Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance PLOT NO 35 ARVIND NAGAR CHANDRAPUR MAHARASHTRA 442401 INDIA | CHANDRAPUR | MAHARASHTRA | 442401 | Admitted-Finance |
| 2 | Admitted-Finance B 87 B 67 PRAGATI NAGAR NTPC COLONY P O JAMNIPALLI KORBA NTPC COLONY P O JAMNIPALLI KORBA CHHATTISGARH 495450 | KORBA | CHHATTISGARH | 495450 | Admitted-Finance |
Tender Value
₹2.0 Cr
EMD Value
₹2 L
Closing Date
4 Aug 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE(Works)
O/o Addl.CE(PnW)
Work contract for AOH of Boilers-Pressure Parts of Unit - 4 at 2x660MW, SSTPP,MPPGCL,Dongalia
2023_MPPGC_280764_2
WT-1998
Open Tender
Miscellaneous Works
Item Rate
50 days
SSTPP, Dongalia
As per NIT
17 documents required · 17 mandatory
₹5,000
Yes
₹2 L
Yes
6 Nov 2025
25 Jul 2023
4 Aug 2023
25 Jul 2023
4 Aug 2023
25 Jul 2023
SECTION-A
PREPARATION OF QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE:
INTERNAL CLEANING OF BOILER II ND PASS
CLEANING OF ASH FROM ECONOMIZER HOPPER, DEAD CHAMBER, CAT HOUSE DOG HOUSE
PREPARATION OF SCAFFOLDING IN BOILER HORIZONTAL PASS (SCREEN TUBES, RE-HEATER HANGER, SUPER HEATER HANGER TUBES)
PREPARATION OF SCAFFOLDING ABOVE ECONOMIZER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS.
PREPARATION OF SCAFFOLDING AT WW RING HEADER FOR INSPECTION OF RING HEADER & REFIXING/REPLACEMENT OF ORIFICES.
INSPECTION OF COMPLETE BOILER PRESSURE PARTS (I ST & II ND PASS)
INSPECTION/REPAIR OF ALL PEEP HOLES IN BOILER
CLEANING AND REPAIR OF All WIND BOXES
SERVICING OF SECONDARY/ADDITIONAL AIR PORT DAMPERS
PREPARATION OF SCAFFOLDING IN BOTTOM ASH HOPPER AND FRONT/REAR S- PANEL BACKSIDE, COVERING THE S- PANEL COMPLETELY WITH SHEETS FOR SIMULTANEOUS CHECKING, REPAIRING WORK IN BOTTOM ASH AREA AND FURNACE TOGATHER:
DYE PENETRATIONN TEST (DPT)
TRANSPORTATION OF ASH, SCRAPS, DEBRIS AND OTHER WASTE MATERIAL (INCL. LOADING. /UNLOADING)
THOROUGH CLEANING OF BOILER FROM INSIDE BY USING HYDRO-JET CLEANING METHOD
COMPLETE EXTERNAL CLEANING OF THE BOILER FROM TOP TO BOTTOM
SECTION-B
RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE (SHIELDING) IN VARIOUS AREAS OF BOILER TUBES.
PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY
(Section-C) WELDING OF HP JOINTS AND ALIGHMENTOF BOILER TUBES/COILS/BANKS
WATER WALL TUBES (PRIMARY AND SECONDARY PASS)/RIFLE TUBES, SCREEN TUBES, HANGER TUBES ETC.
PRIMARY SUPER HEATER TUBES
SECONDARY SUPER HEATER TUBES
TERTIARY SUPER HEATER TUBES
PRIMARY SUPERHEATER SUPPORT/HANGER TUBES
PRIMARY REHEATER SUPPORT/HANGER TUBES
PRIMARY AND SECONDARY REHEATER TUBES
ROOF TUBES
ECONOMIZER SUPPORT TUBES
ECONOMIZER COILS IN REHEATER AND SUPERHEATER PASS
ALIGNMENT OF COILS OF TERTIARY/FINAL SUPERHEATERS
ALIGNMENT OF COILS OF SECONDARY SUPERHEATERS
ALIGNMENT OF COILS OF SECONDRY/FINAL REHEATERS
ALIGNMENT OF COIL OF ECONOMIZER
ALIGNMENT OF COIL OF PRIMARY SUPERHEATER
ALIGNMENT OF PRIMARY REHEATER COIL
WELDING OF FINS
RE-ENFORCEMENT OF WELDED JOINTS
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS (SIZE 50mmX50mm)
CHECKING AND RECTIFICATION OF SUPPORTS/HANGERS OF CRITICAL PIPE LINES
CHECKING AND RECTIFICATION OF EXPANSION INDICATOR IN BOILER AREA
(Section-D) APPLICATION/REPAIR OF REFRACTORY (WHYTHEAT C/WHYTHEAT C PATCH) / BSF BLANKET AT VARIOUS LOCATIONS OF BOILER
BOTTOM ASH HOPPER GR-C
PENT HOUSE, DOORS & WINDOWS ETC. (ADDITIONAL AIR PORT/WATERWALL TUBES) GR.-C/HTC
MAN HOLES, PEEP HOLES, ROOF SEAL BOXES GR-C
HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP
(SECTION-E)
COMPLETE SERVICING/OVERHAULING OF HP VALVES (MIV/MOV)
>25 mm & up to 50 mm
>50mm & up to 100 mm
>100 mm & up to200 mm
Above 200 mm
COMPLETE SERVICING OF CONTROL VALVES (EXCLUDING ACTUATOR).
>25 mm & up to 50 mm
>50mm & up to 100 mm
>100 mm & upto200 mm
Above 200 mm
REPLACEMENT OF VALVES (WELDED TYPE)
Up to 25 mm
>25 mm & up to 50 mm
>50mm & up to 100 mm
(SECTION-F) 6.1. COMPLETE SERVICING OF SPRING-LOADED SAFETY VALVES
WATER SEPARATOR SV
MAIN STEAM LINES SV
CRH LINES SV
HRH LINES SV
ELECTROMATIC RELIEF VALVE AND PILOT VALVE
(SECTION G)
PREPARATION OF HP TUBE BENDS
REPAIR OF PENT HOUSE/SKIN CASING OF BOILER
REPAIRING OF DEAD CHAMBER
(SECTION H) APPLICATION OF THERMAL INSULATION
COMPLETE BOILER FROM BOTTOM ASH HOPPER TO PENT HOUSE
STEAM AND WATER PIPING
AIR HEATER & HOPPER
FUEL OIL AND ITS STEAM PIPING INCLUDING HEATERS FILTERS ETC.
(SECTION -I)
SERVICING OF MAIN STEAM STOP VALVE
SECTION-J
COMPLETE OVERHAULING & RESETTING OF WATER WALL SOOT BLOWER: -
COMPLETE OVERHAULING & RESETTING OF LONG RETRACTABLE SOOT BLOWER: -
(SECTION -K) INSTALLATION AND MAINTENANCE OF CCTV CAMERA TO DIFFERENT LOCATIONS OF BOILER
work of installation and implementation of CCTV surveillance system during AOH
ADORE CONTRACTORS PRIVATE LIMITED
stage.html
html • 0.03 MB
technical_344935.pdf
techsummary_344935.pdf
finance_344935.pdf
BOQ Comparative Chart
xlsx
cancelled_1.pdf
pdf • 0.27 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Tendernotice_2.pdf
PDF • 1.18 MB
SBDworks280764_2.pdf
Tender Documents • 25.32 MB
shortnit-280764_2.pdf
Tender Documents • 0.12 MB
Tenderschedule-280764_2.pdf
Tender Documents • 1.31 MB
detailednit-280764_2.pdf
Tender Documents • 0.28 MB
BOQ_344935.xls
BOQ • 0.29 MB
TechnicalBiD-280764_2.xls
Additional Documents • 0.31 MB
Credentials-280764_2.xls
Additional Documents • 0.09 MB
Annexures280764_2.pdf
Additional Documents • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .