Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.1 LAccepted-AOC PHAYANG GOMPA COMPLEX AGLING ROAD SKALZANGLING LEH LADAKH J K 194101 | LEH | LEH | LADAKH | 194101 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹21.3 L+₹1.1 L (5.54%)Rejected-Finance | L2 | Rejected-Finance OTHER THAN LOWEST | |
| 3 | L3₹21.5 L+₹1.3 L (6.66%)Rejected-Finance | L3 | Rejected-Finance OTHER THAN LOWEST |
Tender Value
Refer Docs
EMD Value
₹40,500
Closing Date
3 Mar 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Col S S Babu
Headquarters 138 Works Engineers Pin-914138 C/o 56 APO
PROVN OF INTERNAL ROADS AT SUP POINTS AT KHALSAR AND BASE CAMP AND SPL REPAIRS TO ROAD AT ZPB AND TC PARTAPUR UNDER GE PRATAPUR
2021_MES_418564_1
138WE/L-66/2020-21
Open Tender
Civil Works - Roads
Item Rate
180 days
GE Partapur
As per NIT
8 documents required · 8 mandatory
₹500
GE Partapur
₹40,500
Yes
8 Apr 2021
3 Feb 2021
5 Mar 2021
3 Feb 2021
3 Mar 2021
18 Feb 2021
60 days
Amount
Surface excavation not exceeding 30 cm deep and averaging 15 cm in hard/dense soil and getting out, complete all as specified and directed by Engr-in-Charge.
Removal of excavated material not exceeding 50m and depositing where directed at a level not exceeding 1.50m above starting point, complete all as specified and directed by Engr-in-Charge.
Rolling and consolidating formation surfaces in cutting with 8 to 12 tonne power roller, including filling in soft spots, depressions, etc. which occur during rolling (for portion coming in cutting/original ground only) to required camber and gradient, etc. including watering before or during rolling, all complete all as specified and as directed .
150 mm thick (spread thickness) soling (or sub base) with broken boulders or quarried stones of size range 100 to 50mm, deposited, spread, leveled in one layer, interstices filled, surface formed and rolled and consolidated to required gradient and camber with 8 to 12 tonne power roller, complete all as specified and as directed.
150mm thick (compacted thickness) wet mix macadam (WMM) in two layers each layer 75mm thick, using clean crushed stone graded aggregate and grannular material like graded coarse sand mixed with water in mixing plant spread and rolled to a dense mass on a prepared sub base to gradient and camber required, with 8 to 12 tonne power rooler complete as specified and as directed (Note : WMM should be layed with mechanical paver)
Preparing top surfaces of WBM/WMM of road by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surfaces with gunny bags to remove all loose dirt etc & providing evenly a priming/tack coat with bituminous primer viscosity of bitumen grade VG-10 @ 10.0 Kg per 10 Sqm and laying bituminous premix asphaltic semi-dense concrete 40 mm consolidated thickness with 5.5% binder (VG-30) content by weight of total mix, prepared in hot mix plant, rolled and compacted to required camber and gradient to uniform smooth surfaces by mechanical paver and rolled with 8 to 12 tonne power roller, complete all as specified and as directed. Note: Mixing to be carried out at Hot Mixing Plant and spreading by Mechanical paver
M&L for providing precast cement concrete 1:3:6, type C-1 (using 20mm graded crushed stone aggregates) as in kerb stones, with plain fair faces, including chamfers, weatherings, throating etc. and setting in cement mortar 1:4 complete with joints to match, complete all as specified and directed by Engr-in-Charge.
S&F Solar road studs/cat eye having 3 LED light of colour red/yellow on each side (total 6 Nos LED) housed in a tough pressure dia cast alluminium alloy of size 125 x 125 x 20 mm with built in stem nail 37 x 37 x 77 mm long (or as per manufacturers provision) for fixing with epoxy and well protect inside with tough, unbreakable polycarbonate with solar cell polycrystalline silicon/single crystalline silicon (3V, 75MA), storage battery : NiMH(1200 MAH), luminius mode varying/constant type, work temperature (-)25 to (+)65 degree centigrade, resists area in compression 30 tonne, water proof grade IP 767, complete all as specified and directed by Engr-in-Charge.
S&F Solar delineators road signals long stand of size 1000 x 47 mm made of polycarbonate and toughened aluminium allow body, delineator height of 80 mm (comprises of 4 super bright LEDs which give 360 degree viewing, well pretected inside with tough, unbreakable polycarbonate with solar cell polycrystalline silicon/single crystalline silicon (3V, 75MA), storage battery : NiMH(1200 MAH), luminius mode varying/constant type, work temperature (-)25 to (+)65 degree centigrade, resists area in compression 30 tonne, water proof grade IP 767 also has high intensity retro reflective band of 1" width for extra visibility, embeded in PCC 1:2:4, type B-1 (using 20mm graded crushed stone aggregates) block of size 300 x 300 x 300 mm, complete all as specified and directed by Engr-in-Charge.
M&L for providing plain cement concrete 1:4:8, type D-2 (using 40mm graded crushed stone aggregates) as in foundation filling and mass concrete, complete all as specified and directed by Engr-in-Charge.
Scarifying or picking up gravelled macadam or bituminous macadam surfaces area n exc. 400 Sqm and depth exc. 50mm but not exc. 100mm, stacking the serviceable material at site and removing the surplus material n exc. 50m, complete all as specified and directed by Engr-in-Charge.
M&L for 75 mm thick (compacted thickness) WBM with coarse aggregate of granite, trap or basalt stone of grading 2 (63 to 40mm size) or of grading 3 (50 to 20mm size), spread, rolled and consolidated with power roller of 8 to 12 tonne to required gradient and camber, complete all as specified and directed by Engr-in-Charge.
All as per srl item No 12 above but except material (aggregates obtained from Ser item No 11 to be used).
M&L for Premix Bituminous macadam, laid/rolled and compacted to required gradient and camber (consolidated thickness 75mm or less) binder contend paving bitumen any penetration, complete all as specified and directed by Engr-in-Charge.
Repair to pot holes any depth not exc. 1 Sqm each including sweeping free from dust and mud or water, scoring sunken surfaces in roads, path etc. cutting around edges to at least 25mm in depth, making good by applying priming/tack coat with bituminous (Grade VG-10) @ 5 Kg per 10 Sqm and laying bituminous premix asphaltic semi-dense concrete 30 mm consolidated thickness with 5.5% binder (VG-30) content by weight of total mix, prepared in hot mix plant, rolled and compacted to required camber and gradient to uniform smooth surfaces by mechanical paver and rolled with 8 to 10 tonne power roller, complete all as specified and directed. Note: Mixing to be carried out at Hot Mixing Plant and spreading by Mechanical paver.
Preparing top surfaces of WBM/WMM of road by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surfaces with gunny bags to remove all loose dirt etc & providing evenly a priming/tack coat with bituminous primer viscosity of bitumen grade VG-10 @ 10.0 Kg per 10 Sqm and laying bituminous premix asphaltic semi-dense concrete 30 mm consolidated thickness with 5.5% binder (VG-30) content by weight of total mix, prepared in hot mix plant, rolled and compacted to required camber and gradient to uniform smooth surfaces by mechanical paver and rolled with 8 to 12 tonne power roller, complete all as specified and as directed. Note: Mixing to be carried out at Hot Mixing Plant and spreading by Mechanical paver
Preparing existing black top surfaces of road by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surfaces with gunny bags to remove all loose dirt etc and providing evenly a priming/tack coat with bituminous primer viscosity of bitumen grade VG-10 @ 5.0 Kg per 10 Sqm and laying bituminous premix asphaltic semi-dense concrete 30 mm consolidated thickness with 5.5% binder (VG-30) content by weight of total mix, prepared in hot mix plant, rolled and compacted to required camber and gradient to uniform smooth surfaces by mechanical paver and rolled with 8 to 12 tonne power roller, complete all as specified and directed. Note: Mixing to be carried out at Hot Mixing Plant and spreading by Mechanical paver.
Preparation new bituminous surfaces of road by scratching spots, oils, greasy spots etc and applying hot thermoplastic road marking material strips confirming to British specification 3762 with 20% glass beads having reflective index of 1.5mm, 75% sptrical with indigenous or for foundation plan having sufficent strength to withstand heavy load without deformation and having softening point 25 to 30 of area in witdh of n.exc. 15cm strip in white or golden yellow colour according to IRC 35 -1970, complete all as specified and as directed by Engr-in-Charge. Note : Thermo plastic road marking paint shall be of Make : ASIAN/STP Ltd.
Feroz Engineering Works
BETONG BUILDERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .