Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance S A | Admitted-Finance |
Tender Value
₹71.1 L
EMD Value
₹72,000
Closing Date
17 Nov 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director
The Project Director DRDA Vellore
vellore District TNRRIS 2020-21 under SFC (BP) Strengthening of 4 Roads in Netteri,Vaduganthangal Pillanthipattu K.V.Kuppam panchayat at Vellore Block Package No.26
2020_RDTN_180797_1
A9/2183/2020
Open Tender
Civil Works - Roads
Works
180 days
DRDA Vellore
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹72,000
21 Nov 2020
22 Sept 2020
17 Nov 2020
22 Sept 2020
17 Nov 2020
22 Sept 2020
90 days
Amount
Strengthening of Road from TKVK Road to soorangkuppam road H/O Vaduganthagal panchayat in K.V.Kuppam block.Km 0/0 - 1/420 (Road code- R288)
Clearingthe Scrub jungle including cutting the scrubs and removing away from site etc.complete
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete (Km 0/0-1/420)
Collection and supply of Gritty Gravel for basecourse and Sideberm including cost and conveyance of gravel from approved sources to work site including labour for spreading,watering and compacting by power roller to achieve the required proctor density at 100% compaction
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete
Applying tackcoat over BT Surface using 4kgs of bitumen emulsion per 10sqm including cost of bitumen emulsion which will be supplied deparmentallyat section stores cost of which will be recovered at the issue rate as per the special condation for etc Complete
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials
Provision for HM stone
Provision for KM stone
Provision for Snigboard
Providing Name board charges
Strengthening of Road from Nettari to Pasumathur road H/O Pasumathur panchayat in K.V.Kuppam block.Km 0/0 - 1/070 (Road code- R260)
Clearingthe Scrub jungle including cutting the scrubs and removing away from site etc.complete
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete (Km 0/0-1/070)
Providing and laying Gravel for Sideberm including cost and conveyance of gravel from approved sources to work site including labour for spreading,watering and compacting by power roller to achieve the required proctor density at 100% compaction
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete
Applying tackcoat over BT Surface using 4kgs of bitumen emulsion per 10sqm including cost of bitumen emulsion which will be supplied deparmentallyat section stores cost of which will be recovered at the issue rate as per the special condation for etc Complete
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials
Construction of 1.5m RCC Slab Culvert @CH 0/920
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Collection and supply of sand and fillingin to the basement including cost and conveyance ot the site and all labour charges for filling as per standard specfications
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
First footing
slab centring
Plain Cement Concrete 1:3:6 mix using 40 mm ISS sine HBG metal including cost and conveyance of all materials and all labour charges etc complete.
Plain Cement Concrete 1:3:6 mix using 20 mm ISS sine HBG metal including cost and conveyance of all materials and all labour charges etc complete.
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire,etc.,complete
RCC 1:1.5:3 Mix using 20mm ISS Sine HBG metal including cost and conveyace of all material and all labour charges,etc.,
Bituman bad
Weepholes 900mm PVC Pipes
Provision for HM stone
Provision for KM stone
Provision for Snigboard
Providing Name board charges
Maintenance of the Road from Rajapalayam Road to vikkaramasimedu
Clearingthe Scrub jungle including cutting the scrubs and removing away from site etc.complete
Providing and laying Gravel for Sideberm including cost and conveyance of gravel from approved sources to work site including labour for spreading,watering and compacting by power roller to achieve the required proctor density at 100% compaction
Advance patch for making up the undulation in the exiting B.T surface to an average thickness of 50mm using 45mm metal IRC size HBG 44kg metal including cost and conveyance of all materials etc
Advance patch for making up the undulation in the exiting B.T surface to an average thickness of 25mm using 13.20mm metal IRC size HBG 44kg metal including cost and conveyance of all materials etc
Applying tackcoat over BT Surface using 4kgs of bitumen emulsion per 10sqm including cost of bitumen emulsion which will be supplied deparmentallyat section stores cost of which will be recovered at the issue rate as per the special condation for etc Complete
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials
Provision for HM stone
Provision for kM stone
Providing Name board charges
Maintenance of the Road from Pillanthipattu to odder Colony road,Km 0/0 - 1/140(R-156)
Clearingthe Scrub jungle including cutting the scrubs and removing away from site etc.complete
Collection and supply of Gritty Gravel for basecourse and Sideberm including cost and conveyance of gravel from approved sources to work site including labour for spreading,watering and compacting by power roller to achieve the required proctor density at 100% compaction
Advance patch for making up the undulation in the exiting B.T surface to an average thickness of 50mm using 45mm metal IRC size HBG 44kg metal including cost and conveyance of all materials etc
Advance patch for making up the undulation in the exiting B.T surface to an average thickness of 25mm using 13.20mm metal IRC size HBG 44kg metal including cost and conveyance of all materials etc
Applying tackcoat over BT Surface using 4kgs of bitumen emulsion per 10sqm including cost of bitumen emulsion which will be supplied deparmentallyat section stores cost of which will be recovered at the issue rate as per the special condation for etc Complete
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials
Provision for HM stone
Provision for kM stone
Providing Name board charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
S A Srinivasan
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .