over lap on side & end laps respectively complete all as per manfucturer's instruction. The membrane has to be laid with LPG torch and overlap sealed and finished neat. All joint and changes in direction should be covered with cement mortar 1:3 mixed with SBR latex @ of 200ml/Bag of cement and curved before laying membrane and including applying two coats of bituminous aluminium paint over membrane surface complete all as specificed and directed. | 2,000 | Sqm | 7 | ₹14,000 |
| 7 | Removing of demolished meterial to a distance of exc 100m and n exc 1000m or under, beyond the lead included in the rates, including loading, unloading complete all as specified and directed | 33.5 | Per load | 8 | ₹268 |
| 8 | Dismantling of wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 6 | Qtl | 9 | ₹54 |
| 9 | M&L Roof trusses (framed), trussed, purlins, crane gantries, rails and fastenings and heavy bracket framing (Beam, tee, angle, channel or flat sections) including distance pieces, cleats etc conforming to Fe 410 W (Gde-E-250) quality A complete all as specified and as directed. | 600 | Kg | 10 | ₹6,000 |
| 10 | M&L for preparation of new steel or iron surfaces of any description exceeding 10 cm width or girth and applying two coats of synthetic enamel paint over and including a coat zink chrome red oxide primer complete all as specified and directed. | 30 | Sqm | 11 | ₹330 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
TenderdocumentsT49.pdf
Tender Documents • 1.35 MB
BOQ_865963.xls
BOQ • 3.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .